Post Job Free
Sign in

Quality Assurance Plant Manager

Location:
Seminole, TX
Posted:
March 29, 2025

Contact this candidate

Resume:

Kevin

Hampton

SEMINOLE, TX *****-****

575-***-****

W: *********@*****.***

Skills

• Mechanics, auto/ industrial

• Pipeline inspection

• Running crews

• 1 Call

Operating plants /

maintenance

Over seeing construction

projects

Maintaining and operating

pipelines

Working well with others

and teaching what skills I

have in my field

• Hydrostatic testing

Blueprint and schematic

reading

• Data collection and analysis

• Regulatory compliance

Pipeline integrity

management

• Flow measurement devices

Hazardous materials

handling

• Leak detection systems

• Equipment troubleshooting

Preventative maintenance

practices

Quality assurance

procedures

• Non-destructive testing

Professional Summary

Accomplished Pipeline Technician with extensive experience at Aka, specializing in pipeline integrity management and construction oversight. Proven ability to lead teams effectively while ensuring regulatory compliance and safety. Skilled in leak detection systems and fostering teamwork, I excel in delivering high-quality results in challenging environments. Experience

Durango Midstream Maljamar, New Mexico

May 2019 - September 2024

Pipeline Technician

Did construction projects, as well as line replacements, Pigging of lines, 1 calls, repaired line leaks, maintained methanol injection pumps, over seen line crossings, and some corrosion inspection, chase high oxygen in gas stream

Aka Maljamar, New Mexico

April 2015 - May 2019

Pipeline Technician

This same job as Durango Midstream, Aka sold assets to Durango Midstream in 2019

Aka Maljamar, New Mexico

November 2009 - April 2015

Pipeline Foreman

I was pipeline Foreman with Aka until down size in 2015 I was over pipeline system for our Abo plant, over seen maintenance on lines, 1 calls, construction of new projects, line repairs, new meter hook ups, and also measurement department, kept up with new state regs, took care of all documentation for the pipeline system

Aka Canadian, Texas

October 2006 - November 2009

Cryogenic Plant Manager

I transferred to Canadian Tx in 2006, over seen Cryo plant build, Then went on to be Plant manager, over seen daily duties, took care of reports, helped operators when needed

Frontier Energy Maljamar, New Mexico

June 2003 - October 2006

Plant Mechanic/ Operations

• Environmental monitoring

Pipeline construction

methods

• Welding and fabrication

• Pigging operations

Valve operation and

maintenance

Corrosion control

techniques

Emergency response

planning

Pipeline inspection

techniques

• Pressure testing procedures

Safety training and

awareness

• In-line inspection tools

Gas chromatography

analysis

Teamwork and

communication

• Joint preparation

• Stress relieving

• Pipe beveling

Structural component

building

• Overhead crane operation

• Grinding techniques

• Oxy-fuel cutting

• Welding inspection

• Blueprint reading

• Layout and marking

• Safety procedures

• Surface grinding

• Frontier Energy purchased assets from Conoco in 2003

• I was plant mechanic / training in operations

Aka Maljamar, New Mexico

June 2002 - October 2006

Cryo Plant Operator / Mechanic

• In 2002 Aka bought assets from Frontier Energy

• I operated plant, while still worked in maintenance on days off Conoco Maljamar, New Mexico

May 2001 - June 2003

Plant Mechanic

• Came to work for Conoco in 2001as mechanic until they sold asset US Army FT Hood, Texas

December 1983 - December 1987

Track Vehicle Repaier

• Joined Army after High School

• Worked on Tanks ( turbine engines )

• Made rank of E 5 (Sargent)

• Worked on Tanks and other vehicles

Education

May 1983

Brownfield High School, Bronfield Texas

February 1984

Track Mechanic

Aberdeen Proving Grounds, Baltimore Maryland

Language

Native

english



Contact this candidate