Post Job Free
Sign in

Production Technician English Language

Location:
Dallas, TX
Posted:
May 19, 2025

Contact this candidate

Resume:

CURRICULUM VITAE

I. Production Technician

Ange Doudet Adimatcho

TEL: +1-432-***-****

Address: **** ******* ********* *** *** Midland TX 79705 USA EMAIL ADDRESS: **********@*****.***

BACKGROUND &SKILL

- 2019 Midland College Associate of Petroleum Energy Technology

- DECEMBER 2006: Advance Diploma of Technician in Telecoms System at City of Ghana Academy.

Accra-Ghana

- JUNE 2006: Diploma of Technician in Telecoms System, Wintech Professional Institute. Accra-Ghana

June 2005: Certificate of Technician Telecoms System in Wintech Professional Studies Accra-Ghana

JUNE 2004: Proficiency of English Language at Greenwich International Institute Accra – Ghana

- JUNE 2003: Bac “C” Math-Physic, Higher School Franco-anglais, Ndjamena-Chad

Program SUBJECTS PROGRAMS

- Petroleum Industry

- Distributed Control and Programmable Logic

- Networking Technologies

- Pumps, Compressors and Mechanical Drives

- Electronic Troubleshooting, Service and Repair

- Basic Fluid Power (Hydraulic & Pneumatic)

- Industry Automation (Programmable Logic Controller) Allen Brandley RS Logix 500

- OSHA

- Mechanical Skill for Energy

- Corrosive Basic - Industrial Mathematics

- Implementing and Supporting Client Operating System

- Petroleum Instrumentation - Reservoir Recovery and Production Methods

- DECEMBER 2006: Advance Diploma of Technician in Telecoms System at City of Ghana Academy.

Accra-Ghana

- JUNE 2006: Diploma of Technician in Telecoms System, Wintech Professional Institute. Accra-Ghana - -

- June 2005: Certificate of Technician Telecoms System in Wintech Professional Studies. Accra-Ghana - - -

- JUNE 2004: Proficiency of English Language at Greenwich International Institute Accra – Ghana

- JUNE 2003: Bac “C” Math-Physic, Higher School Franco-anglais, Ndjamena-Chad

PERSONAL PROFILE :

Proactivity and ability to work under pressure Effective communication and problems solving skills

Integrity and transparent honesty Good team work with strong analytical mind Ability to read and write

technical report Effective use of initiative, Physical alertness Ability to read string of installation in

downhole

WORKS EXPERIENCES (Onshore and Offshore)

-From October 2023 to Now Schlumberger as ESP Field Specialist

-From February 2023 to September 2023 New Fortress Energy as Gas Processing Operator

- From October 2022 to January 2023 Subsea Technician Oceaneering International

- From March 2022 to Now Cimarron Energy Field Technician

- From January 2019 to November 2019 HALLIBURTON SPERRY Drilling as Downhole Tool Mechanic Tech

- June 2015 to June 2017 Glencore Explorations &Productions as Production Operator

- From September 2013 up March 2015 SCHLUMBERGER ARTIFICIAL LIFT As: Artificial Lift Field Specialist,

TOTAL - Exploration and Production in Bugungu Project (UGANDA), PERENCO Exploration and

Production Project: Tchatamba, Oba, Nyougo, Olende (GABON)

- From January 2009 to December 2011 with WOOD GROUP ESP As: ESP and PCP Field Technician ESP

(Electric Submersible Pump), PCP (Progressing Cavity Pump)

- CIMARRON ENERGY DUTY: production and processing equipment, including vapor recovery units,

procedures and maintaining equipment to operate in the safest way possible Responsible for installation and repair of electrical, electronic, and pneumatic components on combustor packages,

ignition systems. Troubleshooting of electrical control panels,. Inspect existing control panels to

insure proper function and application. Installation and startup of equipment. Provide remote technical support to field operatives. Assist Field Service crews with equipment repairs and

maintenance as needed. Maintain paperwork and field tickets for billing purposes. travel and some

out-of-town stay. Flexibility to work hours necessary to meet customer requirements.

. Maintains Company truck and ensures all required, maintenance is performed. Adhere to company policies, procedures, and rules. Maintain a positive,

team-oriented attitude.

- ARTIFICIEL LIFT:

- ELECTRICAL SUBMERSIBLE PUMP

- PDI (Pre Deliverance Inspection), ESP Installations (RIH) & ESP Pull Out Of Hole - Y/Tool Job, Packer Job, Shroud Jobs . - Shimming and Splicing - Spooler set up.VSD Toshiba & Sensia Troubleshooting

,change parts (IGBT,Control Board,Interface Board,Jumber Board

,TVSS,Fusses,Diodes,Instruct…)Productions Optimization,Transformation test,tap Calculation.Mounting &Commissioning SCB3&20,Gateway

- Cable and Motors test using Megger, Fluke and Uniconn,Instruct Schlumberger for downhole gauge Reading. - Phase Rotation and sequence Test -ESP Equipment’s sizing

and Application -Motor and Seal Oil fill Service. Well Start UP.

- PROGRESSING CAVITY PUMP (PCP) -,PCP Installation(Assembly) and Dismantling (Pull out) –

Space Out – Drivehead Installations – Connection of suckers rods, pony rod – IPCP (Insert Progressing

Cavity Pump) DST Job with PCP and IPCP 's Strings

- PLANT PRODUCTIONS TECHNICIAN - Isolations of lines for pigs lunching from SPT (southern production

terminal) to LACT (lease automatic custody transfer) and pigs receiving from Mangara to SPT,Plant

Processing and Troubleshooting (heater treater tripped, pressure control valve,level control ) . PID and

PFD knoledge,Recycling from tanks to treaters via recycle pumps 212, Transfer and Exports Pumps Start

up and shut Down,Sampling for analyzing (Pourpoint Test, Total Petroleum Hydrocarbon Test, Basic

Sediment and Water Test ) assist Control Room Operator, Heater Treater Flushing, Flare System

Draining, Line up water Removal Unit (tank 500) to Wetland,Line up Water Removal Unit (tank 500) to

receive water (- from CPF (Center Production Facility )to Tank 500,Line up the recycle line, Skimming

from Water Removal Unit to Heater Treater or Vacuum Truck via skimming pump 502, Parameters

taking of Facilities (Water Tank, oil Production and Export Tanks,Heater Treater, Inlet and outlet

flowline ),Air Compressor Inspection and line up and draining. Gauge the Tanks - Daily monitoring of

multiple wells site by vehicle - Test, Calibrate and Troubleshoot equipment, ESDV reset and mechanical

problems. - Job is to be performed employing safe work practice while utilizing acceptable

environmental procedure to maximize earning while minimizing cost assigned oil and gas producing

.Wellhead and Flowline Daily reading record. Installs, commissions, maintains, and provides training for

various types of gas and oil production and processing - equipment, including vapor recovery units,

other rotary equipment, Burner Monitor systems. - Installation and repair of electrical, electronic, and

pneumatic components on combustor packages, vapor recovery units, compression units, generator

units, pump units, ignition systems and air fuel ration systems. - PLC & DCS

(CONTROL ROOM) -

AUTOMATION OF OIL WELL (ESP GAUGE) - PLANT MONITORING & PLANT INSTRUMENTATIONS, -

,HEATER TREATER,SEPARATORS (Phases 2&3)

- SAFETY KNOLEDGES:

- OSHA Programs

-Schlumberger QSHE Level 2 Certificate

- OPITO Approved Bosiet with CA – EBS Certificate

-TWIC Card

-Swing Rope/ Personnel Transfer

-Basic Rigging

-Fall Protection /Working at Heights

-First Aid/CPR/AED

- PEC Card

- OSHA 10 Hour General Industry Safety and Health Card



Contact this candidate