Post Job Free
Sign in

Maintenance Manager Production Supervisor

Location:
Lubbock, TX
Salary:
65000 dlls
Posted:
May 14, 2025

Contact this candidate

Resume:

JOSE G. SANCHEZ

**** **** ******* **, ** PASO, TX. 79938 H: 915-***-**** **********@*****.***

SUMMARY

I like technical area. My duties are work with Maintenance people and Production too. Hight motivated, team

work, Results Oriental, Gold Setter and Multi-task Orientated I have experiences as Mechanic, Sales

representative, Maintenance Manager and General Production Supervisor. I started my professional carrier on

charge of installation Water Pump unit for farmland.. One of all my satisfactions were in my last job we got the first

place in 3 times of energy save... of all 52 branches of Mexico.

SKILLS

Calm under pressure Time and Resource Optimization, Time

Management, Total quality

Supervision and training Strategic Planning,

Operations management Administrative Skills, Analytical Skills,

Complex problem solving Bilingual

Change Implementation

Budget Analysis, Budget Development, Problem Resolution,

Project Management, Project Planning

EXPERIENCE

08/2002 to 06/2017 Maintenance Manager

OXXO Cd.Juarez, Chihuahua

I use to be a Maintenance Manager for 245 convenience stores(facilities and

equipment).I founded of CADE.(energy saving committee). we won the first place for

three times. Of 52 States. As well we install news equipment and made new lay out.

I made the study to take off the ice Machines,whit this project

We save 42,000 dlls Monthly .

02/1988 to 02/2002 Facility Maintenance Manager

Surgikos (Jonson&johnson) Cd.Juarez, Chihuahua

I started as Mechanic Supervisor.in packing Machines of Medical products. I got a higher

position, I was charge of production as well.

I coordinated the calibration equipment in order to gets the ISO 9000.

I made some changes and redesign to Machines to reduce the set-up time,from 4 hours

to 5 minuets.

I implanted the TPM. I reduced the down time of production machines front 5% to 2.5 %.

We save 42,000 dlls. Per years.

01/1986 to 01/1988 Sales Representative

Shredder Bellows Parker

I implemented new courses for customers .I design Pneumatic and Hydraulics

system.

I advising the customer in some technical problem.

04/1980 to 08/1986 Building Superintendent

Jacuzzi Universal Monterrey, NL

I was in charge to continue the installation pumps for irrigation for farmlands.

The capacity of this equipment was 250 H.P The substation was of 1,500 KVA

The main challenger was I got the Construction with low budget.

I had to made some changes in the method of installation in addition that I had to

resolve some penalties for construction delays.

02/1974 to 02/1977 Mechanic

Fibras Quimicas Monterrey., NL

I give Maintenance to machinery and I helped to made pamplet and courses for

other Mechanic.

I give a idea to save bearing .My idea was to find the way to lubricate it.

EDUCATION AND TRAINING

1980 Mechanical Engineer: engineer

Universidad Autonoma de N.L Monterrey, NL, Mexico

2014 MBA: Administration

Tec Milenio(Tec. Monterrey) Cd.Juarez, Chihuahua, Mexico

ACTIVITIES AND HONORS

Leadership the plan production wile the Manager was on vacation.



Contact this candidate