CONTACT:
Email- ***************@*****.*** or *****************@*****.***
House address
No.30 Otunba Akin Joaquin Street Ago Palace, Okota Isolo Lagos Nigeria
PERSONAL SKILLS
Commercial acumen
Enthusiastic &Attention to details
ONYENKEZOR CHIKA KINGSLEY
A Competent Engineer and Project Manager with excellent communication, organizational and co-ordination skills with over 22 years’ experience in the Oil & Gas EPC/E&P / Petrochemical industries. My major areas of expertise and experience over these years are in: -
Engineering surveillance, Structural integrity assessment, Bid Evaluation, weight control, interface Coordination, Jacket platform life extension, FPSo debottlenecking, pre-commissioning and commissioning.
Construction engineering activities for Onshore and offshore structural/piping repairs, shoreline protection and Land reclamation.
Demonstrated QA/QC experience in supervision of all assigned projects and ensure implementation of ISO 9001 Quality Management system and environmental standards (ISO-14001)
Extensive knowledge of Class rules for vessels (LR, BV, ABS), offshore structures (DNV, API) and Operational guidelines (DNVGL) used by MWS.
Project management -; Planning, Scheduling, Tracking & Monitoring of Onshore, swamp & Offshore /Deep Offshore projects with other project entities and ability to work on projects on complex multicultural environment
Conceptual, FEED and Detail Engineering Design for both Brown and Green Field projects.
Familiar with international codes codes such as BS, AASHTO, UBC, ACI, ASCE, AWS, AISC, API, RP2A (WSD, ASD) EURO CODES, BS, DNV, (API-653 and 650) ABS, ASME 31.3, AASHTO, USACE and other company’s project documents (SHELL DEP’s., MPN GPs etc.)
Technical and Software Skills includes [SACS, STAAPRO, AUTOCAD, NAVIS Works, MS OFFICE, MATHCAD.MS PROJECT and Primavera (Basic)]. Others include ANSYS (CFD/FEA and ORCAFLEX)
Deep Offshore Structures Design and Management (Topsides &Hull), Jacket Platform Design, Steel Structures Design, Concrete Design, Foundation Design, Equipment Foundation Design (Onshore Asset) and management.
Process Safety enhancement/Improvement- (Elimination of blind spot) and ability to Interprets other Engineering Drawings including P&IDs, Mechanical Equipment Layout, Hazardous Area Classification, Single line diagrams.)
B.Eng. Civil Engineering (2nd Class Hons.), Federal University of Technology, Owerri. Nigeria. 2002.
MSc Subsea Engineering, University of Port Harcourt (ongoing)
Council for the Regulation of Engineering in Nigeria (COREN)MemberR22,550
Project Management professionals (Membership Registration in view)
•T-BOSIET(OPITO) Certificate Number:208555011607210006 Valid: July 2025
•100************ and DPR OSP No.0164698 valid September 2025.
•Project Management Professional Training. ExxonMobil Process Safety Enhancement Training. ExxonMobil System and Mechanical Completion Training, ExxonMobil Management of Change Training. ExxonMobil Quality Management Course, ExxonMobil Capital projects Systems (EMCAPS) ExxonMobil SAFE CHOICE Training. Bonga ISSOW Level 1 Training (SNEPCo) Crosby Lifting Training (ADDAX Petroleum)
STRUCMARINE ENGINEERING LIMITED -LAGOS NIGERIA
Position Held: Project Engineering Manager. Period: April 2020 till date
Projects worked below:
•BW Offshore ABO FPSo Hull UTM Survey Review project. BW Offshore FPSo Sendje Barge Structural Integrity project. Anoh Gas processing projects Egbaoma flow-station crude oil storage tank project (3rd party Review) JV Upgrade Projects (Exxonmobil) ERHA FPSo Restoration Project. Usan FPSo Pipeline Replacement Project. Subsea Lifting in West Atlantic Shipyard Front Puffin FPSo Modification at Samsung Shipyard Lagos Exxon Mobil Pipeline Repairs project. Warri Refinery & Petrochemical Modification Project.
• Engineering Design, Procurement of Auto sampler and Installation of (One off Complete JISKOOTTM Jetline sampling and analysis and Bi-Directional Prover) in OML 111(NPDC)
Coordinates STRUCMARINE internal resources and third party /vendor for flawless execution of projects.
Managed and coordinated a Team of multidiscipline Engineers to achieve a cost-effective design through timely resolution of technical and engineering issue
Lead Project Teams formed to provide complete project management services and executed assigned projects worth over $300M in onshore/offshore asset from inception to completion and handover.
Monitored plan versus actual cost phasing and mitigate actions for recovery
Prepare and implement Project Execution and QHSE Plans for all assigned projects
Participated and monitored Planning, Cost Control, Budgeting, Contract Administration, Progress Reporting, Change Management and Gate Approval activities
Performed conceptual, FEED, and detailed weight analyses and estimates as per design basis, project specifications, design codes and standards.
Participated in the preparation of tender packages, tendering process, evaluation of tenders and submissions with appropriate recommendations to relevant Tender Committees
Provided inputs for actual, planning and forecasting progress reports associated with projects
Reviewed and supports approvals of Invitation to Tender (ITT) including Scope of Work, Compensation
Generated and maintained risk registers by updating these to ensure that risks are managed and mitigated
Performed design verification through single discipline check and assists with inter-discipline checks (IDC).
Ensured timely issuance of all Engineering deliverables (Mechanical, Piping, Instrumentation, Control, Civil, and Structural) and technical internal/external interfaces for Projects Engineering Support.
Developed document procedures for weight control on project-during engineering and construction phase (greenfield/brownfield)
Reviewed the project resources, cost estimates, analyze cost estimate and identify & develop contingency or special cost allowance against risks, unknowns, uncertainties or constraints and coordinate the benchmark against historical data & industry norms.
Developed Early Project Execution Plan (EPEP), Lesson Learned and co-developed Cost, Schedule and Design Engineering Management Plan including Engineering Surveillance Plan. Identify Risk Assessment Plan, key execution issues and respective resolutions.
Provided Engineering support (Mechanical, Piping, Instrumentation, Control, Civil, and Structural) to Fabrication, Construction and Installation.
Monitored and provided necessary guidance to the FEED, EPC Contractor(s) and all 3rd Party Services throughout the project phases. Ensures the facilities are constructed per the scope, meeting company’s standards and specifications, within the time and project cost approved by the shareholders
Performed BW Offshore ABO FPSo Hull structural integrity assessment on Bulkheads based on UTM Survey Report.
Interface closely with End Users and other stakeholders including government and statutory authorities, other third-party entities such as JVs
Participated in the reviewed and development of client procedures and guidelines as and when assigned
Perform structural integrity (FEA-Using Ansys) of BW Offshore FPSo Sendje Barge topsides and HULL transverse deck beams, web frames /Transverse bullheads including MOORING LINES to determine the stress regime.
Ensured timely project execution and implementing the Company integrity and reliability systems as per project plan
Participate in the processing and resolution of Variations and Contractor’s claims
Prepared structural design calculations for the steel structures and reinforced concrete foundations for various equipment (Pump, Generator Shelter. Vent Stack, Foundation).
Performed FPSo LDHI SKID design using SACS Software and miscellaneous design calculations.
Other Projects Engagement includes Support of EGWA 30,000 BPD Flow Station. As - Engineering Lead
Supported project concept selection and planning, develop Project Objective & Strategy (POS), Capital Efficiency, Cost Screening & Estimate, Schedule Screening & Estimate and Project Development Memorandum (PDM), Roadmap, Deliverable Responsibility & Authority Matrix (DRAM),
Reviewed and validated the Engineering(Mechanical, Piping, Instrumentation, Control, Civil, and Structural) and report of the following Equipment;
Skid foundation for Mechanical, Piping, Instrumentation, Control, Civil, and Structural design and miscellaneous calculation Report for civil/structural
Test separator Skid foundation design and miscellaneous calculation Report for civil/structural,
Inlet Manifold Skid Foundation Design and Lact Unit Foundation Design. (civil/structural)
Involved in the review of other Engineering deliverables such as Process(P&IDS), Electrical/Instrumentation and Mechanical equipment layout
And Another Projects Engagement to Support of [Bonga Sewage Treatment Plant (STP) and Bonga IGFU Separator Level Gauges] (SNEPCo Project) as Construction Lead Engineer by DORMAN LONG ENGINEERING LIMITED. (July – Sept 2021 on one off basis)
•Coordinates Dorman Long Engineering personnel resources in Bonga FPSo for flawless execution of projects.
•Reviewed the correct application of Construction strategies and proper assessment of Contractors performance against prescribed plans using key metrics and proper identification of remedial action.
•Reviewed the correct application of Construction strategies and proper assessment of Contractors performance against prescribed plans using key metrics and proper identification of remedial action
•Prepared daily/weekly progress report in accordance with contract requirement.
•Demonstrated QA/QC experience in supervision and ensure implementation of ISO 9001 Quality Management system.
•Prepared construction methodology for the projects.
•Reviewed and made input all the procedures including Demolition procedures (Work method statement, lifting procedure, Flushing/purging procedure, isolation procedure and scaffolding procedure)
•Monitored all the Structural, Electrical and mechanical Installation to ensure it’s in accordance with design and project specification and also to ensure safety of personnel and equipments.
•Responsible for site HSE performance of the project and ensure that all HSE issues are addressed and system developed to manage HSE concern.
•Maintained comprehensive project documentation in preparation for Pre-commissioning and Commissioning of the project.
•Closed-out all ITRs for pre-commissioning and Commissioning.
•Ensured that all the ITRs, Pre-commissioning, commissioning documents and turnover certificate are signed and documented
MOBIL PRODUCING UNLIMITED MPN -LAGOS NIGERIA
Position Held: Civil Structural Engineer 1 (Advisor)/Project Engineer (Contract position). Period: Jan 22nd 2018 – March 2020.
Projects worked below:
BRT Flare Gas Project BRT Dom Gas Project ASASA VB Gaslift Project QIT QPDUP Power upgrades projects. JV Upgrade Projects (MPN) Usan FPSO gas re-route project Oso Topsides facilities Structural assessment projects Erha FPSo Restoration Project JV Firewater Upgrade Project
•Developed Engineering Packages (Scope of Work, Specifications) and provide Technical Support to Project Team during EXECUTE. This involved review of Contractor Design Documents/Analysis, Detail Drawings, Technical Queries and Variation Orders.
•Performed In-service (Inplace and Fatigue) and Pre-service (Lifting and transportation analysis) with SACS including Sea-fastening design.
•Collate weight and center of gravity information for components of topside structures and assemble data into MS Access database and prepare weight and center of gravity calculations and reports for modules or decks for various conditions e.g. dry weight, operating weight, lift or transport conditions
•Reviewed various structural analysis designs of steel structures, steel pipe rack supports and industrial warehouse steel building design using STAADpro software.
•Reviewed all Civil Structural deliverables including drawings and design reports produced by Contractors.
•Participated in finalizing all deliverables lists and ensuring compliance with specifications and functional integrity
•Reviewed vendor and subcontractor submittals, checking for compliance with project specifications and providing comments as necessary.
•Reviewed Design & Detailing of Transformer Foundations, Foundation for Static equipment, Vessels, Pump Foundations, Heat exchangers etc
•Experienced in jacket brownfield modification related analyses like re-assessment of global inplace, boat impact, jacket spectral fatigue and pushover analyses.
•Participated in Risk Assessments / Risk Register Meetings, HAZID, JHA.JSA and Constructability Reviews.
•Provided all the civil structural and offshore structures inputs into SIMOPs (simultaneous operations), HAZOP, HAZID and other technical safety activities.
•Contributed to the development and execution of safe work processes, operating procedures and guidelines to ensure process safety, operational safety and plant integrity.
NATIONAL ENGINEERING AND TECHNICAL COMPANY (NETCO) -LAGOS NIGERIA
Position Held: Principal Structural/Project Engineer. (Contract position). Period: May 2017 – October 2017
Project worked
Bonga South West Aparo FPSO FEED Update
Reviewed Technical Documentation/Requirements which include Design Brief, Design Basis and Design Specifications.
Performed Structural analysis of Bonga Southwest FPSo Topsides – In-service (In place analysis) and Pre-service (Lifting and Transportation analysis of all Topsides Main – Racks using SACS software and calculation notes.
Carried out Miscellaneous design calculations of Padeyes stoppers and Joists.
Reviewed design and Calculation notes of others topsides modules. (Port Subsea Module and Power Module) using SACS software.
SHELL NIGERIA EXPLORATION AND PRODUCTION COMPANY (SNEPCo) -LAGOS NIGERIA
Position Held: Lead offshore Structural /Snr.Project Engineer (Contract position). Period: April 2010 – March 2017
Project worked below (FPSO TOPSIDES AND SUBSEA STRUCTURES)
Bonga Main FPSo Corrosion Damage Remediation Projects. Bonga Main FPSo Phase 2 and 3 Projects. (Subsea & Pipeline) EA DPA, DPA and DPJ Fixed jacket and Topsides platform modification Projects RPA Riser platform integrity Checks Projects. Bonga Main Single Point Moring Boat Catcher Project Main Chemical Laboratory project Bonga main LDHI skid project. Radar Mast project. SeaEagle FPSo VSAT Pedestal Structural project. HVAC/Air Compressor Relocation projects. Oil heat exchanger pulling frame project. Vapor Recovery Unit. (VRU) support structures integrity and Chemical Injection flow meter Skid projects Non- linear Analysis study of Bonga FPSO Flare boom/Platform project. 4th cartridge Filter walkway Extension and pipe support project. Produced water Train 2 project. Bonga HP Condensate Replacement Project. Bonga North Project.
•Defined concepts and developed scope of work for engineering designs for brown field modification to existing facility.
•Lead Front End Engineering Design (FEED) activities in converting the technical and operational requirements from the Concept Selection phase into Basic Engineering phase which deliverables (including Design Basis Memorandum and Engineering Specifications) form the basis of tender document for EPC phase and lead Engineering, Procurement and Construction (EPC) phase and coidentify Maintainability (including spares) and Operability requirements.
•Reviewed and supports approvals of Invitation to Tender (ITT) including Scope of Work, Compensation. Incentives, Technical and Commercial Evaluation Criteria and manage equipment-vendor’s prequalification and equipment-vendor’s selection ensuring all standards, technical requirement, operational and SHE requirements are met
•Performed various In-Service (Inplace and fatigue) and Pre-Service Analyses (Lift, Load-out, and Transportation) and design, miscellaneous structural design works.
•Converted Bonga Main FPSO Port process module Strucad Files to Sacs input Files.
•Designed SCR (Steel catenary riser) for Bonga using Orca flex
•Managed and oversees strategic planning of structural/Piping part of the project related to modification and upgrade of the facilities.
•Ensured good Communicate with all stakeholders (Management, Process team, engineering contractors) affected by the projects.
•Report progress (daily/weekly) and problem areas related to the execution of the work and make management aware of the issues that may affect schedule and cost.
•Checked, reviewed all structural deliverables and ensure that all technical accuracy and quality of structural discipline such as structural analysis, design calculations, drawings are in accordance with specification and standards.
•Participated in all risk assessment, constructability and HAZID reviews (onshore and offshore) of engineering deliverables.
•Prepared project close-out and lesson learnt report upon completion.
•Developed Bonga phase 2/3 Jumper installation rigging load test requirement.
•Performed Bonga Main FPSo B48, B51, B52, B53, B57and B60 (Production and water injection jumpers) Jumper lifting Analyses (Vessel to Vessel, Deployment and Recovery)
•Developed all the rigging requirement for future rigging analysis and Generic jumper C.o.g rigging calculations
•Monitored the deployment/installation of B51 production jumper.
•Design rigging calculations for Lifting Padeyes for Lower rigging, upper Quad plate rigging, Trip late rigging, and Link plate rigging) and also Generate rigging drawings.
Other Project worked below;
BONGA FPSo Southwest/APARO Project-Front End Engineering Design (FEED)
•Performed analysis & design of topsides Main Racks (9 Nos.) to be installed on the hull of FPSO. The main Racks were analyzed and checked for Inplace, Lifting and Transportation conditions. The analysis and design were carried out using SACS software package.
•Carried out Miscellaneous calculations Design for Pipe racks, Equipment Supports, Access Platforms etc. Verification of Secondary framing beams, Nodes Connection design and Material Take-offs.
•Reviewed of In-Service (Inplace) and Pre-Service Analyses (Lift, Load-out, Transportation) for Future module 1 & 2, IGG Inert gas Generator Module and GC Future from 3rd party contractors, checked drawings, design report, design basis and specifications and MTOs.
•Reviewed FPSo Hull design report and drawings from 3rd party contractors.
Bonga Main FPSO Debottlenecking Study (Phase 3 Feasibility Study)
Life Extension for EA OGGS RPA Jacket Platform project.
Participated in the review of subsurface report for the debottlenecking project.
Carried out site verification to assess the footprint /available deck space for additional topsides facility and strengthen of the existing structure as required.
Performed In-service (Inplace, and fatigue analysis) and Pre-service (Lifting and transportation analysis) using SACS including Sea-fastening.
Participated in P&IDs and PFDs reviews and preliminary members sizing calculation for the new deck extension and pipe supports,
Redlined the existing drawings for as built documentation.
Prepared design report report and recommendation.
ADDAX PETROLEUM DEVELOPMENT COMPANY (SINOPEC ADDAX) -LAGOS NIGERIA
Position Held: Senior Structural/Project Engineer (Contract position) Period: April 2008 – Dec. 2009
Providing structural /project engineering support for various oil field developments (Integrated field development project)
Project worked
Adanga Redevelopment Platform (ADPP1 & ADRP) project. (design, fabrication and installation) Oron West wellhead Platform Modification Project (fabrication and installation) Adanga Main Water Injection (AD1-22) Platform Modification Project. Adanga North EWT Platform (ADN4H). (Design and fabrication) Izombe Flare Down Project (Design, fabrication/construction) Adanga A and B Platform Project (Green field)(Design and Fabrication).
•Checked and reviewed all structural deliverables and ensured that all technical accuracy and quality of structural deliverables such as structural analysis, design calculation, drawings are in accordance with specification and standards.
•Reviewed various In-service analysis (In-service, Fatigue) and Pre-service analysis (Lifting, Load-out and Transportation)
•Developed and validated all design spreadsheet for the structural analysis as applicable.
•Checked all draft drawings on equipment support to ensure it conformed with the engineering design specifications and standards.
•Prepared materials take-off (MTO) and purchase requisition and followed up for timely approval and purchase.
•Prepared man-hour estimates and civil/structural execution procedure for inclusion in document for brown field works/project.
•Coordinates material traceability and inspection in accordance with heat code and heat number.
•Coordinates work to be undertaken by main contractor and sub-contractor as applicable with goals of achieving contract cost and schedule targets.
DELTAFRIK ENGINEERING LIMITED (WORLEY PARSON CO.) - LAGOS NIGERIA
Position Held: Structural Engineer (Permanent position) Period: February 2006 – March. 2008
Project worked below;
Onshore Asset gas management project (makaraba and utonana)-installation of multiphase (MPP) and modification of all utilities and control-To gather the gas being flared at CNL Onshore facilities.
Oso Condensate Pipeline Replacement Project- RH – RR Pigging facilities Upgrade. – Relocation of pig Launcher and Receiver from FR and Oso RK platform respectively and install same on the Oso RH and RR respectively.
Asasa Development Project. –Structural analysis and Engineering design of topsides structures which include but not limited to SACS Modeling of entire structure. (Etim LA and Etim LD)
•Carried out Inplace, Transportation & Lift Analysis and other miscellaneous design of Sea Fastening and design of Padeyes and also prepared design report.
•Designed the Deck extensions using SACs software.
•Designed the secondary the pipe supports and equipment supports manually using excel spreadsheet.
•Completed Weight report compilation works in accordance with the client requirements.
Prepared site visit checklist and site Visit report.
TITAN ENGINEERS AND CONSTRUCTION LIMITED PORTHARCOURT RIVERS STATE:
Position Held: Associate Structural Engineer Period: February 2005 – Jan. 2006
Project worked
Structural Re-validation of EIU Platform; Jacket and Topsides.
Performed structural analysis and Design of accommodation building (Living Quarters) for the INIM Platforms.
Prepared MTOs and Design Calculation report.
BUSSDOR & COMPANY LIMITED - PORTHARCOURT RIVERS STSTE
Position Held: Civil/Project Site Engineer (Permanent position) Period: March 2003 – Jan. 2005
Project worked below;
Shoreline reclamation and shore protection Project at Amasoma Bayelsa state (NDDC) Horamb Industrial building Complex. Construction of Osomoto Hospital Complex Oguta. (NDDC) Execution of Turnkey Projects including foundation, Equipment support construction for oilfield flow station (ADDAX PETROLEUM PROJECT).
•Reviewed the geotechnical considerations in shoreline protection and land reclamation and environment Impact Assessment (EIA) for Amasoma project.
•Supervised painting and installation of steel sheet piles for the shoreline protection work.
•Managed the issues and concerns in collaboration with community liaison officer for hitch-free construction work.
•Liaised with material and QA/QC engineers to ensure that materials for construction meets required applicable standard and specifications.
•Report progress (daily/weekly) and problem areas related to the execution of the work and make management aware of the issues that may affect schedule and cost.
•Supervised the building construction from foundation to completion.
•Supervised construction of Culverts, Paving Layout & Drainage Systems