Post Job Free
Sign in

Human Resources Quality Control

Location:
Silverthorne, CO
Posted:
March 04, 2025

Contact this candidate

Resume:

Michael D Graham

**** ****** ** • Silverthorne, Colorado 80498

970-***-**** • *********@*******.***

*/**/**

To add,

For the last 4 plus years, I have been working in Denver as a Lead Superintendent for Holland Development. We are building high rise Multifamily Apartment buildings mixed with Retail and Commercial use structures. Day to day, I collaborate with the City of Denver and the Denver Fire Department. And our architects, engineers, designers and consultants. I manage our construction team of superintendents and project managers.

I have 30 years of experience having built 3 of my own homes (1 million $ plus) in Silverthorne and several Multifamily projects as well as many retail and commercial projects in the mountains. Including the Silverthorne Factory Stores and Harvey's Wagon Wheel Casino. I have done several projects in the Town of Vail. I have developed my own properties in Buena Vista. I have my Class A Denver Contractors License.

I am looking forward to visiting with you and thank you in advance for considering me for the position of Construction Operations Coordinator / Manager.

Mike Graham 970-***-****

Michael D Graham

106 Blue Grouse Ln • Silverthorne, Colorado 80498

970-***-**** • *********@*******.***

Operations Manager, Lead Superintendent, Superintendent-Project Manager, Quality Control

Self-motivated and results driven professional with 30 years experience in the construction industry. Successfully delivering projects on time and under budget. Leadership and team building a strong suit. Ability to turn troubled jobs around by identifying key component problems with Safety, Quality, Schedule and Budget. Additional strong point: Quality Control and Documentation. Well versed with pre-construction and design build planning and development. Willing to travel.

Federally Funded Heavy and Highway projects • Affordable housing neighborhoods • Commercial Retail Centers

Industrial and Government buildings • Condominiums • Apartment and Employee Housing • High-end Resort Income Properties • Parking Structures •Medical Center • US Army Corps of Engineers • Large Custom homes

PROFESSIONAL EXPERIENCE

MANSON CONSTRUCTION • New Orleans, LA • 2010- 2012

Heavy civil contractor company specializing in intra-coastal and marine work. Primarily with the Army Corps of Engineers.

Superintendent:

(100 million or so) GIWW by pass gate and the Bayou Bienvenue sector gate located on the Inner Harbor Navigation Canal Levy in New Orleans.

Built the team and field supervised 40 to 50 field craft workers, engineers and Quality control personnel in the successful completion and the ongoing construction of the by-pass gate and the sector gate. Monitoring shop drawings and plans and specification adherence with the construction consisting of pile driving, coffer cell installation, structural steel and rebar placement. Installation of concrete forming equipment for 35 foot tall walls, base slabs and upper slabs. Placing all concrete as specified and finishing concrete with very strict tolerances. Supporting our client in quality control and preparation meetings. Conducting field quality control and safety meetings and providing quality control and safety documentation.

SWINERTON BUILDERS • Aspen, Colorado • Nov 2007- 2010

Construction general contractor company with 300 employees

Superintendent:

(270 M) Four Seasons 45 story high rise condominium and hotel in Denver CO

Supervised subcontractors with quality control and punch lists. I generated, drafted and distributed punch lists for all facets of work from excavation to final room close-out on a very high profile and very high end project with strict code compliance and extremely high levels of quality. Adhering to all state and local codes as well as the Four Seasons specifications. The project was successfully completed 2010 and won several awards.

Superintendent:

($ 98M) Residences at Little Nell 2007-2008 Aspen, Colorado

24 units, one sixth time share ($18m) condominiums units and 2 level parking structures. 218,000 sf. successfully delivered a troubled project to C.O. and tenant move in after the general superintendent and manager were fired. Subcontractor compliance, poor quality and behind schedule were just a few of the many hurdles to overcome. Accomplished by identifying the issues, notifying the right parties and removing the hurdles for subcontractor success. Implementation of Quality Control checklists. Open up lines of communication with the Owner, Architect, and Contractor for expatiate problem solving.

Superintendent:

(500 M) Pre-Construction Value Engineering Jan 2007- Nov 2007

Supported Pre-construction work on a $500M infra-structure and building complex in Vail CO for KEEN Partners. Utilization of Primavera Sure-track, BIM AutoCAD and Construction Manager Software. Project approved by the town of Vail after several presentations. Developer stopped work.

R.A. NELSON & ASSOCIATES, INC. • Avon, Colorado • 2003 - 2007

Construction general contractor company with 150 employees

General Superintendent:

($38M) Mountain View Condominiums 2006-2007 Vail, Colorado

(24) $1M to $2M condominium units, 4 story pre-cast structure with 3 stories below grade pre-cast parking structure. 68,000 sf.

• The project required working extensively with Town of Vail and CDOT due to the proximity of I-70 and frontage road easements.

• Limited hours and limited access was a major challenge

($29M) Gore Creek Place 2004-2006 Vail, Colorado

(16) $5-6M Townhome Residences with integrated underground parking structure. Total Construction: 104,000 sq. ft.

• Dewatering and soil stabilization was a major challenge

• Installation of water and sewer mains access difficult

($31M) Miller Ranch 2003-2005 Edwards, Colorado

(282) Residential units including single family, duplex, town home and condominium structures of an affordable housing development. Monitored and recorded many inspections and draw schedules for our client. Scheduling done by Primavera Sure-track and Expedition record keeping. Total Construction: 320,000 sq. ft. Federally Funded Project

• High volume of QC documentation and budget tracking

COLORADO FIRST CONSTRUCTION • 2000-2003 • Golden, CO

Construction general contractor company with 150 employees

($40M) Prospect Park Apartments 2002-2003 Denver, CO

Apartment Complex that consisted of (3) 4-Story stick frame buildings, separate 5 story parking structures and a 7acre lower downtown water shed with water and sewer main infrastructure. Total Construction: 900,200 sq. ft.

($8.5M) Glenwood Springs Community Center 2001-2002 Glenwood Springs, CO

Athletic facility with racquetball & basketball courts, state of the art climbing wall, and covered outdoor hockey arena. Total Construction: 68,000 sq. ft.

K2 Tectonics • Buena Vista, CO • 1997-2000

Owned and operated K2 Tectonics,

Developed raw land from sketch plan to building a 58 acre industrial park with in house utility infra-structure, road, concrete and steel building crews. 40 employees. Also built 3 custom homes at around $900,000 each.

COLORADO FIRST CONSTRUCTION • 1986-1997 • Golden, CO

Construction general contractor company with 150 employees

Superintendent:

($16.5M) The Villas at Brett Ranch 1997-1998 Edwards, CO

(15) 2-story buildings pool & hot tub Total Construction: 370,000 sq. ft. took it from excavation to dry-in.

($7.6M) River Edge Employee Housing 1995-1997 Avon, CO

(60 units) Three 3-story residential buildings Total Construction: 198,000 sq. ft.

($7.5M) Avon Crossing 1993-1995 Avon, CO

(60 units) (3) Three 3-story residential buildings Total Construction: 260,000 sq. ft.

($10M) Wintergreen Development 1991-1993 Avon, Colorado

(100) Multi-family housing complex on the Eagle river Total Construction: 80,000 sq. ft.

($15M) Silverthorne Factory Stores, Phases I, II, & III 1988-1990 Silverthorne, Colorado

(80 retail units) High profile,I-70 corridor, phased retail construction with extensive infrastructure, water & sewer improvements Total Construction: 450,000 sq. ft.

($25M) Harvey’s Wagon Wheel 1987-1988 Central City, Colorado

Hotel and Casino with 3-story underground parking garage. Extensive excavation created by pre-shear and production blasting of 300 ft. vertical granite. Rock bolting and soil nailing. Total Construction: 248,000 sq. ft.

($8M) Frisco Station Retail Strip Mall 1986-1987 Frisco, CO

(24) Retail units consisting of CMU walls and structural steel roof system Total Construction: 70,000 sq. ft.

FLATIRON STRUCTURES 1980- 1986 LONGMONT, CO

Assistant Superintendent Glenwood Canyon precast post-tension segmental bridges. The first 7 bridges from No Name exit, 8 miles to Grizzly Creek off ramp. Project valued at $ 870 M

Assistant Superintendent C-470/1-25 cloverleaf. Total of 4 bridges over I-25 in Denver.

Boulder Turnpike at 1-25 on and off ramps with extensive relocation of infra-structure and utilities.

Walnut Street Viaduct downtown Denver over I-25. I-90’s and box girder assemblies. Extensive false work.

Demo and erection of 3 new bridges in Roswell, New Mexico using I-90 girders. Award winning.

And many miles of I-70 improvements and civil work with expansion joints, abutments, retaining walls, box culverts, type 4 barricades, and erosion control.

AVERY STRUCTURES 1977-1980 BUENA VISTA, CO

Union Iron worker erecting heavy industrial water treatment plants and mining facilities through-out the state of Colorado.

EDUCATION

B.S. Natural Sciences / Construction Technology - Civil Engineering, Business Management

University of Northern Iowa Cedar Falls, Iowa

PROFESSIONAL DEVELOPMENT

General Contractors License Class A #1052201

LEEDS Training - Certificate of Completion

OSHA 40-Hour Training Certificate

Primavera Contract Manager and Expedition Trained

References:

Robert Koehler, Construction Manager SHAW GRP. 504-***-****

Tom Aldridge, Sr. Project Manager SHAW GRP. 225-***-****

Dan Hayes, Safety Manager SHAW GRP. 901-***-****

Mike McGee, Town of Vail Fire Marshall 970-***-****

Leonard Sandoval, Town of Vail Public Works 970-***-****

Bill Glenn, Owner Developer of MacArthur Glenn Factory Stores 703-***-****

John Guenther, Construction Manager 970-***-****

Dave Wermiscerchen, Swinerton Builders VP Operations 720-***-****

I can be reached at 970-***-****. My e-mail is *********@*******.***.

Physical address: 106 Blue grouse Lane Silverthorne CO 80498



Contact this candidate