Post Job Free
Sign in

Technician III Facilities

Location:
Frederick, MD
Salary:
34,000
Posted:
February 28, 2025

Contact this candidate

Resume:

VINCENT R. HAWKINS

**** ******* *****

Frederick, MD 21703

Home 301-***-****

Cell-301-***-****

SUMMARY:

Supervisory professional in the biotechnical field. Broad knowledge in manufacturing and production. Particular expertise in:

•Installation, Performance, and Operational Qualifications

•Fermentor Operating and Maintenance

•Writing SOP’s and Batch Records

•Validation

PROFESSIONAL EXPERIENCE:

MedImmune 1997 - 2022

Frederick, MD

Facilities Technician III

Began as Tech II in June of 03.

Promoted to Facilities Technician III in Dec of 04.

Received certificate for completion of Electrical Training Course.

Received temporary license as a Waterworks & Waste System Operator.

Obtained Second Grade Stationary Engineers License 2007.

Completed classes at FCC for welding.

Received Re-Certification certificate for First Aid and CPR 2008.

Plasma Production Senior Supervisor (1997 - 2003)

Supervisor of a specific process in the plasma production area (fractionation and purification). Supervises technicians to complete on schedule while ensuring use of approved batch records and compliance with cGMP.

Selected Accomplishments:

Assigned as “Point Person” of various pieces of equipment such as the CARR Centrifuge Separation System, the Matrix Automated Bottle Cutter, and the Cryogenic Plasma Separation System.

Responsible for development of training SOP’s (Standard Operating Procedures) for newly hired Plasma Personnel.

Developed temperature mapping studies with “Smart Gaskets” and thermocouples on the Carr Centrifuges and all associated transfer lines to maximize and maintain required process temperatures.

Responsible for coordination and implementation of development runs on new equipment in this area of the process. Developed and conducted various run test to evaluate the effectiveness of the aforementioned equipment as it relates to the Fractionation Process.

Assigned as “Development Coordinator” responsible for development and implementation of equipment upgrades and or modifications as a result of developmental process run-throughs.

Assisted with development of cost analysis breakdowns for equipment and or faculty up-grades.

Responsible for contact acting and coordinating Contractor activities as it relates to equipment and or faculty up-grades.

Assisted with the development and personnel training of CIP (Clean In Place) protocol on the aforementioned equipment.

Assisted with the development and implementation of collaborative projects with companies with similar equipment and processes.

Initiated and assisted with the development of an annual PM (Preventative Maintenance) program for process equipment.

Responsible for the designing and implementation of equipment modifications to enhance equipment performance and or cleanabilty.

CEPHALON, INC. 1992-1996

Beltsville, MD

Senior Operator/Senior Technical Analyst/Shift Supervisor

Provide technical support for Fermentation Purification process and fill and finish operation. Developed installation qualifications, operational qualifications, and performance qualifications. Assisted in re-modification of various systems on the fermentors (150 liter, 1500 liter) which increased out-put and stability of utilities.

Selected Accomplishments:

Assisted with temperature mapping validation protocols on all production tanks, centrifuges, autoclaves, and decontamination tanks. Assisted with placement and removal of BI’s and AI’s along with reading and processing of “ KAYE” Printouts.

I also assisted Validation Personnel with the development of a Temperature Mapping Tree’s for placement of BI’s.

Increased chilled water output by removal of automatic temperature control micro-switches and removal of unnecessary piping which resulted in more efficient temperature control.

Installed a manual valve control system which enabled the operator to override and control valves in the event of power failure or specific valve failures.

• Assisted in the development of a CIP (Clean in Place) system for various pieces of equipment, which

resulted in cleaning validation for all production and purification equipment.

• Conducted operational qualifications and performance qualifications.

• Wrote installation qualifications, which resulted in modification of fermentors and purification equipment.

• .

CHEM-GEN 1989-1992

Gaithersburg, MD

Research Development Assistant/ Shift Supervisor

Responsible for monitoring, harvesting and processing biological fermentations. Interviewed, hired and trained new hires.

Selected Accomplishments:

• Assisted with the design and installation of a piped inoculation system for two 250 liter fermentors in a 1500 liter and 3500 liter fermentor which resulted in safer and sterile transfer during inoculation.

• Assisted with the development and implementation of a cleaning process for ultra filtration filter systems which resulted in higher product yields and longer filter life.

• Trained new hires on safety and procedures, which resulted in fewer injuries and increased product output.

WASHINGTON SUBURBAN SANITARY COMMISSION 1986-1989

Gaithersburg, MD

Construction Inspector (1987 – 1989)

Supervised construction crews under contract during installation of underground water and sewer pipes. Relayed and enforced county and state construction specifications in addition to EPA and OSHA safety regulations

Selected Accomplishments:

• Organized pre-construction meetings to discuss site safety.

• Liaison with onsite contractors. Handled discrepancies.

• Issued shut-down notifications to any contractor who were in violation of any site-safety regulations EPA and OSHA safety regulations.

Waste Water Plant Operator (1986 - 1987)

Maintained required and biological oxygen demand levels in raw sewage tanks. Serviced and maintained activated charcoal gravity filters. Monitored pH and chlorine levels of final effluent.

Selected Accomplishments:

• Initiated and implemented a preventative maintenance program for the raw sludge pumps, lime addition pumps and lines and the gravity filters.

• Rebuilt sludge pumps and cleaned gravity filters.

• Cleaned and or rebuilt lime pumps and flushed lime transfer lines.

GENEX CORPORATION 1984-1985

Gaithersburg, MD.

Pilot Plant Operator

Responsible for monitoring, harvesting, and processing biological fermentations. Monitored utilities.

Selected Accomplishments:

• Conducted analysis of an average of 30 samples per hour.

• Re-modified equipment in the production of an enzyme and caustic bead form of drain cleaner. This resulted in a 300% increase of enzyme beads and a 100% increase in caustic soda beads.

Wendy’s Fast Food Restaurant 1981-1984

Cumberland, Md.

Assistant Manager

Responsible for crew management. Duties included ordering store supplies such as food stuffs, and cleaning supplies.

Also responsible for scheduling crew personnel and work schedules.

Responsible for money management and banking responsibilities.

Also responsible for customer relations and parking lot maintenance.

Assisted with management and training in other Wendy’s resultants throughout other areas such as West Virginia, Virginia Beach, Laurel Maryland, and the neighboring Wendy’s in Cumberland, Maryland.

Longstretch Youth Homes 1979-1983

Garrett County, Md.

House Parent, Athletic Director, Campus Maintenance Director, Campus House Chef

Responsible for overall for overseeing clients in what ever area and or house I would be station for that shift.

Initiated a physical training schedule and activity schedule or all houses and clients on campus

Set up a overall maintenance program to repair and improve living conditions on all houses and buildings on campus.

I worked part time while completing my degree. I began working full time after graduating from Frostburg St. University. I continued to work part time at Longstretch Youth Homes while employed at Wendy’s Fast Foods.

EDUCATION:

Bachelor of Science in Sociology/Criminology, Minor in Political Science

Frostburg State College, Frostburg, MD, 1980

TECHNICAL SKILLS:

1500, 250 and 14 liter fermentation vessel; centrifugation systems large and small scale Westfalia separation equipment. Alfa-Laval Centrifugation system; evaporation and drying equipment glucose level analyzer, spectrophotometer systems, purification systems, ultrafiltration and microfictration system

TRAINING:

SCBA self contained breath apparatus

Certified CPR and First Aid Treatment,

Certified in Confined Space Training

PERSONAL:

Participate in basketball and softball.

Active in children’s education both academically and spiritually.

Participate in neighbor and church activities.

AWARDS/ACCOMPLISHMENTS:

Received Employee of the Month at Cephalon in 93

3 time recipient of The Director’s Award at MedImmune in 1997,2000, and again in 2002..First in the history of the FMC to receive this award.

Promoted to Senior Supervisor of the Plasma Department in 2002.

Developed and assisted with the implementation of a “Dual Filter” breathing apparatus on the Process Centrifuge Equipment to enable it to operate more efficiently.

Performed the Decommissioning of the Shut Down Plasma Area which consisted of cleaning and or decontaminating all process equipment and or tools utilized in the Fractionation Process which saved the company an excess of $150,000.00

Relocated to Bensalem PA. for 3 +months to assist with the H1N1 Virus production.