Nur Fajar A. Lead / Senior Electrical Engineer Nov’ 2020
NUR FAJAR A.
Lead / Senior Electrical Engineer
Contact
Jl. P. Siberut Raya – Bekasi, West Java,
Indonesia, 17111
Summary
More than 21 years’ proven experienced with Design Accuracy, Optimum Execution and Safety for accomplished Engineering Design; Conceptual Study (Pre-FEED), FEED and Detail Engineering (DED) for Gas Processing Facility, Oil Processing Facility and Power Plant Project in Indonesia and Overseas. As Lead Electrical, I have been the Principe responsibilities for the design shall be with high accuracy following owner requirement, optimum execution during design and safety design
Education
Bachelor of Electrical Engineering, of
Jayabaya University, Jakarta
Software Skills
ETAP
Microsoft Office
Dialux (for Lighting)
Work Experience
Professional Experience
Responsibility for following activities during working are:
Prepare Manpower Planning, Man-hours Planning & Schedule, Project Setup for Detail Engineering, Review ITB contract (Project scope study), Specification, Procedure, Prepare technical queries
(TQ / RFQ) to client & etc.
Coordination & Technical consulting with internal team & all discipline, Clarification & Technical consulting with client & Vendor to resolving material issue and Technical issue.
Experience in engineering design prepare Electrical Design Basis, Electrical Load List, and some of Electrical Specification, Electrical Data sheet and Electrical Calculation Commissioning and Start-up.
Check & Review Single Line Diagram, Equipment Layout, Key plan, Electrical Layout, Hazardous area, Lighting Layout, Schematic Diagram, Wiring Diagram and Electrical Cable Schedule.
Check & Review Electrical MTO, MR, RFQ, TBE and
Document/Drawing vendor review.
Proficient in Electrical International Standard such as ANSI, API, NEMA, NFPA, NEC, NFPA70, IEEE, ICEA, IEC, BS, and ISO.
Proficient in ETAP, SKM PTW or equivalent application.
Computer Literacy.
10
11
1
Lead Engineer
Engineer
Designer
Years of Experience
Years of Experience
Nur Fajar A. Lead / Senior Electrical Engineer Nov’ 2020 Personal Details
DOB: 26th June 1976
Language(s): Bahasa Indonesia &
English
Professional Training
Internal course in Amec Berca – ETAP.
Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 Project List
Employer
Name
Project Title Project Detail Project Phase Client Role Start End Months Timas Suplindo
Floating Production
Unit (FPU) for MDA-
MBH Field
Development
Detailed Engineering
Design (DED) – Topside
Include
Operation &
Maintenance
Husky CNOOC Madura Ltd.
(HCML) plans to develop of
Madura Strait Block MDA,
MBH & MDK gas reserves for
sales gas to buyers in Java
Island through the existing 28”
East Java Gas Pipeline (EJGP).
The field is located offshore in
the Madura Strait East Java,
about 180 km west of the
existing Pagerungan,
approximately 200 km east of
Surabaya and about 75 km
southeast of Madura Island.
Medco E&P
Lead
Electrical
Engineer
Agustus
2024
Present -
Timas Suplindo
Terubuk WHP L &
WHP M
Terubuk is an offshore oil & gas
field, an undeveloped prospect
in Block B of the South Natuna
Sea, located 45 km northeast
of Belida DPPA and 32 km
northwest of HangTuah
MoGPU.
The fields have 275 feet water
depth in average. Medco E&P
Natuna, Ltd. (MEPN) is South
Natuna Sea Block B PSC
operator, holds 40%
partnership working interest.
The partners are
PT. Medco Daya Sentosa
(MDS) with 35% working
interest and Prime Natuna Inc.
with 25%
EPCI Medco E&P
Lead
Electrical
Engineer
Agustus
2024
Present -
Operation &
Maintenance
Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 particating interest.
Tri Panji Puring
FEED Engineering
For PCK 8C
Compression Project
Peciko is a gas and condensate
field located offshore in the
Mahakam delta in Indonesia.
The field lies offshore in water
depths of 30 - 50 meters, about
25 kilometers south east of the
Senipah terminal. The field lies
in the Mahakam PSC, operated
by PT Pertamina Hulu
Mahakam. All Peciko
production is sent via multi-
phase trunk-lines to the
onshore processing plant at
Senipah where gas and liquids
are separated and treated.
Gas Plant, EPCI
Pertamina
Hulu
Mahakam
Lead / Senior
Electrical
Engineer
Agustus
2022
September
2024 24
Meindo Elang
Indah
South Sembakung Gas
Plant Simenggaris
Kalimantan Timur
COMPANY has initiated the
new Project to accommodate
produced gas from the new
wells. The project will consist
installation of; new wellsite
facilities and its flowlines, new
LP production manifold and
new LP Production Separator,
new condensate handling
system, new (future)
compressor package during
wells pressure depletion, and
other repair and modifications
required.
Gas Plant, EPCI
JOB
Pertamina -
Medco E&P
Simenggaris
Lead
Electrical
Engineer
Jun 2021 July 2022 12
Meindo Elang
Indah
JAWA-1 Combined
Cycle Gas Turbine
Power Plant
(1760MW)
The FSRT facility will provide a
reliable/alternative source of
gas supply to fulfil gas
requirement for Power Plants
called IPP (Independent Power
Producer) OWNER with 1760
MW capacity. Facilities is
Power Plant, EPCI
Pertamina,
Marubeni,
Sojitz
Lead
Electrical
Engineer
Aug’ 2019 Jun 2021 24
Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 planned to be able for re-
gasifying LNG and delivering
gas with maximum peak rating
of 300MMscfd and expandable
up to 400MMscfd.
Meindo Elang
Indah
MDK Field
Development
The MDK platform is located
approximately 100 m away
from the 20” subsea pipeline
from MDA to MBH which the
tie-in point is approximately
10.5 km from MDA platform as
shown in the sketch below. The
wet gas production from MDK
will be tied-in to the 20” pipeline
and the gas from all the fields
will be treated on FPU that
located adjacent to MBH
platform before exported to
Java Island through the
existing 28” EJGP. The length
of wet gas pipeline from MDA to
MBH is approximately 28.1 km.
Oil & Gas, EPCI
Husky-
CNOOC
Madura
Limited
(HCML)
Lead
Electrical
Engineer
Oct’2020 Post pond -
Berca
Engineering
International
(before is
Amec Berca)
Anoa Platform & AGX
Platform Future
Compression
Conceptual Study
As the wells flowing wellhead
pressures decline and reservoir
depletion continues, production
from the Natuna Sea Blok A
Field continues to decrease. To
anticipate this situation and
increase ultimate recovery from
reservoirs, the arrivals
pressure at the AGX and
GBCPP platforms are required
to be reduces. In Anoa hub,
Company plans to reduce
arrival pressure from 300 psig
to 90 psig by installing a new
Non Associated Gas (“NAG”)
Compression systemon either
the Anoa Platform or AGX
Platform. Overall the project
will add approximately 43.6
BCF in gross reserves.
Oil & Gas,
Engineering
Service
Premier Oil
Natuna Sea
B.V.
Lead
Electrical
Engineer
April 2019 July 2019 4
Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 Berca
Engineering
International
(CPY name
before is Amec
Berca)
Compressor
Installation Singa Gas
Plant Lematang
Company plan to continue
developing Lematang Block by
Constructing Gas Compression
Facility at Singa Central
Processing Plant (CPP) to
process raw gas 45 MMSCFD
from operating pressure
300/340 psig to 900/1000 psig
using Solar Gas Turbine
Compressor.
Oil & Gas,
Engineering
Service
Medco E&P
Lematang
Lead
Electrical
Engineer
Oct’ 2019 April 2019 7
Berca
Engineering
International
(CPY name
before is Amec
Berca)
Call Out Engineering
and Project
Management Services
Santos has offshore and
onshore field in East Java
operation area and Natuna
area and intends to optimize,
maintain and enhance its
current production facilities and
to develop future new
production facilities. BEI is
commissioned to provide and
perform engineering
management, design, studies,
drafting, reproduction, set up
and provide expertise of project
management, engineering and
cost estimation, construction
management and other
services to execute and
support various project in a
form of blanket engineering
contract.
Oil & Gas,
Engineering
Service
Santos
(Madura
Offshore)
Lead
Electrical
Engineer
July 2018 Nov’2018 5
Berca
Engineering
International
(CPY name
before is Amec
Berca)
Condensate
Evacuation / Handling
Facility
Petronas intends to develop
Bukit Tua ORF, onshore
receiving facility located at
Gresik that received gas from
Bukit Tua field via 12” 110 km
export pipeline. The existing
facility is currently not designed
to evacuate the condensate
product, which is produced
around 150 barrel per day with
Oil & Gas,
Engineering
Service
Petronas -
PC Ketapang
II Ltd
Lead
Electrical
Engineer
Dec’ 2017 March 2018 4
Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 gas sales rate of 23 MMSCFD.
The condensate product shall
be evacuated in order to avoid
continuous burning and
potential disruption of
production. The condensate
shall be sent to the Condensate
Storage Vessel prior to be
loaded into truck, which will be
provided by Buyer. BEI is
commissioned to provide
detailed engineering and
design for the condensate
evacuation facility.
Berca
Engineering
International
(CPY name
before is Amec
Berca)
LNG Expansion
Project
Assist ABB Singapore Oil & Gas,
Engineering
Service
BP Tangguh
Lead
Electrical
Engineer
Sep 2017 March 2018 7
Berca
Engineering
International
(CPY name
before is Amec
Berca)
Ario Damar - Sriwijaya
Oil & Gas
Development
The Pandan Block is located
onshore in the Musi Rawas,
South Sumatra region of
Indonesia. The field was
estimated to produce around
2,000 bopd, while the gas
production is estimated to
reach 20 MMscfd. The
production fluids from oil and
gas wells will sent to a surface
production facility at Pandan
Block Station where the fluids
shall be separated, stored and
shipped through pipeline to
PEP Musi for sales gas or by
trucking (for crude oil) to
unloading facility at Jene
Station. The wellhead area
consists of 11 single oil wells
Oil & Gas,
Engineering
Service
Tropik Energi
Pandan
Lead
Electrical
Engineer
Nov 2016 April 2018 19
Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 and 9 single gas completion
wells. The fluid from the wells
will be sent to Tropik Pandan
Block Station via individual
buried flowlines. The gas
processing unit at Tropik
Pandan Block Station consists
of Reception System, Dew
Point Control System and
Future Booster Compressor
System. The gas is separated
from oil and water in Gas
Production Separator and then
sent to Dew Point Control
System. It is cooled in Gas/Gas
Heat Exchanger and Gas Chiller
and then separated in Low
Temperature Separator. The
sales gas is then exported to
SPG Musi Barat through a 22
km - 8” gas pipeline.
Berca
Engineering
International
(CPY name
before is Amec
Berca)
Bison, Iguana and
Gajah Puteri
Development Project
Premier Oil intends to develop
Bison, Iguana, and Gajah
Puteri fields subsea wellhead.
The Bison, Iguana and Gajah
Puteri are subsea wells that will
be connected directly back to
the existing Pelikan WHP and
AGX Platform via a subsea
production pipeline. The
production fluids from these
subsea wells will be
commingled with existing
production on the platforms for
onward exported via the West
Natuna Transportation System
(WNTS). The subsea wellhead
of Bison will be directly tied-
back to Pelikan WP (10km),
while Iguana will be tied-back
Oil & Gas, FEED
Study
Premier Oil
Natuna Sea
B.V.
Lead
Electrical
Engineer
Jan’ 2015 Oct’ 2015 10
Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 to Pelikan WP via and
commingled with the Bison flow
(6km to Bison). The Pelikan
WP has been designed for
future (subsea) tie-back and
have pre-installed J-tubes and
risers. The project requires
installing new subsea wells,
subsea pipelines & umbilical
and the modification of the
existing topside infrastructure
to receive, control, and
measures the Bison and
Iguana production. BEI is
engage to provide FEED study
of the field development
project.
Berca
Engineering
International
(CPY name
before is Amec
Berca)
Geenfield for MFP IS-
Q08B, MFP IS-Q28B,
MFP IS-Q29B &
Brownfield for Subsea
Pipeline PlatformMFP
IS-S09
Build 4 MFPs (Minimum
Facility Platform) with very
aggressive schedule (fast track
engineering). A MFP located in
South Dome is ARAB C
reservoir (sour service) having
5 wells; 2 water injection wells
and 3 ESP (electric submersible
pump) driven production
wells. Other 3 MFPs is located
at North Dome are Shuaiba
reservoir having 5 wells each; 2
water injection wells and 3
production wells assisted with
gas lift. All the 5 slots (wells) is
designed for conversion from
production to water injection
duty and vice versa, with the
minimum change out of
process pipe work and
instrumentation. MFP is design
for 12000 BOPD with GOR 800
scf/bbl and water cut 10%.
Oil & Gas,
Engineering
Service
Occidental
Petroleum of
Qatar Ltd
Lead
Electrical
Engineer
April 2014 Oct 2014 7
Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 Berca
Engineering
International
(CPY name
before is Amec
Berca)
Chevron Field
Modifications
Assist Rekind-Worley Parsons
Oil & Gas,
Engineering
Service
Chevron
Pacific
Indonesia
Sr. Electrical
Engineer
Sep’ 2013 March 2014 7
Berca
Engineering
International
(CPY name
before is Amec
Berca)
Eastern Hub Mercury
Removal
The purpose of the Eastern
Hub Mercury Removal - Water
(EHMR - Water) project is to
design, construct, install, and
commission a water handling
system to minimize the
discharge of mercury into the
environment from the
produced water stream.
Company has selected
Reinjection as the preferred
design.
By installing new water
reinjection facilities the study
for electrical power supply for
new equipment in this project
will be required. Existing
electrical facilities in Belanak
FPSO shall be modified and
upgrade based on this study to
anticipate the requirement of
the new facilities and this
document is prepared in line
with the project requirement.
Oil & Gas,
Engineering
Service
Connoco
Phillips
Indonesia Inc.
Ltd.
Sr. Electrical
Engineer
Sep’ 2012 Feb’ 2013 6
Berca
Engineering
International
(CPY name
South Yoloten Gas
Field Development
Substation Facilities
Oil & Gas,
Engineering
Service
TurkmenGas
Sr. Electrical
Engineer Sep’ 2011 Aug’ 2012 12
Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 before is Amec
Berca)
Euroasiatic Industrial Facilities Power Plant Power Plant, EPCI Industrial Sr. Electrical Engineer
March
2010
Aug’ 2011 18
Istana Karang
Laut (now
became
Entrepose)
Kungrad Gas
Dehidration Unit
Process Facilities Oil & Gas, EPCI Ultransgaz
Sr. Electrical
Engineer
May 2007 Feb’ 2010 34
Istana Karang
Laut (now
became
Entrepose)
Bojonegara Station Substation Facilities Oil & Gas, EPCI Perusahaan
Gas Negara
Sr. Electrical
Engineer Sep’ 2007 Sep 2010 36
Istana Karang
Laut (now
became
Entrepose)
New Sales Gas
Project
Process Facilities Oil & Gas, EPCI
British
Petroleum
(BP)
Sr. Electrical
Engineer
July 2007 May 2008 10
Sempec
Indonesia
Batara Complex
Development Project
Phase III
Process Facilities Oil & Gas, EPCI Petro China
Electrical
Engineer April 2004 Dec’ 2005 20
Indokomas
Buana Perkasa
(Cegelec)
Tunu Phase Phase 8 Green Field Platform Oil & Gas, EPCI Total Finaelf Designer /
Electrical
Engineer
Sep’ 2001 May 2004 33