Post Job Free
Sign in

Electrical Engineer Senior

Location:
Jakarta, Indonesia
Salary:
negotiable
Posted:
February 24, 2025

Contact this candidate

Resume:

Nur Fajar A. Lead / Senior Electrical Engineer Nov’ 2020

NUR FAJAR A.

Lead / Senior Electrical Engineer

Contact

Jl. P. Siberut Raya – Bekasi, West Java,

Indonesia, 17111

+62-878********

Summary

More than 21 years’ proven experienced with Design Accuracy, Optimum Execution and Safety for accomplished Engineering Design; Conceptual Study (Pre-FEED), FEED and Detail Engineering (DED) for Gas Processing Facility, Oil Processing Facility and Power Plant Project in Indonesia and Overseas. As Lead Electrical, I have been the Principe responsibilities for the design shall be with high accuracy following owner requirement, optimum execution during design and safety design

Education

Bachelor of Electrical Engineering, of

Jayabaya University, Jakarta

Software Skills

ETAP

Microsoft Office

Dialux (for Lighting)

Work Experience

Professional Experience

Responsibility for following activities during working are:

Prepare Manpower Planning, Man-hours Planning & Schedule, Project Setup for Detail Engineering, Review ITB contract (Project scope study), Specification, Procedure, Prepare technical queries

(TQ / RFQ) to client & etc.

Coordination & Technical consulting with internal team & all discipline, Clarification & Technical consulting with client & Vendor to resolving material issue and Technical issue.

Experience in engineering design prepare Electrical Design Basis, Electrical Load List, and some of Electrical Specification, Electrical Data sheet and Electrical Calculation Commissioning and Start-up.

Check & Review Single Line Diagram, Equipment Layout, Key plan, Electrical Layout, Hazardous area, Lighting Layout, Schematic Diagram, Wiring Diagram and Electrical Cable Schedule.

Check & Review Electrical MTO, MR, RFQ, TBE and

Document/Drawing vendor review.

Proficient in Electrical International Standard such as ANSI, API, NEMA, NFPA, NEC, NFPA70, IEEE, ICEA, IEC, BS, and ISO.

Proficient in ETAP, SKM PTW or equivalent application.

Computer Literacy.

10

11

1

Lead Engineer

Engineer

Designer

Years of Experience

Years of Experience

Nur Fajar A. Lead / Senior Electrical Engineer Nov’ 2020 Personal Details

DOB: 26th June 1976

Language(s): Bahasa Indonesia &

English

Professional Training

Internal course in Amec Berca – ETAP.

Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 Project List

Employer

Name

Project Title Project Detail Project Phase Client Role Start End Months Timas Suplindo

Floating Production

Unit (FPU) for MDA-

MBH Field

Development

Detailed Engineering

Design (DED) – Topside

Include

Operation &

Maintenance

Husky CNOOC Madura Ltd.

(HCML) plans to develop of

Madura Strait Block MDA,

MBH & MDK gas reserves for

sales gas to buyers in Java

Island through the existing 28”

East Java Gas Pipeline (EJGP).

The field is located offshore in

the Madura Strait East Java,

about 180 km west of the

existing Pagerungan,

approximately 200 km east of

Surabaya and about 75 km

southeast of Madura Island.

Medco E&P

Lead

Electrical

Engineer

Agustus

2024

Present -

Timas Suplindo

Terubuk WHP L &

WHP M

Terubuk is an offshore oil & gas

field, an undeveloped prospect

in Block B of the South Natuna

Sea, located 45 km northeast

of Belida DPPA and 32 km

northwest of HangTuah

MoGPU.

The fields have 275 feet water

depth in average. Medco E&P

Natuna, Ltd. (MEPN) is South

Natuna Sea Block B PSC

operator, holds 40%

partnership working interest.

The partners are

PT. Medco Daya Sentosa

(MDS) with 35% working

interest and Prime Natuna Inc.

with 25%

EPCI Medco E&P

Lead

Electrical

Engineer

Agustus

2024

Present -

Operation &

Maintenance

Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 particating interest.

Tri Panji Puring

FEED Engineering

For PCK 8C

Compression Project

Peciko is a gas and condensate

field located offshore in the

Mahakam delta in Indonesia.

The field lies offshore in water

depths of 30 - 50 meters, about

25 kilometers south east of the

Senipah terminal. The field lies

in the Mahakam PSC, operated

by PT Pertamina Hulu

Mahakam. All Peciko

production is sent via multi-

phase trunk-lines to the

onshore processing plant at

Senipah where gas and liquids

are separated and treated.

Gas Plant, EPCI

Pertamina

Hulu

Mahakam

Lead / Senior

Electrical

Engineer

Agustus

2022

September

2024 24

Meindo Elang

Indah

South Sembakung Gas

Plant Simenggaris

Kalimantan Timur

COMPANY has initiated the

new Project to accommodate

produced gas from the new

wells. The project will consist

installation of; new wellsite

facilities and its flowlines, new

LP production manifold and

new LP Production Separator,

new condensate handling

system, new (future)

compressor package during

wells pressure depletion, and

other repair and modifications

required.

Gas Plant, EPCI

JOB

Pertamina -

Medco E&P

Simenggaris

Lead

Electrical

Engineer

Jun 2021 July 2022 12

Meindo Elang

Indah

JAWA-1 Combined

Cycle Gas Turbine

Power Plant

(1760MW)

The FSRT facility will provide a

reliable/alternative source of

gas supply to fulfil gas

requirement for Power Plants

called IPP (Independent Power

Producer) OWNER with 1760

MW capacity. Facilities is

Power Plant, EPCI

Pertamina,

Marubeni,

Sojitz

Lead

Electrical

Engineer

Aug’ 2019 Jun 2021 24

Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 planned to be able for re-

gasifying LNG and delivering

gas with maximum peak rating

of 300MMscfd and expandable

up to 400MMscfd.

Meindo Elang

Indah

MDK Field

Development

The MDK platform is located

approximately 100 m away

from the 20” subsea pipeline

from MDA to MBH which the

tie-in point is approximately

10.5 km from MDA platform as

shown in the sketch below. The

wet gas production from MDK

will be tied-in to the 20” pipeline

and the gas from all the fields

will be treated on FPU that

located adjacent to MBH

platform before exported to

Java Island through the

existing 28” EJGP. The length

of wet gas pipeline from MDA to

MBH is approximately 28.1 km.

Oil & Gas, EPCI

Husky-

CNOOC

Madura

Limited

(HCML)

Lead

Electrical

Engineer

Oct’2020 Post pond -

Berca

Engineering

International

(before is

Amec Berca)

Anoa Platform & AGX

Platform Future

Compression

Conceptual Study

As the wells flowing wellhead

pressures decline and reservoir

depletion continues, production

from the Natuna Sea Blok A

Field continues to decrease. To

anticipate this situation and

increase ultimate recovery from

reservoirs, the arrivals

pressure at the AGX and

GBCPP platforms are required

to be reduces. In Anoa hub,

Company plans to reduce

arrival pressure from 300 psig

to 90 psig by installing a new

Non Associated Gas (“NAG”)

Compression systemon either

the Anoa Platform or AGX

Platform. Overall the project

will add approximately 43.6

BCF in gross reserves.

Oil & Gas,

Engineering

Service

Premier Oil

Natuna Sea

B.V.

Lead

Electrical

Engineer

April 2019 July 2019 4

Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 Berca

Engineering

International

(CPY name

before is Amec

Berca)

Compressor

Installation Singa Gas

Plant Lematang

Company plan to continue

developing Lematang Block by

Constructing Gas Compression

Facility at Singa Central

Processing Plant (CPP) to

process raw gas 45 MMSCFD

from operating pressure

300/340 psig to 900/1000 psig

using Solar Gas Turbine

Compressor.

Oil & Gas,

Engineering

Service

Medco E&P

Lematang

Lead

Electrical

Engineer

Oct’ 2019 April 2019 7

Berca

Engineering

International

(CPY name

before is Amec

Berca)

Call Out Engineering

and Project

Management Services

Santos has offshore and

onshore field in East Java

operation area and Natuna

area and intends to optimize,

maintain and enhance its

current production facilities and

to develop future new

production facilities. BEI is

commissioned to provide and

perform engineering

management, design, studies,

drafting, reproduction, set up

and provide expertise of project

management, engineering and

cost estimation, construction

management and other

services to execute and

support various project in a

form of blanket engineering

contract.

Oil & Gas,

Engineering

Service

Santos

(Madura

Offshore)

Lead

Electrical

Engineer

July 2018 Nov’2018 5

Berca

Engineering

International

(CPY name

before is Amec

Berca)

Condensate

Evacuation / Handling

Facility

Petronas intends to develop

Bukit Tua ORF, onshore

receiving facility located at

Gresik that received gas from

Bukit Tua field via 12” 110 km

export pipeline. The existing

facility is currently not designed

to evacuate the condensate

product, which is produced

around 150 barrel per day with

Oil & Gas,

Engineering

Service

Petronas -

PC Ketapang

II Ltd

Lead

Electrical

Engineer

Dec’ 2017 March 2018 4

Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 gas sales rate of 23 MMSCFD.

The condensate product shall

be evacuated in order to avoid

continuous burning and

potential disruption of

production. The condensate

shall be sent to the Condensate

Storage Vessel prior to be

loaded into truck, which will be

provided by Buyer. BEI is

commissioned to provide

detailed engineering and

design for the condensate

evacuation facility.

Berca

Engineering

International

(CPY name

before is Amec

Berca)

LNG Expansion

Project

Assist ABB Singapore Oil & Gas,

Engineering

Service

BP Tangguh

Lead

Electrical

Engineer

Sep 2017 March 2018 7

Berca

Engineering

International

(CPY name

before is Amec

Berca)

Ario Damar - Sriwijaya

Oil & Gas

Development

The Pandan Block is located

onshore in the Musi Rawas,

South Sumatra region of

Indonesia. The field was

estimated to produce around

2,000 bopd, while the gas

production is estimated to

reach 20 MMscfd. The

production fluids from oil and

gas wells will sent to a surface

production facility at Pandan

Block Station where the fluids

shall be separated, stored and

shipped through pipeline to

PEP Musi for sales gas or by

trucking (for crude oil) to

unloading facility at Jene

Station. The wellhead area

consists of 11 single oil wells

Oil & Gas,

Engineering

Service

Tropik Energi

Pandan

Lead

Electrical

Engineer

Nov 2016 April 2018 19

Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 and 9 single gas completion

wells. The fluid from the wells

will be sent to Tropik Pandan

Block Station via individual

buried flowlines. The gas

processing unit at Tropik

Pandan Block Station consists

of Reception System, Dew

Point Control System and

Future Booster Compressor

System. The gas is separated

from oil and water in Gas

Production Separator and then

sent to Dew Point Control

System. It is cooled in Gas/Gas

Heat Exchanger and Gas Chiller

and then separated in Low

Temperature Separator. The

sales gas is then exported to

SPG Musi Barat through a 22

km - 8” gas pipeline.

Berca

Engineering

International

(CPY name

before is Amec

Berca)

Bison, Iguana and

Gajah Puteri

Development Project

Premier Oil intends to develop

Bison, Iguana, and Gajah

Puteri fields subsea wellhead.

The Bison, Iguana and Gajah

Puteri are subsea wells that will

be connected directly back to

the existing Pelikan WHP and

AGX Platform via a subsea

production pipeline. The

production fluids from these

subsea wells will be

commingled with existing

production on the platforms for

onward exported via the West

Natuna Transportation System

(WNTS). The subsea wellhead

of Bison will be directly tied-

back to Pelikan WP (10km),

while Iguana will be tied-back

Oil & Gas, FEED

Study

Premier Oil

Natuna Sea

B.V.

Lead

Electrical

Engineer

Jan’ 2015 Oct’ 2015 10

Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 to Pelikan WP via and

commingled with the Bison flow

(6km to Bison). The Pelikan

WP has been designed for

future (subsea) tie-back and

have pre-installed J-tubes and

risers. The project requires

installing new subsea wells,

subsea pipelines & umbilical

and the modification of the

existing topside infrastructure

to receive, control, and

measures the Bison and

Iguana production. BEI is

engage to provide FEED study

of the field development

project.

Berca

Engineering

International

(CPY name

before is Amec

Berca)

Geenfield for MFP IS-

Q08B, MFP IS-Q28B,

MFP IS-Q29B &

Brownfield for Subsea

Pipeline PlatformMFP

IS-S09

Build 4 MFPs (Minimum

Facility Platform) with very

aggressive schedule (fast track

engineering). A MFP located in

South Dome is ARAB C

reservoir (sour service) having

5 wells; 2 water injection wells

and 3 ESP (electric submersible

pump) driven production

wells. Other 3 MFPs is located

at North Dome are Shuaiba

reservoir having 5 wells each; 2

water injection wells and 3

production wells assisted with

gas lift. All the 5 slots (wells) is

designed for conversion from

production to water injection

duty and vice versa, with the

minimum change out of

process pipe work and

instrumentation. MFP is design

for 12000 BOPD with GOR 800

scf/bbl and water cut 10%.

Oil & Gas,

Engineering

Service

Occidental

Petroleum of

Qatar Ltd

Lead

Electrical

Engineer

April 2014 Oct 2014 7

Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 Berca

Engineering

International

(CPY name

before is Amec

Berca)

Chevron Field

Modifications

Assist Rekind-Worley Parsons

Oil & Gas,

Engineering

Service

Chevron

Pacific

Indonesia

Sr. Electrical

Engineer

Sep’ 2013 March 2014 7

Berca

Engineering

International

(CPY name

before is Amec

Berca)

Eastern Hub Mercury

Removal

The purpose of the Eastern

Hub Mercury Removal - Water

(EHMR - Water) project is to

design, construct, install, and

commission a water handling

system to minimize the

discharge of mercury into the

environment from the

produced water stream.

Company has selected

Reinjection as the preferred

design.

By installing new water

reinjection facilities the study

for electrical power supply for

new equipment in this project

will be required. Existing

electrical facilities in Belanak

FPSO shall be modified and

upgrade based on this study to

anticipate the requirement of

the new facilities and this

document is prepared in line

with the project requirement.

Oil & Gas,

Engineering

Service

Connoco

Phillips

Indonesia Inc.

Ltd.

Sr. Electrical

Engineer

Sep’ 2012 Feb’ 2013 6

Berca

Engineering

International

(CPY name

South Yoloten Gas

Field Development

Substation Facilities

Oil & Gas,

Engineering

Service

TurkmenGas

Sr. Electrical

Engineer Sep’ 2011 Aug’ 2012 12

Nur Fajar A. Lead / Senior Electrical Engineer Sept’ 2024 before is Amec

Berca)

Euroasiatic Industrial Facilities Power Plant Power Plant, EPCI Industrial Sr. Electrical Engineer

March

2010

Aug’ 2011 18

Istana Karang

Laut (now

became

Entrepose)

Kungrad Gas

Dehidration Unit

Process Facilities Oil & Gas, EPCI Ultransgaz

Sr. Electrical

Engineer

May 2007 Feb’ 2010 34

Istana Karang

Laut (now

became

Entrepose)

Bojonegara Station Substation Facilities Oil & Gas, EPCI Perusahaan

Gas Negara

Sr. Electrical

Engineer Sep’ 2007 Sep 2010 36

Istana Karang

Laut (now

became

Entrepose)

New Sales Gas

Project

Process Facilities Oil & Gas, EPCI

British

Petroleum

(BP)

Sr. Electrical

Engineer

July 2007 May 2008 10

Sempec

Indonesia

Batara Complex

Development Project

Phase III

Process Facilities Oil & Gas, EPCI Petro China

Electrical

Engineer April 2004 Dec’ 2005 20

Indokomas

Buana Perkasa

(Cegelec)

Tunu Phase Phase 8 Green Field Platform Oil & Gas, EPCI Total Finaelf Designer /

Electrical

Engineer

Sep’ 2001 May 2004 33



Contact this candidate