ZAHEER ABBASS
Saudi Arabia Jubail
Mobile Number: 059*******
Email@: **********************@*****.***
Post Applied for : RIGGING & CRANE SECTION (SME)
Skills & Proficiency
Estimation & Bidding.
Visiting the critical work sites.
Lifting study & Method statement.
Making Lifting plan with accuracy.
Execution of the whole job complying with all the safety measures until the completion. Extra Activity: Mechanical Activities/Site Supervisor/Bundle Puller Operator Assembling & De-assembling Crawler Cranes up to 1800 tons & Luffer Boom assembling & De- assembling in Truck Mounted and Mobile Cranes up to 1200 tons PROFESSIONAL OBJECTIVE:
Energetic, productive and highly skilled Rigging Incharge (level 1) professional seeking career advancement within dynamic, high growth organization that welcomes fresh ideas, initiative, dedication and experience. Proven leadership, technical, communication skills.To work in a challenging environment witch would utilize my skills to the maximum and I can contribute to the vision of the company. I want to be an asset for the company witch gives me ample opportunities for growth and development.
PERSONAL DETAILS
Father Name: Muhammad Inayat
Date of birth: 15.jan.1986
Religion: Islam
Iqama: 234-***-****
Nationality: Pakistani
Marital Status: Married
Mobile: +966*********
E-mail: **********************@*****.***
Website: www.rigging.yolasite.com
ACADEMIC EDUCATION
High School (Dhunni Kalan from Mandi Baha Uddin)
DAE. Diploma of Associate Engineering
Training Courses Attended / Additional Skills
01. Saudi SABIC Approved Rigger Level. I (Supervisor)
02. MAADEN (MWSPC-MPC-MAC) Approved Rigger Level. I (Supervisor)
03. MWSPC.Turaif Approved Permit Receiver
04. Standard Arabia Rigging Test (Level.1)Certification, KSA
05. Bureau Veritas Rigging Test (Level.1)Certification, KSA
06. Saudi Aramco Certified RIGGER in (2018)
07. Test Rigging Test (Level.1)Certification, KSA
08. Rigging Safety Training
09. Saudi Driving License
10. H2S With SCABA
COMPUTER-SKILLS
MS- Excel
MS-World-
PERSONAL AIMS &PROFILE
Gain communication skills in various locations worldwide 1. Acquainted with all lifting tools, equipment’s, and lifting procedure. 2. Knowledge about all Cranes used in petrochemicals Plants during shutdowns or constructions. Well Experienced in Shutdown activities and constructions of petrochemical plants as well as power plants.
3. Preparations prior shutdown and execution at site. 4. Lifting Plan Preparations as per client procedure or company procedure. 5. Following all safety procedures in plants and familiar with MAA’DEN SABIC/ARAMCO Procedure.
6. Well working during shutdown at Exchangers, Reactors, Column, Fin Fans, valves, etc., 7. Full working Knowledge on Bundle pulling, like manual pulling, or by Bundle Puller. 8. Manage all problems effectively and in a timely manner. 9. Supervision and delegation of staff whilst developing a team culture. 10.Maintain high quality standards of workmanship. 11. Tools box meeting, Material arrangement, Man power distribution & Equipment’s arrangement.
12.Selection of Crane for each lift with proper Safety Factor. 13.Study the locations before lifting & prepare lifting study/ method statement, plan and lifting details in standard format.
14.Explaining the risk in working area and in the work. 15.Carry out inspection of all lifting tools, &color coding & 3rd party certificate is valid. 16.Erection of heavy equipment’s such as all type of structures, pipes, valves, air tank, skids and vessels.
17.Assembling & De-assembling Crawler Cranes up to 15000 tons & Luffer Boom assembling & De-assembling in Truck Mounted and Mobile Cranes up to 1200 tons. 18.Lifting hazard identification and control.
19.Top End lifts and Tandem lifts in all types of structures and vessels. 20.Ensure competent persons for lifting &slinging activities. 21.Daily inspection of Crane and lifting equipment’s, and preparing checklists. 22.Provide safety advice and guidance to line Management. Heavy/Critical Lifting Activities:
In SAFCO — SABIC offloading of 140ton Ammonia Basket 30 meter long in tandem lift using 2 Cranes (SABIC)using 1200&700ton Crane
In MA'ADEN RAS AL-KHAIR (Common Area) removal, tailing & installation of Exchanger weighing 50 ton.
In MA 'ADEN RAS AL-KIIAIR PAP Train A, B, C lifting, removal, tailing and installation of vessels.
Lifting and recovery of tipped over RT crane in HARAD on Rig.
Lifting, Tailing of Compressor & Turbine Casings in Saudi Kayan — SABIC weighing over 65 ton maximum.
Lifting, removal and installation of 50ton sea water motor in SAUDI KAYAN — SABIC.
Lifting, removal, tailing and installation of 56ton sea water pump in SAUDI KAYAN - SABIC.
Lifting and off-loading of passenger metro train engine and bogies in RIYADH on METRO STATION weighing around 90 ton.
Lifting and off-loading of Phosphate wagon train's engine in TURAIF and RAS ALKHAIR MA'ADEN weighing around 120 ton.
Lifting and installation of SPACE FRAME (Roof shade on Security Gates) weighing around 20 ton to 32 ton in RAS AL-KHAIR MA' ADEN, RAHIMA, SAFWA, SIHAT
( ARAMCO SCHOOLS) and TASNEE tennin
In HADEED — SABIC lifting of Laddel Torret weighing 15 ton by hydraulic jacking and skidding out on rollers then lifting by overhead crane.
al at SABTANK JUBAIL.
In HADEED — SABIC lifting of Laddel Torret weighing 15 ton by hydraulic jacking and skidding out on rollers then lifting by overhead crane.
Lifting, Tailing of Compressor Casing in PETROKEMYA — SABIC.
In MADAN SAP KSA removal & installation of 26ton Heat Cooler.
In SAFCO Industrial State Jubail KSA lifting & offloading of 132ton Exchanger 17 meter long
(SABIC).
In SAFCO Jubail Industrial State KSA lifting & offloading of 127ton Exchanger 13 meter long
(SABIC).
Lifting, Removal & Installation of two 65 Ton each Heat Exchangers in PETROKEMYA Jubail Industrial state kSA (SABIC).
Installation of Over Head Crane 32 meter long weighing 18ton weight in TASNEE Jubail Industrial State KSA.
Lifting and offloading of 26 Ton HP Waste Heat Boiler in SAFC (Jubail Industrial State RSA
(SABIC).
Lifting and offloading of 82.5 Ton Synthesis Loop BFW Pre-Heater in SAFCO Jubail Industrial state KSA
(SABIC).
Lifting and offloading of 82 Ton HP Waste Heat Boiler in SAFCO Jubail Industrial State RSA (SABIC).
Lifting and offloading of 83 Ton HP Steam Drum in SAFCO Jubail Industrial State KSA
(SABIC).
Lifting and offloading of 107 Ton Synthesis Loop Waste Heat Boiler in SAFCO Jubail Industrial State KSA (SABIC).
Lifting Removal & Installation of a Pump weighing 3 Ton from a tank with a depth of 30 meters & 45 meters in TASNEE Jubail.
Lifting, loading, transporting and offloading from Trailer of a 56 Ton Reactor in TASNEE Jubail Industrial state KSA.
Lifting, making Tandem, loading, transporting and offloading from Trailer of Rotor Container weighing 14 Ton in TASNEE Jubail Industrial State KSA.
Lifting making Tandem of five Rotor with Containers and loading on trailer weighing 20 Ton each using two cranes in TASNEE Jubail.
Removal & Installation of Sea Water Motor weighing 20 Ton in TASNEE Jubail.
Offloading of four Metal casing baskets 25 Ton, 39 Ton, 44 Ton & 21 Ton respectively in Al- WAHA (SAHARA) Jubail KSA.
Removal & Installation of Eccentric Reducer from Pipeline on the Height of 44 Meter by using Luffing Jib of 550Ton Mobile crane in SADAF Jubail KSA (SABIC).
Lifting, Tandem and Installation of Sea Water Pump and Motor weighing 18 Ton & 11 Ton respectively in Al-WAHA (SAHARA) Jubail KSA.
Dismantling & Installation of 26 Meter long two columns weighing 26 Ton & 30 Ton in PETROKEMYA (SABIC) Jubail Industrial state KSA,
Removal & Installation of Sea Water Motor weighing 35 Ton in SAFCO (SABIC) Jubail Industrial State KSA.
Lifting and Tandem lifting of Sea Water Pump weighing 35 Ton while Removal and Installation in SAFCO (SABIC) Jubail Industrial State KSA.
Removal & Installation of Heat Exchanger (Re Boiler) weighing 65 Ton using 700 Ton Crane in SHARQ (SABIC) Jubail Industrial State KSA.
Removal of Ethylene Vaporizer weighing 35.2 Ton in SHARQ (SABIC) Jubail Industrial State KSA.
Removal, tailing & installation of exchangers in SHARQ EG IV plant— SA TURN AROUND / SHUT DOWN EXPERIENCE
PETROKEMYA - SABIC
SADAF - SABIC
KEMYA - SABIC
SAFCO - SABIC
HADEED - SABIC
GAS - SABIC
SHARQ - SABIC
IBN ZAHAR - SABIC
IBN SINA - SABIC
MA' ADEN RAS AL-KHAIR
TASNEE
SADARA
AR-RAZI – SABIC
AL-BAYRONI - SABIC
IBN ALBAYTAR - SABIC
SARORP
SAHARA SAUDI KAYAN - –SABIC
Ma’aden Aluminium Company (MAC)
Ma’aden Phosphate Company. MWSPC) TURAIF
Ma’aden Aluminium Company (MAC)
NGL Uthmania (Uthman Iya/Udeliya) Saudi Aramco
Berry gas Plant (BGP) Saudi Aramco
EXPERIENCE (16+YEARS)
01.
POSITION: RIGGING & LIFTING SPECIALIST (SME)
Company: Expertise (HADEED PLANT )
Years: JAN -2024, To. PRESENT
Project: HADEED (Maintenance) Jubail
02.
POSITION: RIGGING INCHARGE (SME)
Company: Expertise (Ma’aden Phosphate Company. MWSPC) Years: OCT-2018, To. Dec 2023
Project: Maaden (Maintenance) Turaif
03.
POSITION: RIGGING INCHARGE (SME)
Company: Expertise Ma’aden Phosphate Company (MPC) Years: 2020
Project: Maaden (Maintenance) Ras Al Khair
04.
POSITION: RIGGING INCHARGE (SME)
Company: Expertise Ma’aden Aluminium Company (MAC) Years: 2020
Project: Maaden (Maintenance) Ras Al Khair
05.
POSITION: RIGGING INCHARGE
Company: Expertise
Years: 2018
Project: SADAF, SAFCO,TASNEE, IBN SENA, Maintenance, Annual (shut down) 06.
POSITION: RIGGER 1 (SUPERVISOR)
Company: ICOM
Years: 2017
Project: Yanbu Subic Gas Plant
07.
POSITION: RIGGER 1 (SUPERVISOR)
Company: ICOM
Years: 2018
Project: NGL Uthmania (Uthmaniya/Udeliya) Saudi Aramco 08.
Position: RIGGER 1 (SUPERVISOR)
Company: ICOM
Years: 2017.2018
Project: Berry gas Plant(BGP)
09.
POSITION: RIGGER 1 (SUPERVISOR)
Company: ICOM
Years: 2018
Project: Jubal Subic Gas Plant
10.
POSITION: RIGGER 1 (SUPERVISOR)
Company: Anabeeb
Years: 2017
Project: Yansab, Samref.Sadaf.Tasnee.Ibn Zhar Annual (shut down) 11.
POSITION: RIGGER 1 (SUPERVISOR)
Company: E Tec (Q. MAKS)
Years: 2017
Project: SIPCHEM PLANT (IMC Efficiency Enhancement Project) 12.
POSITION: RIGGER 1 (SUPERVISOR)
Company: AYTB
Years: 2017
Project: Safco Sabic Plant
13.
POSITION: RIGGER 1 (SUPERVISOR)
Company: H.Q.C
Years: 2016.2017
Project: Turaif MA, Aden Waad Al Shamal plant
14.
POSITION: RIGGER 1 (SUPERVISOR)
Company: T.R.C.
Years: 2015
Project: Kemya project
15.
POSITION: RIGGER 1 (SUPERVISOR)
Company: Saudi with con
Years: 2014
Project: J.P.P. project
16.
POSITION: RIGGER 1 (SUPERVISOR)
Company: Anabeeb
Years: 2014
Project: Sadaf.Unated.Tasnee.Safco.Ibn Zhar plant (Annual shut down 17.
Position: RIGGER 1 (SUPERVISOR)
Company: Olayan Descon in Manifa Project
Years: 2012, 2013
Project: Manifa C.H.P.Project
18.
POSITION: RIGGER 2
Company: Olayan Descon in Al Razi Saudi Methanol Company Years: 2009.To 2011
Project: Al- Razi plant, .Sadaf.Hadeed.safco.Ibn Zhar.Annul (shut down) Experience details
Leading the complete rigging Team, including Rigging supervisors, and Foremen.
Plan, organize and see through Heavy/Critical Lifts.
Observe and control potential controllable hazards relating the Rigging
Activity.
Instructing the Team into performing better quality job.
Strictly implement safety standards for a safer job environment.
Make related Job Safety Analysis and have it approved.
Make and implement Approved Rigging/Lifting Plan for all Rigging Activities
On site.
Control complete communication with the crane operator.
Help/instruct the rigging team to select proper Rigging Tackles.
Pre-& Post inspection of rigging tools used in a lift.
Observe and control Rigger behavior for a better professional Environment.
Create and assign job descriptions to all levels working under me.
Roles and Responsibilities
Ensure the compliance of crane lifting Standard Operating Procedure.
Ensure safe rigging works
Conduct site visit and survey.
Coordinate with Maintenance for any lifting job.
Supervise the inspection of rigging tools periodically.
Inspection of lifting Area before the crane assembly.
Inspecting proper ground compaction in the lifting area.
Proper crane assembly
Submission of prepared lifting plans to the respective clients for approval.
Inspecting periodic checklist prepared by crane operator.
Maintaining rigging materials check list.
Lifting will be done basis of perfectness/according to standard not on the assumption.
Supervision and Execution of Works.
Make Daily Accomplishment Report to be submitted on a daily basis
Prepare rigging plans prior to execute lifting of heavy equipment and submit to clients for approval.
Arrange site location for crane positioning as per approved rigging plan
Inspect all rigging accessories to be used as per safety precautionary measured before lifting is to be done.
Make pre lifting orientation and safety precautionary measured so as to avoid
Unnecessary misunderstanding among the rigging crew’s.
As supervisor I personally handle the execution of heavy lifting works And o rdinary lift less than 10 tons i assign qualified rigger’s to do the job.
Supervision provided I have to insure everything is on safe manner before lifting is to be done.
Prepare all lifting accessories to be used on site in at the same time conduct Inspection.
Key Accomplishments.
1. Attending toolbox talk in every day morning.
2. Executed daily operations of coordinating day to day maintenance of plant, received job orders to determine work priorities.
3. Ensuring required mechanical isolations are carried out according to the PTW, JSA and LOTO prior to commencing work.
4. Investigated mechanical failures and unexpected maintenance problems. Safety & Special Assignments
1. Oversaw Health & Safety in work processes by supporting company safety program requirements. Inspecting the physical condition of maintenance department equipment’s as per OSHA, SHEM’s standard.
2. Attended permit to work training and confined space attendant training at SADAF 3. Attended in LT&T(lock out tag out) training at SADAF, KSA 4. Strictly adhere the safety policy & safety regulation in working places, attending various safety programs and every monthly safety communication meeting as per MAADEN policy. 5. Following the QSAFE observation as per OSHA (Occupational Safety & Health of Administration of America) standard safety policy. 6. Major turnaround in chemical company(Chevron Philips company,USA) 7. Good knowledge and experience in Balancing machine operation. 8. Attended Safety and Fire Fighting training courses. 9. Having basic knowledge of computers in MS Office, MS Project & ERP systems. 10. Having knowledge in SAP. Material stock verification and checking the maintenance work notifications etc.
Languages Known
English
Arabic
Urdu
Punjabi
DECLARATION:
I hereby declare that the above mentioned information is correct up to my knowledge and I bear the responsibilities for the correctness of the above mentioned particulars. DATE Zaheer Abbass Gondal