Post Job Free
Sign in

Pipe Fitter General Maintenance

Location:
Batangas City, Batangas, Philippines
Salary:
45 CAN/ HR
Posted:
February 23, 2025

Contact this candidate

Resume:

ANTONIO E. ROXAS

P*-** Sta. Rita Karsada Batangas City

Mobile Number : +639*********

Telephone Number : +634*-***-****

Email Address : *****.******@*****.*** / ***********@*****.***.** Position Desired : Pipe Fitter

SUMMARY EXPERIENCE:

For almost 33 years of Pipefitters experience in piping fabrication, erection installation, maintenance construction, pre-commissioning, and testing. I have acquired the knowledge and learned a new technique for being efficient and effective personnel to reach the main goal of the company. Has good knowledge of reading and interpretation of P&ID isometric drawing and General Plans with good levelling technique & visualization. Provision of extension services after piping construction works mostly related to piping installation are testing and pre-commissioning. Performing task with accordance to OSHA for safety in piping erection and installation. Work history includes work certificates, quality of excellence award, trade test & training certificate, and training & completion certificate on both local and abroad employments.

OBJECTIVE:

Seeking a job that is relevant to my work experiences and specialization in my field of endeavor, in which I can outline the skills and to share my valuable expertise that I learned from my previous company.

EPLOYMENT HISTORY:

COMPANY : ATLANTIC GULF AND PACIFIC COMPANY OF MANILA INC. (AG&P) ADDRESS : SAN ROQUE, BAUAN BATANGAS PHILIPPINES

PROJECT : CLEAN FUEL PROJECT

POSITION : SENIOR PIPEFITTER

WORKING YEAR : MAY 20, 2018 – MAY 15, 2022

DUTIES AND RESPONSIBILITIES:

Check materials to use in fabrication of spools as per isometric drawings and specification.

Lay-out, measure and cutting of pipes as indicated to the Bill of Materials and material take off.

Fit up of spools and fittings for welding.

Fabricate small and big bore pipes.

Install different sizes of valves inside the plants. Dismantling of old pipes and change the new one.

Hydrotesting of all complete Fabricated pipes and valves before installation. Follow safety procedure, use the right tools for the right job. Fit up and install piping supports guides, pipe shoe, clamps in pipe lines and pipe rack.

COMPANY : PRODUCTION SERVICES NETWORK – PSN (Overseas Operation) CLIENT : ESSO EXPLORATION AND PRODUCTION CHAD INC. (EEPCI) POSITION : SENIOR PIPEFITTER

PROJECT : T-CHAD / CAMEROON DEVELOPMENT PROJECT

General Maintenance & Construction Services Contract WORKING YEAR : May 01, 2006 – August 16, 2016

DUTIES AND RESPONSIBILITIES:

Fit-up of fiberglass pipes to elbow tees and flanges. Install valves and gaskets in the manifolds and well heads. Fabrications of spool in fabrication shop preparation for field installation at site. Prepare all piping components for erection in manifest and inside the plants area. Materials take-off for the new drawings, isometric required for fabrication. Material list and spool lay-out for spool fabrication and fittings, valve & gasket.

Prepare manifold use in hydrotesting. Hydrotest all complete spools including valves & fitting for all fabrication in shop related to piping systems use in manifold, well heads, pipe racks, different kinds of piping support, guides, pipe clamps, hangers, spring support use in erection at sites. Coordinate to the direct supervisor regarding some issues & some technical problems encounter during fabrication.

Follow all safety procedures in fabrication and site installation. Checking also issue isometric drawing before start fabrication to minimize wrong materials. Use fittings and orientation.

COMPANY : TCC – TCHAD / CAMEROON CONSTRUCTORS CORP. CLIENT : ESSO EXPLORATION AND PRODUCTION CHAD INC. (EEPCI) POSITION : Pipefitter Fabricator

PROJECT : T-CHAD / CAMEROON DEVELOPMENT PROJECT

General Maintenance & Construction Services Contract COUNTRY : Kome TChad Africa

WORKING YEAR : Dec 09, 2002 – April 30, 2006

DUTIES AND RESPONSIBILITIES:

Requesting and preparing materials use in every manifold, well pads, launchers and receivers for fabrication and installation at site. Assists in surveyors lay-out and excavations of pipe in flow line, manifold and well heads.

Responsible in lay-out and fabrication of S-bend connected in launchers, receivers, and trunklines.

Responsible to execute all modification works conforming to the clients’ approval and specification.

Responsible in shop fabrication, field installation, test and pre-commissioning jobs of all piping system substations, manifolds, well pads, receivers, and launchers prior to TOA schedule and turnover to production services. Prepare daily progress reports and construction status to project management.

COMPANY : ABB SOIMI S.P.A.

POSITION : PIPING FOREMAN

PROJECT : Shurtan Gas & Chemical Complex (SGCC)

COUNTRY : Commonwealth Independent State of Uzbekistan WORKING YEAR : February 04, 2000 – February 01, 2001 DUTIES AND RESPONSIBILITIES:

Manpower supervision and control daily construction activities Responsible for requesting materials at site.

Supervise the daily production as per construction drawing and specification Preparing materials take-off for installation and for shop fabrication Supervision of piping, structural, equipment erection and installation Monitoring and reporting daily construction progress at site. Responsible to execute all field modifications work (WIM) Coordinate with sub-contractor and client representative for proper construction procedure and standard.

Reporting and discussing to project management group regarding construction status and daily works production report.

COMPANY : BONATTI S.P.A.

CLIENT : Wintershall and Shirte Oil Company

POSITION : PIPING FOREMAN

PROJECT : Nafoora Site and Brega Attahady Pipeline. COUNTRY : Nafoora & Brega Libya

WORKING YEAR : April 27, 1997 – March 27, 1999

DUTIES AND RESPONSIBILITIES:

Coordinate to manpower undertaking pre-fabrication activities in the workshop.

Mechanical and piping spool pre-fabrication, monitoring the production of flow line, fit-up and welding tie-in jobs and strings connection. Used to coordinates with the quality control and construction inspector

(Germanisher Lloyd) regarding client welding standard and specification. Fabrication of daily welding activities in the pipeline. Uploading and unloading pipeline materials and stringing of pipes as well. Monitoring and control of production on site works such as fit-up, welding tie- in-jobs and connection of string.

Working in fabrication workshop, erection, installation, pre-commissioning & testing of piping system in all substations, control blocks valve station, well heads & receiving traps.

Report and discuss with the project management regarding the problem occur in operations and daily production for immediate action and find solution. Coordinates with quality control personnel and inspector for proper works execution, conforming to the client’s approved standard specification. Attend daily coordination meeting to monitor daily production schedule. COMPANY : ATLANTIC GULF AND PACIFIC COMPANY OF MANILA INC. (AG&P) CLIENT : BHP Engineering Phils. Inc

Mitsubishi Heavy Industries

Flour Daniel Pacific

POSITION : PIPING FOREMAN

PROJECT : Sabiya Power Station Project

Du-Pont Alternate catalyst Recovery Module Project DRI Project

COUNTRY : Bauan Batangas Philippines

WORKING YEAR : December 12, 1995 – April 16, 1997

DUTIES AND RESPONSIBILITIES:

Responsible for checking and expedite piping materials to be use in Fabrication Shop.

Prepare material take off as per isometric drawing. Scheduling works activities and manpower requirements to meet the required completion dates.

Monitoring and updating daily activities to assure the quality workmanship that meet project and specification.

Monitor all fabrication jobs regarding fit-up & full welding to insure quality and to minimize dimensional fit-up rejection.

Attend daily coordination meeting for the project progress start. COMPANY : AL-YUSR TOWNSEND & BOTTUM CO. LTD. (A.Y.T.B.) POSITION : Pipe Fitter Fabricator

PROJECT : Petromin Shell Refinery Company (PSRC Project) COUNTRY : Jubail Saudi Arabia

WORKING YEAR : October 15, 1989 – November 16, 1994 DUTIES AND RESPONSIBILITIES:

Read and understand drawings, isometric and Gen. Plans. Assigned to work in the plant with the authority to sign and approved safety work permit and assigned off upon job completion.

Installation and maintenance and re-arrange miscellaneous piping system met pre-determined standard. Within the minimum period of time. Ability to work with various piping materials used in the plant such carbon steel, brass, stainless steel, copper, cromoly alloy and aluminum. Dismantling of pumps. Motor and other rotating equipment for cleaning and inspection. Assisting of pump alignment and installation and pullout of relief valve, filters, level gauge for cleaning and calibration. Utilized all pipefitting technique and methods of different type of pipefitting system, butt welds, socket and thread coupling and pipe groove joints. COMPANY : M. AL-MOJIL ESTABLISHMENT (MME)

(Engineering Equipment Inc.)

CLIENT : Mitsubishi Heavy Industries (M.H.I.)

POSITION : Pipe Fitter – Fabricator 1

PROJECT : ASSIR Power Plant

COUNTRY : Gizan, Saudi Arabia

WORKING YEAR : 1987 – June 14, 1989

DUTIES AND RESPONSIBILITIES:

Read and interpret piping shop drawing and written specification and apply the information to actual installation of piping system. Follow material handling procedures and able to take off bill of materials for a respective jobs.

Fabrication and installation of different piping system from small bore to large bore.

Execute the assigned jobs in accordance with approved standard drawing and specification.

Works safety at all times and condition in accordance with safety rule and regulation implement at project site.

COMPANY : M. AL-MOJIL ESTABLISHMENT (MME)

(Engineering Equipment Inc.)

CLIENT : ARAMCO

POSITION : Pipe Fitter – Fabricator 1

PROJECT : Yanbu Crude Oil Terminal (YCOT Project)

COUNTRY : Yanbu, Saudi Arabia

WORKING YEAR : 1985 – 1987

DUTIES AND RESPONSIBILITIES:

Read and analyzed approved shop drawing in respective area of responsibility Performs all piping activities and ability to operate tools associated with piping and mechanical jobs.

Read and interpret general plan and isometric shop drawing. Abide all ARAMCO standards construction procedures in all piping system, fabrication and installation.

COMPANY : M. AL-MOJIL ESTABLISHMENT (MME)

(Engineering Equipment Inc.)

POSITION : Pipe Fitter – Fabricator 1

PROJECT : Saudi Yanbu Petrochemical Co. (Yanpet Project) COUNTRY : Yanbu, Saudi Arabia

WORKING YEAR : 1983 – 1985

DUTIES AND RESPONSIBILITIES:

Read and interpret isometric shop drawing and general plan drawing. Ability to withdraw material necessary for installation or drawing and material list.

Perform job instruction duly assigned by the supervisor and higher supervisor. All assigned activities at site and fabrication should be accomplished at target schedule.

Install pipe supports, dummy support, pipe shoe and guide. Abide all safety requirement and procedure during working hours inside the project vicinity.

COMPANY : M. AL-MOJIL ESTABLISHMENT (MME)

(Engineering Equipment Inc.)

CLIENT : Chiyoda Petrostar Ltd. (CPL)

POSITION : Pipe Fitter – Fabricator 1

PROJECT : Petromin Mobil Yanbu (P.M.Y. Project)

COUNTRY : Yanbu, Saudi Arabia

WORKING YEAR : 1982 – 1983

DUTIES AND RESPONSIBILITIES:

Fabrication and installation of all kinds of fitting, valve and gaskets and all materials related to piping system and fixtures.

Double ending of piping system in pipe rack connected from the vessel downcomer pipe.

Install different kinds of valves and flange fittings. Ability to comprehend rigging signal and precaution during erection and installation.

Follow all materials stated on the bill of materials as per isometric drawing requirement.

COMPANY : M. AL-MOJIL ESTABLISHMENT (MME)

(Engineering Equipment Inc.)

CLIENT : ARAMCO

POSITION : Pipe Fitter – Fabricator 1

PROJECT : Gas Oil Separation Plant (GOSP-3 Project) COUNTRY : Abqaiq, Saudi Arabia

WORKING YEAR : December 18, 1981 - 1982

DUTIES AND RESPONSIBILITIES:

Cutting and measuring pipes as per drawing and specification. Ability to use tools associated with pipe fitter job. Installed correctly all kinds of fitting and fixtures.

Hydro testing of fabricated spools and valves before installation at sites. Securing pipes to their respective position by installing brackets, clamps, pipe shoe and pipe guides.

Submit daily production report to the assigned foreman or supervisor. As a Pipefitter : Material / Tools and Equipment Used: Degree finder Pipe Wrench Plasma Cutter (for stainless steel only)

Steel square Pipe cutter Electric Drill

Spirit Level Tape measure Drill Bit

Grinder small 4” Hammer wrench Torque Wrench

Grinder Big 7” Ball pen hammer Chain Puller

Set of cutting outfit Spud wrench Grinding Disc

Pipe clamp Pencil Grinder Cutting Disc

Chain Block Speed Cutter Alignment clamp

Chain Clamp Soap stone

Center punch Therefore

Tip Cleaner Wrap around

Performs:

• MS Word

• MS Office

• Basic of Computer

CERTFICATES GATHERED:

ExxonMobil Safety Leadership Training Program February 19, 2006 NYA / Moundouli Project

Pioneer Construction Camp, Kome Base

Outstanding Safety Performance November 03, 2005

OSBL Construction Team

KBR Construction / TCM

Safety Excellence Award December 2004

TCC – TCHAD / CAMEROON CONSTRUCTORS CORP.

ESSO EXPLORATION PRODUCTION IN CHAD. INC

Quality Excellence Award April 2004

TCC – TCHAD / CAMEROON CONSTRUCTORS CORP.

ESSO EXPLORATION PRODUCTION IN CHAD. INC

20 Million Man Hours LTI Free Safety Award March 2003 TCC – TCHAD / CAMEROON CONSTRUCTORS CORP.

ESSO EXPLORATION PRODUCTION IN CHAD. INC

Class *B+* as Piping Foreman June 02, 2001

Executive Technical Consultants

Trade Test and Training Center Inc.

PERSONAL INFORMATION:

Date of Birth : November 13, 1958

Place of Birth : Batangas City

Age : 64 years old

Civil Status : Married

Height : 5’6 – 168 cm.

Weight : 150 lb

Citizenship : Filipino

Religion : Roman Catholic

Language Spoken : English, Tagalog

Passport Number : P3375187B

Place of Issue : DFA Batangas

Expiry Date : September 27, 2029

Certification References and Contact Number

Felix Jr. Ordeniza

Commissioning Supervisor

TCC Contractors Corp. (2002 – 2006)

Production Services Network (2006 – 2016)

+63-967*******

Cirilo Garcia

Piping Superintendent

EEI / AL-Mojil EST (Saudi Arabia Project 1981 - 1989)

+63-917*******

EDUCATIONAL BACKGROUND:

TERTIARY LEVEL:

Bachelor of Science in Mechanical Engineering (BSME) 1976 – 1978 Pablo Borbon Memorial Institute of technology (PBMIT) formerly Batangas State University (BSU)

Batangas City

Advance Pipefitting Training Program (Completed) June 21, 1978 PM Overseas Training Center (PMOTC)

Batangas City

SECONDARY LEVEL (Graduated)

Isla Verde High School 1972 – 1976

San Antonio Isla Verde

Batangas City

ELEMENTARY LEVEL (Graduated)

San Agustin Elementary School 1965 – 1971

San Agustin Isla Verde

Batangas City

I hereby certify that the information written above are true and correct to the best of my knowledge and belief.

ANTONIO E. ROXAS

Applicant



Contact this candidate