Antwone Barnes
Solar Journeyman Electrician / Commercial/ Industrial electricianSkid and Forklift Operater Wilson, NC 27893
***************@*****.***
I am strong and willing, hardworking man. I am looking for a career in which I can use my skills to help better the company while learning as much as I can. An getting the job done best as we can with no mistakes and no injuries. Doing the job right the first time and not doing it twice Willing to relocate: Anywhere
Authorized to work in the US for any employer
Work Experience
Commercial Electrician
Renfrow. Inc-Bristol, VA
January 2023 to July 2024
Read blue get right measurements Install wall receptacles in each and hall way install MC caple from each wall to to conjunction box install from conjunction boxes each room install MC cable from rooms to conjunction box down hall way to Electrical control room panels terminate and land in control panel with the right label in fire alarms Drill holes and install right fire alarms on each bathroom pod. Solar Technician
GameChanger-Orangeburg, SC
April 2023 to September 2023
Pull up map of job site. Press on area many issues will pop up. Read map find issue, either could be no communication. If. Its no communication go to the Nobe match the number. Unplug wires in safe manner take down Nobe with impact drill with with Precision undo wires change board go on app change number on Nobe that's on board troubleshoot Nobe change out battery trouble shoot that move panels or push panels through app. Than find another issue, keep area clean and document all work Solar Electrician/ Skid Operator
Superior Skills Trades LLC-Pittsburgh, PA
August 2022 to April 2023
Go over daily plans with GF and electrical crew on digging around which PCS for that day going over the JHA on potential hazards slip trips and falls and the injuries near misses that could happen out in the field. Gather all material for the job that day. Conduit ground wire steal wire. Glue material for hanging combiner boxes for installing cab lines the correct tool for the job igniter for cab welding ground wire for cab welding set up for pulling AC and DC cable measurement Wheels for the measurement from combiner box to PCS inverter install underground conduit back seal conduit with skid steer and excavator Etc Electrical Journeyman
Wood Solar-Virginia
May 2020 to July 2022
Have tools including tape measure for measurements. Pull wire from long distances from combiner boxes to inverters to sub stations. Lay cable in trenches. Terminate cables. Install cab lines. Install combiner boxes. Plugin mod to to mob connections . Install string cables down cab line. Install Condult cut place bell ends flush. In stall Condult for road crossing check your work use level to make all pipe is placed correctly. Make sure work area is after work is done. Work as a team and be your brothers keeper. Move material with skid steer and also backfill trenches. Spread rock on roads back drag to smooth the roads out. Install conjunction boxes spot excavator so he can dig the right measurement so conjunction box and Condult will fit at the right measurement. Run AC cables to conjunction boxes terminate AC. Electrical Helper/Apprentice
Wood-Battleboro, NC
March 2019 to May 2020
Build PCS's punch holes in the grids so I can stub up pvc pipes or conduit to PCS install stator panels boxes run conduit from pcs to stator panel install ground shoot shots or Caldwell to link ground around whole pcs and around conjunction boxes and also install conjunction boxes shoot grounds pull wire through conjunction boxes build cab line along arrays. Run wire down cab lines run wire from inverters to Pcs power station ground and fiber wires. Run wire to substations to field correct footage . Plug and play mod to mod string wire to modules . Hang inverters drill holes ground the inverter to post . Terminate everything PCS,inverters, conjunction boxes, wires going to substation fibers and grounds. Electrical Apprentice
BHI Energy Staffing Solutions-Asheboro, NC
August 2017 to February 2019
Build Standard and NetTracker racking system Install glass . Plug and play manage wire termite wire in inverters pull wire from power stations to inverters clean site of all trash. Install cab line put up hangers run DC cable orderly through cab system.
Electrician helper/ solar installer
Aerotek/ Vaughn Industries-Raleigh, NC
August 2016 to February 2018
Install inverter boxes terminate inverter boxes. Stub up inverter boxes. Lay hdpe run wire through hpde to inverter to power stations, sub power stations. Pull wire from power stations to inverter. Terminate breaker boxes on power tation. Lay ground wire in trenches from inverter to power stations
Solar Panel Installer
Jand b Solar/ Decca Energy-Scranton, SC
April 2016 to August 2017
Install Solar panels. Build tracker rotating racking system from laying post to lifting installing tubes sattle brackets weel barons. Cleaning site of all material. Moving material with skid stir laying out glass and laying out material
Solar Panel Installer
Elite/ Tradeforce international-Elm City, NC
October 2015 to March 2016
Install Solar panel glass and connect wires/plug and play. Also worked in wire management. Pulled and laid dc feeder wire .Pull high and mid voltage wire Forklift Operator
Bruce Foods
August 2010 to March 2015
NC
Load and unload trucks with product. Store product in rows to be loaded out. Forklift operator
Berry Farms-Sims, NC
February 2010 to June 2010
Gather plants for orders for walmarts/Kmarts and other stores. Load them on Trailer and take them to dock to be shipped. Seasonal job.
Forklift Operator
Unirversal Leaf-Nashville, NC
August 2007 to February 2010
Load and unload trucks with tobacco. Take tobacco bells and load lines, to process the tobacco sweep and clean area after shift
Education
Certificate
Wilson Community College - Wilson, NC
January 2001 to September 2001
GED in Contact Antwone Barnes on Jobcase
Wilson Community College
January 2001 to September 2001
Skills
• Solar (8 years)
• General Laborer (10+ years)
• Construction (7 years)
• Electrical
• Power Tools
• Forklift Operator (8 years)
• Construction Experience (6 years)
• Electrical Experience (5 years)
• Cabling
• English
• Mechanical Knowledge
• Glass Installation
• Landscape Maintenance
• Plumbing
• Roofing
• Forklift
• Carpentry
• Remodeling
• OSHA
• Wastewater
• Fabrication
• Assembly
• Schematics
• Electrical wiring
• Construction
• Schematics
• Assembly
• Industrial equipment
• Plumbing
• Leadership
• Supervising experience
• Team development
Links
https://www.jobcase.com/p/antwone.barnes3
Certifications and Licenses
Forklift Certified
Present
OSHA 10
Present
Electrician Apprentice
Minnesota Apprentice license
November 2023 to November 2025
OSHA 30
Driver's License
BICSI Certification