Jag Chawla
EXPERIENCE SUMMARY:
Thirty-eight years of experience in construction, design, startup testing, maintenance and modifications of systems in Nuclear Power Plants. Sound knowledge of ASME, B31.1, NFPA and ANSI codes. PE License in Mechanical Engineering. Technical expertise in Engineering Analysis, process flows, screening evaluations for safety questions and failure analysis, development of Design Change packages, preparation/ revision of P&IDs, Piping and support analysis, usage of PDMS and Primavera P6 scheduling program and Vendor document reviews. Substantial capability of interpreting One-line, Elementary and Wiring drawings and Loop diagrams.
DETAILED WORK EXPERIENCE:
VOGTLE NUCLEAR POWER PLANTS UNITS 3&4, WAYNESBORO, GA June 2014 to Present
Position: Design/ Implementing Engineer
Reviewing and critiquing design change packages prepared by SNC / AE Organizations
for integration of Operating Units with the new AP1000 Units Obtaining Plant impacts and processing design changes for implementation approval
Providing technical guidance to Planners in preparation of implementation work orders
Monitoring field work, generating and processing field change requests during design implementation
Interfacing with Work Management, Operations, Projects etc. during the entire life cycle of the design change
Preparing and processing the design change closure package as a QA record ENERCON SERVICES, KENNESAW, GA
August 2013 to June 2014
Position: Senior Technical Specialist
Responsible for preparation/ review of documents required to implement NRC Enforcement actions associated with Fukushima accident response. These include but are not limited to Flexible portable system documents, supporting evaluations, design change packages and Overall implementation Plan strategies. Responsible for presentations of the documents to the Client, incorporating comments and obtaining approval.
VOGTLE NUCLEAR POWER PLANTS UNITS 3&4, WAYNESBORO, GA January 2012 to February 2013
Position: Project Engineer
Responsible for technical direction and oversight of construction and modification activities performed by Shaw, GPC and other contract organizations for two new AP1000 units at Plant Vogtle.
Determined, implemented and monitored mitigation plans to ensure that work performed does not adversely affect operating units. Coordinated with Site Design, Work controls, Operations and other departments of Operating Units to facilitate implementation of activities affecting common facilities.
Prepared long term plans and schedules for completion of ancillary buildings and structures associated with Units 3 and 4.
VOGTLE NUCLEAR POWER PLANTS UNITS 1&2, WAYNESBORO, GA June 2003 to Dec 2011
Position: Senior Design Engineer
Responsible for design development, implementation and closure of Design Changes.
As a member of the design team, worked closely with other Plant departments and Management staff to identify immediate and long-term needs of the facility. Developed design change packages, containing Mechanical, Electrical and Civil/ Structural scope to provide the most effective and prompt resolution. Scheduled and supervised implementation.
Performed functional testing, Return-to-service and close-out of Design change packages.
February 1986 to June 2003
Position: Senior Engineer
As a Modifications Engineer, provided support for development of design changes that included Mechanical, Electrical and Civil/ Structural scope of work. Processed completed design changes and supervised implementation. Carried out functional testing and returned systems back to service. As a Technical support Engineer, performed in-service inspections and wrote testing and maintenance procedures for several systems.
As a Startup Engineer, developed and implemented test procedures for Fire suppression and detection systems during the construction and start-up phases of Units 1&2.
BEAVER VALLEY NUCLEAR PLANT, UNIT 2, SHIPPINGPORT, PA July 1985 to February 1986
Position: Level II Startup Engineer
Performed all Start-up activities on Fire Protection system. Coordinated with Site Engineers and Constructors to ensure that the sub-systems were released per established procedures.
Prepared specific test procedures and placed the sub-systems in service after satisfactory completion of testing.
WOLFCREEK NUCLEAR GENERATING STATION, NEW STRAWN, KANSAS March 1984 to February 1985
Position: Level II System Startup Engineer
Prepared and implemented test procedures for flushing systems and testing individual components.
Performed Pre-operational test procedures and verified operability and compliance with FSAR and other licensing and regulatory requirements. BECHTEL POWER CORPORATION, GAITHERSBURG, MARYLAND
January 1982 to June 1985
Position: Mechanical Engineer
Designed Mechanical systems for various operating conditions in accordance with the licensing basis for the plant.
Selected/sized components, performed seismic qualifications of equipment, valves etc.
Reviewed and approved construction drawings.
Performed nuclear class 1 analysis on Pressurizer safety relief valve system piping.
STONE & WEBSTER ENGINEERING CORPORATION, CHERRY HILL, NJ June 1980 to January 1982
Position: Mechanical Engineer
Performed mechanical design of piping systems using computer programs and rigorous hand calculations.
Designed structures and restraints for seismic, hydro-dynamic, thermal and other operating loads.
UNITED AERO PRODUCTS, BURLINGTON, NEW JERSEY
April 1980 to June 1980
Position: Industrial Engineer
Carried out process planning, work measurement and methods improvement for aircraft components manufactured on conventional and special purpose machines. MALHOTRA INDUSTRIES, BOMBAY, INDIA
September 1977 to February 1980
Position: Chief Industrial Engineer
Directed all Industrial Engineering activities for all razor-blade and talcum powder manufacturing plants.
Prepared long range goals for productivity improvements in the plants and worked in close coordination with the Plant Managers. implementation. VOLTAS LIMITED, BOMBAY, INDIA
September 1972 to September 1977
Position: Industrial Engineer
Performed work studies, value analysis, job evaluation, layout and inventory control studies in a manufacturing plant.
EDUCATION:
MS in Mechanical Engineering from SUNY at Stony Brook, NY in 1972 with 3.67/ 4.0 GPA.
BS in Mechanical Engineering from Indian Institute of Technology (IIT), Bombay, INDIA