RIGOBERTO GONZALEZ
La Marque. TX *****. *** – *** – 0319
**********@*****.***
TECHNICAL EXPERIENCE:
• Dedicated and driven proffesional with a successful career in piping
Accordance with company and regulatory standars with focus on
Compliant documentation and process improvements.
Construction and reporting on quality system walk-downs and
Testing procedures such as pneumatics and hydrostatic tests.
AREAS OF EXPERTISE:
• QUALITY CONTROL
• COMPLETION WALK-DOWNS. TWP AND IWP
• TESTING QUALITY CONTROL
• INDUSTRIAL CODES AND STANDARDS
• TEAM LEADERSHIP
• PIPE CONSTRUCTION
• FABRICATOR (PIPEFITTER) HDPI, SOCKET WELD, BUTT WELD AND THREADED PIPE
• COATING AND INSULATION SPECIALIST INSPECTOR
PROFESSIONAL EXPERIENCE:
• ZACHRY INDUSTRIAL INC. (PROJECT/ CCZJV GPX SABINE PASS, TX)
-TITLE: COMPLETION WALK-DOWN / TESTING / PIPEFITTER FOREMAN
(11/2021 – 05/2024)
-SUPER ENTENDENT SHANNON MCALLON
-OFFICE: 3901 TWIN CITY HWY, PORT ARTHUR, TX 77642
-PHONE NUMBER: 337-***-****
-Inspect iwp (installation work package) and twp (test work package).
-coordinate with construction and company representative pre-test
Verification walks and the post reinstatement walks.
-capture and track to completion of any deficiencies discovered that are
Required to test then safely and accurately restore piping system after
Testing and ultimately turnover the work to commissioning.
-Participate in meetings for pipe testing and construction turnover to
Ensure all parties are aware of the walk-downs status and readiness of the
Package or sub-system.
-ensure all itrs (internal test report system) are currently in co-console
And completed during testing, interpret chart recorder graphics from
Pneumatic and hydrostatic tests with client representative.
-work with nde team (non-destructive examination) what joints will be
Capture on post or post commissioning by
Zpts (zachry piping tracking system) and co-console platform.
• ZACHRY INDUSTRIAL INC.
-TITLE: PIPE FITTER FOREMAN
( 10/2020 – 11/2021)
-Inspect and ensure all work shown on drawings and in project specifications
Are completed before the iwp (installation work package) is fully
Progressed and athorize as complete, conduct a readiness walk before
Scheduling the pre-test walk to ensure that all work contained in the
Relevant iwp’s has been completed.
-perform pre-test verification walk, witness test and post reinstatement
Walk and intended to identify and address only deficiencies to test then
Safely and accurately restore piping system after testing.
-review punch list items found and categorize them before the punch list
Subsystem meeting and agree or desagree with the category listed and
Contractor responsible.
Pipe fabricator
Read blueprint and p&ids
Install valves and flanges
Bolt up
• ZACHRY INDUSTRIAL INC. (PROJECT/ CCZJV GPX SABINE PASS, TX)
-TITLE: PIPEFITTER FOREMAN
- ( 10/2022 – 05/2024)
-SUPERINTENDANT “GEOFF YOUNGBLOOD”
-GENERAL FORMAN “AUSTIN DUNSFORD”
-OFFICE: 3901 TWIN CITY HWY, PORT ARTHUR, TX 77642
-PHONE NUMBER: 662-***-****
-Supervised construction related work activities and assigned field functions
And or crafts involved within discipline on the project.
-maintained quality of all piping work in accordance with the standards to
Complete project within the budget and time frame.
-coordinated the work activities of all involved crafts such as pipefitters,
Welders, bull riggers. Scaffold builders, riggers, millwrights within a
Discipline during the entire construction effort.
• PERFORMANCE INC.
-TITLE . (PIPEFITTER)
- (05/2019 – 06/2020)
-GENERAL FORMAN “SCOTT HORN”
-OFFICE: 4219 RED BLUFF RD, PASADENA TX 77503
-PHONE NUMBER: 832-***-****
-Interpret iso” (isometrics diagrams represented a three – dimensional view on
A two – dimensional scale) and p&id (piping and instrumentation diagram).
-outlined, aligned, and fabricated, forged components to assemble structural
Forms including machinery frames, tanks, pressure vessels, fundance shells, and
Pipes in accordance with blueprints and metalurgy.
- ZACHRY INDUSTRIAL.
( 03/2018 -04/2019 )
( PIPEFITTER )
-SUPERENTENDENT. TRACY MURPHY
PHONE. 859-***-****
Hydro testing
Prep and set up blind in all spool air test and instrument test.
Read blue print and p& idis.
Identify pipe measurements and prepare to put pressure on them
-ZACHRY INDUSTRIAL INC.
SCHOOL AND DEVELOMENT CENTER
PIPEFITTER TRAINING COMPLETION
( 03 - 2018 / 06 - 2018 )
- Read blueprints and specification to determine the scope pf work, location,quantities, and sizes of material requiered.
- identify all tools requiered for tasks.
- identify safety risks and the precaution requiered to eliminated those risks.
- illustrate in-depth knowledge of all pipe fitting processes.
- manage crew in regard to processes, scheduling, costs, employee relation issues and employment needs.
- Fabricate pipe
Put the pipe in coordinates and install valves and flanges.
ZACHRY INDUSTRIAL INC.
PHILLIPS 66 TERMINAL
INSULATION GRAL FOREMAN
( 04 - 2016 - 02 - 2018 )
SUPERENTENDENT. GEORGE ROMERO
PHONE. 210- 710 – 0201
Plan a safe and effective work using the correct safety measures. Identify the pipes to know the material they need for their insulation. Talk with co-workers and use appropriate measures for the quality of work.