TOMMY L. MAUER, III

Senior Scheduler / Senior Project Controls Specialist

Pittsfield, MA 01201

650-***-****

******.***@******.***

SUMMARY

Detail-oriented Senior Scheduler with 18 years of experience in project controls, specializing in high-budget government public works projects throughout all phases of the project life cycle. Possesses a complete working knowledge of all industry standard scheduling software applications, including Primavera (P3.1, P6), MS Project, and Suretrak. Expert knowledge in CPM scheduling, cost/resource loading, and leading project baseline and periodic schedule acceptance meetings. Successfully managed complex projects across vertical construction, highway heavy, bridges, water/wastewater, aviation, light/commuter rail, hospitals, and other industry sectors, achieving significant time/cost savings while enhancing stakeholder communication. Expert in schedule risk assessment, development, cost control, variance analysis, earned value metrics, and construction delay claims (Time Impact Analysis), driving project success through strategic planning and execution.

EXPERIENCE

CONSOR ENGINEERS, San Francisco, CA December 2022 to Present

Senior Scheduler

Programs most often used with an expert level proficiency include Primavera (P6 20.1), MS Project, vPlanner, Microsoft Excel, Word, PowerPoint, Bluebeam, Schedule Comparison, Change Inspector, and other programs. Daily tasks involve several high-profile client projects in government public works, including:

Aviation (SFO’s $2.6B Terminal 3 West Expansion) – scheduling consultant between client SFO and the contractor, Turner. Reviewed baseline submittals until an acceptable spec compliant baseline schedule was achieved. Maintenance involves leading schedule update meetings, reporting on contractual milestones, interpreting technical scheduling data, and providing sequencing strategies with recommendations for stakeholders, saving several months of time on the projected substantial completion date.

Parking structures (County of Alameda - City of Dublin Transit Center) – assigned to mitigate potential time impacts on the $24M, 8 level (with 3 underground) parking structure. Successfully implemented an alternative utility workaround sequence, saving 4 months on the previously planned project completion date.

Water/wastewater treatment plants (East Bay Municipal Utility District, Rinconada) – As the scheduling consultant between the Flatiron and East Bay Municipal Utilities District (EBMUD) $242M spec 2128 project, conducted baseline schedule analysis to acceptance, leads periodic update review meetings, and reports upon time impact mitigation. In the South Bay, these same responsibilities are performed for the $220M phases 3-5 work on the Rinconada Water Treatment Plant built by Kiewit for Santa Clara Valley Water. A particularly unique challenge is managing access through the operational areas, and work constrained to blackout/low flow periods to hit these moving targets and avoid scheduling gaps.

Light/commuter rail (BART, Caltrain) - Applies project controls scheduling and cost control on several projects at the programmatic level. Also used previous Power BI experience to develop fully cost/schedule integrated dashboards for the Joint Powers Board (JPB). Improved department communication by revising planning procedures to account for the risks associated with environmental permitting and utilities work.

Medical centers (Santa Clara Valley Medical Center – Behavioral Hazard Services Center renovations) – Heading design scheduling for the Architectural and Engineering teams. Leading schedule meetings to keep the team cognizant of complicated relationships and other constraints to avoid bottlenecks.

Analysis/preparation of time impact analysis (TIA) claim delays and heading mitigation efforts, such as that on the Oroville Dam Spillway, involving a misunderstanding of excusable/non-excusable delays relative to being compensable or non-compensable.

Participation in pull planning and training sessions for on-site clients is another daily function.

Project controls time/cost led successes include what-if schedules to test alternatives, simulating work around plans in anticipation of utility access restrictions, and resequencing trades work to move with better synchronization, saving hundreds of days of project time, and more than $10M in combined project costs when comparing as-built and archival data.

INFRASTRUCTURE ASSOCIATES, Houston, TX September 2017 – December 2022

Senior Scheduler

Schedule Analysis of contractor schedules, pay applications, alternatives analysis, schedule variance analysis, potential time impact notifications, and claims mitigation services for TxDOT projects located in the San Antonio, Austin, and Houston district offices, and MassDOT district 1 office. Software used for these tasks included Primavera (P6 15.2), Excel, Bluebeam, Schedule Comparison, and Microsoft Project.

Provided schedule development, maintenance, analysis, and support for other district engineers and project schedulers within other TxDOT and MassDOT regional offices.

Working as a scheduling consultant for the Harris County Flood Control District’s $2.8 Billion 2018 Bond Program, was tasked leading scheduling for the Hall’s Bayou design team (LAN), and authored the standards in programmatic schedule development, tracking, analysis, and reporting for the design/engineering planning stages, feasibility/funding, work breakdown structure (WBS) creation, cost loading, key performance indicators (KPI’s), and development of the program-wide Power BI dashboard.

AEGION CORPORATION, Chesterfield, MO April 2014 – February 2018

National Scheduler

Led scheduling, cost, and operations management related services for all regional infrastructure and water/wastewater related work within the North America project portfolio in the Infrastructure Solutions division. These services were provided using Primavera (P6 15.2), Microsoft Excel, MS Access, and included:

Resource loading of project schedules for development/tracking of time dependent tasks, labor, materials, and equipment.

Instilled timesheet integration by linking P6 with field labor hours into a SQL database, which is subsequently imported into the internal billing system JD Edwards.

Standardized work packages for precision in estimating, forecasting, and bidding services using P6 data.

Oversaw the creation and distribution of weekly reporting for the Infrastructure Solutions portfolio.

QN MANAGEMENT SOLUTIONS, Plano, Texas November 2011 – April 2014

Project Scheduler/ Project Controls Specialist

Subcontracted by HNTB to perform cost control, cash flow reports, compile earned value (EV) metrics, financial feasibility reports, and other integrated scheduling and financial reporting for the North Texas Tollway (NTTA) board of directors.

Initiated schedule baseline development and maintenance for General Contractors Herzog and Archer Western vertical construction projects and attended weekly schedule meetings with project owners.

Reconciled subcontractor schedules into the Integrated Pipeline Project (IPL) master schedule.

Innovations include the use of cost-driven scheduling on the $1.4B Chisolm Trail Parkway to make extensive, automated use of P6’s deep reporting capabilities.

CITY OF FORT WORTH, Fort Worth, Texas January 2010 – November 2011

Project Controls Specialist

As a Project Controls Specialist for the City of Fort Worth, daily duties utilizing PRIMAVERA (P6.2) and Microsoft Excel included:

Developed and maintained cost loaded project schedules in the program portfolio’s enterprise schedule.

Prepared narrative background summaries/reports on the program portfolio for management.

Succinctly interpret technical performance measures such as those associated with earned value (EV), Schedule Performance Index (SPI), Cost Performance Index (CPI) and other indicators of program success.

SUNLAND GROUP, Dallas, Texas June 2007 – January 2010

Project Controls Specialist (Scheduler/Estimator)

Applied cost control, scheduling, and estimating expertise on several ongoing client projects ranging from highways, bridges, light/commuter rail, facilities, hospitals, and airports. Daily responsibilities and duties included:

Schedule analysis for TxDOT Dallas District highway projects, attending weekly contractor meetings, and evaluating contractor delay claims with provided analysis and recommendations.

Procured design/construction schedules at any project life cycle stage, whether for proposals, preliminary design/engineering stage, bidding, baseline acceptance, and periodic maintenance updates.

Scheduling software used included: PRIMAVERA (P3.1 & P6.2), SURETRAK, and MS PROJECT.

ORGANIZATIONS:

EDUCATION:

TEXAS TECH UNIVERSITY, Lubbock, Texas – B.B.A., Finance, 2006



Contact this candidate