Juan Martín Olivarría Rodríguez
Privada *ta de Monteverde No. 288, Col. Reforma Norte, Hermosillo, Sonora Email: ************@*****.***
Tel. (662-***-**-**
SCHOOL AND TRANNING
Sep 84 - Apr 87: Mecanical Engineering at Instituto Tecnológico de Sonora, Guaymas, Sonora, México.
Sep 90 - May 92: Enviromental Engineering at, Rancho Santiago
College, Orange, California.
1992: Steam engineer Licence By Los Angeles Safety and Building Departament.
1993: 40 Hrs Haz-Mat Tranning By Osha and EPA, Los Angeles, Ca.
1993: Refinery Safety Overvieww Cert (RSO) By CAL-OSHA
1999: Nuclea Site Acces Tranning (SAT) By Nuclear Regulatory Comm.(NRC).
1999: Radiological Work Practices (RWP-Advance Rad Worked) By Nuclear Regulatory Commission (NRC).
2000: Inspections and Welding Procedures by Nuclear Regulatory Commission (NRC).
WORK EXPERIENCE
30 (Thirty) years of combine experience as Superintendent and/or Supervisor in the construction and maintenance industry of nuclear power plants, combine cicle power plants, steam turbines, refineries, chemical plants, transmission pipe line (i;e;) natural gas, oil, water sewer, mines, USA Navy shipyard, processing and assembling plants (i;e; automotive, food, papermill, etc.)
PROYECTS FIELD EXPERIENCE:
Coordination of proyect start up (Recluting qualified personal, proper machinery and equipament, as well as proper construction procedures; following proyect program and /or proyect needs).
Supervision of quality assurance and quality control procedures as well as equipament instalation manuals to achive a succes full proyect program develoment.
As built desing and fabrication of:
-High and low pressure piping systems (i,e; welded steel pipe stainless steel, copper- niquel, chrome, inconel, copper, etc.)
-Under groud piping (natural gas, oil, water, sewer)
-Miscellaneus stel structures for equipament instalation (Grinding ball mills, crushers, feeders, pumps, etc.)
Coordination of engineering protocols for welding certification processes such as SMAW (stik manual arc welding) TIGW (Tunsgten Innert Gas welding), FCMAW (Flux core Manual arc welding) Acording with the las edition construction code: ASME SECC. IX AND V (High pressure vessels and nuclear plants). ANSI B31.1 Chemical Plants). API 1104 (Pipe Lines). AWSDI.I (Structural Steel). ABS (American Bouream of shipping). USA NAVY Military Welding codes.
WORK HISTORY:
HERMOGAS – Guaymas, Son.
Date: January a March 2014
Position: Supervisor (Weldin and piping)
Proyect: Holding plant and distribution pipe lines
CIBSA/OUTOTECH – Nacozari, Son. (Fundición Grupo México)
Date: October a December 2013
Position: Superintendent (night shift)
Proyect: Flash smelting furnace modernization
METAL MASTER/FRISCO – Nacozari, Son.
Date: October 2011 a oCTOBER 2013
Position: Supervisor/Superintendent
Proyect: Mina El Concheño Chihuahua, Chih. Grinding mills, crushers, thickners, merryl crowe and pumping systems.
Proyect: Mina San Francisco del Oro, Chihuahua, Chih, (Grupo Frisco) Grinding Mills.
Proyect: Mina Real de Angeles, San Felipe B.C. (Grupo Frisco) 200 Ton. Desin bin (Lime).
FME CASTILLO/GRUPO MEXICO
Date: Augus 2009 a October 2011
Position: Superintendent
Proyect: Fabrication and instalation of dust dry presipitator at Molimex Plant, Cumpas, Son.
Proyect: Grupo México, Cananea, Son. Repair and maintenance of 12 dust colectors as well as desing (as built) and fabrication of conveyor, slurry conduction system.
J&M ASSOCIATES/TRADESHEN INTERNATIONAL/ADVANCE TEC.
Date: From Jan 2004 to March 2006
Position: Foremen/Weldtech
Proyect:
-Nassco Shipyard National City, Ca
-4 oil tankers 1,200.000 brus. (British petrollum)
-10 cargoships (USA Navy)
-South West Marine Shipyard, San Diego, Ca.
-2 Destroyers (USA Navy maintenance)
-3 Cargoships (USA Navy maintenance)
-1 Aircraft Carrier (USA Navy maintenance)
THE ATLANTIC GROUP.
Date: Apr 2000 to Dic 2005
Position: Nuclear Welding Technician
Proyect:
-Palo Verde Nuclear Generation Station Refuling Outage (General Maintenance) Tonopah, Az.
-Copper Nuclear Generation Station Refueling Outage (General Maintenance) Brownsville, Nb.
GRUPO BRIDEL (TIC)/CONSTRUPLAN (ENRON)/GUTSA (PEMEX)
Date: May 1996 to Apr 2001
Position: General Foremen
Proyect:
-Natural Gas Pipeline 6” 28 km (TIC)
From: Nogales, Az. USA (El Paso Natural Gas)
To: Parque Industrial San Carlos, Nogales, Sonora, Mex.
-Natural Gas Pipeline 12” 30 KM (Construplan)
From: Mesa del Seri, Power Plant, Hermosillo, Sonora, Mex.
To: Boulevard Solidaridad, Hermosillo, Sonora, Mex.
-Natural Gas Pipeline 16” 128 KM (ENRON)
From: Douglas, Az. (El Paso Natural Gas)
To: Fundición Nacozari, Sonora, Mex.
-Natural Gas Pipeline 16” 110 KM (Construplan)
From: Douglas, Az. (El Paso Natural Gas)
To: Minera Cananea, Cananea, Sonora, Mex.
-Natural Gas Pipeline 14” 36 KM (Union Fenosa)
From: Carretera Internacional (PEMEX Natural Gas)
To: Unión Fenosa Power Plant, Hermosillo, Sonora, Mex.
-Pemex Pipeline 8” 5 KM (GUTSA)
From: Pemex Refination Plant Parque Industrial
To: Guaymas-Hermosillo Pipeline.
NOTE.- PERSONAL AND/OR JOBS
REFERENCES UP ON
EMPLOYER REQUEST