CURRICULUM VITAE
PERSONAL DATA
*. Name : John B. Fetalino
2. E-mail: **********@*****.*** Mobile Number: 092********
3. Home Address : 18-B Rimando Road, Baguio City 2600, Philippines
4. Provincial Home Address : Budiong, Odiongan, Romblon, Philippines
5. Present Address: 527-C Lanzones Street. Clarkview, Malabanias.
Angeles City 2009, Pampanga, Philippines
6. Date of Birth: 21 April 1962 Place of Birth: Quezon City.
Metro Manila, Philippines
7. Civil Status: Married Citizenship: Filipino
8. Height: 163 cm Weight: 60 Kg
9. Religion: Islam Sex: Male
10. Name of Wife: Lolita Diaz Fetalino Occupation: OCW
11. No. Of Children: Five (05)
Name/Date of Birth: 1. Abigail Apple J. Escultura, 31 August 1989
2. Joavel Kent E. Fetalino, 20 November 1991
3. Annie May J. Escultura, 04 April 1998
4. John Michael C. Nabalatan, 11 September 1998
5. Jolit Natasha Claire D. Fetalino, 29 May 2008
12. Father’s Name: Alfredo B. Fetalino Occupation: Deceased
13. Mother’s Name: Jean B. Fetalino Occupation: Deceased
14. Languages or Dialects can speak/write: Tagalog, English
15. Person to be contacted in case of emergency :
Joavel Kent E. Fetalino
Address : 18-B Rimando Road, Baguio City 2600, Philippines
Mobile Number: 091********
EDUCATIONAL BACKGROUND
Elementary School: Date Graduated :
Doña Aurora Elementary School March 1975
Baguio City, Philippines
High School: Date Graduated :
University of Baguio March 1979
Baguio City, Philippines
Vocational: Date Graduated :
National Manpower and Youth Council December 1983
Taguig, Metro Manila, Philippines
College: Date Graduated :
Patts College of Aeronautics Undergraduate
Pasay City, Metro Manila, Philippines March 1990
Course :
B.S. in Aeronautical Engineering
5th Year, 1St Semester
Special Skills :
Electro-Mechanical Works
CHARACTER REFERENCES : (Not Related)
Name Occupation Address
1. Danilo Fariñas City Official Baguio City,
Philippines
2. Benjamin Santander President Pasay City,
Solar Construction and the Philippines
Services, Inc.
3. Mohd. Ahmed Bu-Bushait Engineer/General S.A.N.G., Dammam
Technical Department Saudi Arabia
National Guard
Housing Project
4. Fardan Thabet Al-Mihairy Engineer/General S.A.N.G., Dammam
Technical Department Saudi Arabia
National Guard
Housing Project
EMPLOYMENT RECORD : (from present work backward)
FROM TO POSITION ORGANIZATION
15 May 2019 Present Partner Driver Transportify
Self-employed Philippines
22 July 2013 08 Dec. 2018 Project Coordinator Zamil Operations and
Maintenance Co. Ltd.,
K.S.A.
05 Feb. 2010 21 July 2013 Department Head Zamil Operations and
Maintenance Co. Ltd.,
K.S.A.
27 Dec. 2006 04 Feb. 2010 Department Head Annasban Group
A Limited Company,
K.S.A.
27 Dec. 2003 26 Dec. 2006 Department Al-Jazeera Enterprises
Officer-In-Charge Trading and Industry,
K.S.A.
27 Dec. 2000 26 Dec. 2003 Maintenance Al-Twaik Est.,
Supervisor K.S.A.
17 March 1998 26 Dec. 2000 Maintenance Sahara Maintenance
Supervisor Services Co. Ltd.,
K.S.A.
15 Aug. 1991 15 March 1998 Site Supervisor Solar Construction
And Maintenance Services Inc.,
Philippines
01 June 1990 14 Aug. 1991 General Foreman Enriquez Construction
Inc., Philippines
JOB DESCRIPTION / DUTIES AND RESPONSIBILITIES:
15 May 2019 – Present Partner Driver
Self-Employed
Transportify Philippines
This is a Logistics Institution,
My objective was to:
1. Be on time at pick-up location
2. Received the items to be delivered
3. Delivered the items to the required recipient
4. Report to the booking customer if any problem occurred
22 July 2013 – 08 December 2018 Project Coordinator
Zamil Operations and Maintenance
Company Limited
National Guard Housing Project
Dammam, K.S.A.
This project consists of:
1. Cleaning and Pest Control Department
2. Irrigation and Landscaping Department
3. Sewage Treatment Plant and Water Supply Department
4. Public Buildings and Housing Villas Maintenance Department
My work was to:
1. Be responsible for directing, organizing, and controlling project activities.
2. Attend client meetings and assist with the determination of project requirements.
3. Review all preliminary reports including planning studies for the project.
4. Investigate statements or site data in project reports that appear uneconomical or inconsistent with policies.
5. Accomplishes department objectives by meeting work and cost standards, and providing work direction to staff.
6. Accomplishes work requirements by orienting, training, assigning, scheduling, and coaching employees.
7. Use project scheduling and control tools to monitor project plans, work hours, budgets, and expenditures.
8. Effectively and accurately communicate relevant project information to the client and project team.
9. Ensure clients’ needs are met in a timely and cost-effective manner.
05 February 2010 – 21 July 2013 Department Head
Zamil Operations and Maintenance
Company Limited
National Guard Housing Project
Dammam, K.S.A.
This department consists of:
1. Sewage Treatment Plant
2. Potable Water Distribution (Water Tower)
3. Swimming Pool
Have different kinds of:
1. Pumps, Motors, and accessories
2. Control Panels
3. Pipe Works and Fittings
My work was to:
1. Make sure the Project is in Smooth Operation
2. Checked and Approved Prepared Preventive Maintenance
Schedule by Supervisors
3. Studies the Recommendations done by the Supervisors and
approved it if can be applied for better Operation of the Project
4. Do Reporting and Recommendations to the Company and to
the Client about the Project
27 December 2006 – 04 February 2010 Department Head
Annasban Group
A Limited Company
National Guard Housing Project
Dammam, K.S.A.
This department consists of:
1. Sewage Treatment Plant
2. Potable Water Distribution (Water Tower)
3. Swimming Pool
Have different kinds of:
1. Pumps, Motors, and accessories
2. Control Panels
3. Pipe Works and Fittings
My work was to:
1. Make sure the Project is in Smooth Operation
2. Checked and Approved Prepared Preventive Maintenance
Schedule by Supervisors
3. Studies the Recommendations done by the Supervisors and
Approved it if can be applied for better Operation of the Project
4. Do Reporting and Recommendations to the Company and the Client about the Project
27 December 2003 – 26 December 2006 Department
Officer-In-Charge
Al-Jezirah Enterprises Trading and Industry
National Guard Housing Project
Dammam, K.S.A.
This department consists of:
1. Sewage Treatment Plant
2. Potable Water Distribution (Water Tower)
3. Swimming Pool
Have different kinds of:
1. Pumps, Motors, and accessories
2. Control Panels
3. Pipe Works and Fittings
My work was to:
1. Make sure the Project is in Smooth Operation
2. Checked and Approved Prepared Preventive Maintenance Schedule by Supervisors
3. Studies the Recommendations done by the Supervisors and approve them if they can be applied for better Operation of the Project
4. Do Reporting and Recommendations to the Company and the Client about the Project
27 December 2000 – 26 December 2003 Maintenance Supervisor
Al-Twaik Est.
National Guard Housing Project
Dammam, K.S.A.
This department consists of:
1. Sewage Treatment Plant
2. Potable Water Distribution (Water Tower)
3. Swimming Pool
Have different kinds of
1. Pumps, Motors, and Accessories
2. Control Panels
3. Pipe Works and Fittings
My work was to;
1. Prepare and execute Preventive Maintenance Scheduling
2. Do Reporting and Recommendations to the Department Engineer
3. Assigned Working Schemes
4. Supervise the technical personnel in troubleshooting and make a recommendation
17 March 1998 – 26 December 2000 Maintenance Supervisor
Sahara Maintenance Services
Company Limited
National Guard Housing Project
Dammam, K.S.A.
This department consists of:
1. Sewage Treatment Plant
2. Potable Water Distribution (Water Tower)
3. Swimming Pool
Have different kinds of:
1. Pumps, Motors, and Accessories
2. Control Panels
3. Pipe Works and Fittings
My work was to:
1. Prepare and execute Preventive Maintenance Scheduling
2. Do Reporting and Recommendations to the Department Engineer
3. Assigned Working Schemes
4. Supervise the technical personnel in troubleshooting and make a recommendation
15 August 1991 – 15 March 1998 Site Supervisor
Solar Construction and
Maintenance Services Inc.,
Pasay City, Philippines
This entity was engaged in Contracting Building Construction and Building
Maintenance. My work was to:
1. Supervise that the accomplished jobs are within the Work Schedule Accomplishment
2. Forecast, report, and assign working schemes
3. Prepare and execute Preventive Maintenance Scheduling
4. Checked the Purchased Required Materials for the Project
01 June 1990 – 14 August 1991 General Foreman
Enriquez Construction Inc.
Pasong Tamo, Makati
Philippines
This entity was engaged in Contracting Building Construction.
My work was to:
1. Assigned Working Schemes
2. Supervise the Workers
3. Helped Workers do actual work
4. Do Reporting and Recommendation