Post Job Free
Sign in

Project Coordinator Technical Engineer

Location:
Chicago, IL
Posted:
January 27, 2025

Contact this candidate

Resume:

Raymond O’Leary

**** **** ***** ******

Alsip, IL 60803

708-***-****

************@*****.***

***********@*****.***

The opportunity to utilize my field experience and extensive education to a progressive position within a fast-paced dynamic work environment. Relevant

Experience

Local Union # 130 / Technical Engineer

08/2005 - PRESENT, Chicago, IL

-Established control lines and benchmarks necessary for building layout.

-Interpreted prints for foundation, column, and slab edge location.

-Frequently used the “Leica and Sokia Total Stations” and automatic level instruments.

-Managed the “RFI’s” and change orders during construction. Landmark Engineering / Surveyor

05/2003 - 07/2005, Palos Hills, IL

-Performed construction layout within new subdivisions.

-Established property corners, sewer and water main layout, and mass grading.

-Utilized “Trimble” RTK/GPS equipment for location layout. Calculated mortgage surveys using “Sidwell” documents. Orange Crush L.L.C. / Estimator

03/2002 - 01/2003, Hillside, IL

-Calculated cubic yardage and tonnage of material needed for heavy highway construction projects.

-Performed manual and computer generated take-offs using “Trimble 4.0

& 4.1 digitizing software.

-Utilized “Harddollar” estimating software for project bids.

-Determined equipment and crew sizes for maximum production.

-Updated all certificates of insurance per specific job.

-Field measured patchwork for accurate billing.

Education

Local Union # 63 / Ironworker

08/2000 - 03/2002, Chicago, IL

-Fabricated and installed various types of curtain wall systems.

-Interpreted architectural prints and shop drawings for installation.

-Repeatedly used leveling instruments for layout and measurement.

-Installed sub-steel for curtain wall anchorage.

Harmon, Inc. / Project Coordinator / Safety Coordinator 05/1999 - 08/2000, Lombard, IL

-Successfully managed and completed projects.

-Calculated project take-off estimates for material quantity.

-Negotiated pricing and purchased material from vendors.

-Calculated material cut lists for shop fabrication.

-Established cost codes for work performed / maintained budget.

-Projected material delivery to job sites to maintain steady work flow.

-Involved in weekly job progress meetings.

-Conducted weekly safety meetings with shop and field personnel.

-Completed monthly jobsite safety walkthroughs.

Bradley University / B.S. in Construction - Minor in Business Administration

09/1994 - 12/1998, Peoria, IL



Contact this candidate