Post Job Free
Sign in

QA/QC TPI Inspector

Location:
Lubuk Baja, Riau Islands, 29444, Indonesia
Salary:
USD5000/month
Posted:
January 27, 2025

Contact this candidate

Resume:

CURRICULUM VITAE – OCTOBER ****

Faisal Tanjung

E-mail: ************@*****.***

Address: Perumahan Legenda Malaka Block A1 No. 20 RT.01 RW.04 Mobile / Telphone : +62-812********

COMPETENCY :

1)Working proficiency in Microsoft Office ( Ms Word, Excel and Power point ). 2) Understanding and have knowledge in Statistical Process Control ( SPC ), FMEA,SIX SIGMA,Quality Management System( QMS ), QCC, etc. 3) Understanding and have knowledge in Production Planning Inventory Control ( PPIC ) 4) Well versed in modularized block erection for offshore and oil & gas industry. 5) Highly experienced in Power Plant Piping, Refinery Piping And Off Shore Piping. 6) Understanding and have knowledge in Primavera Project Management Enterprise P6 7) Understanding and have knowledge in an OCTG ( Oil Country Tubular Goods ) Manufacturing.

8) Well versed in welding processes such as SMAW, GTAW, GMAW, FCAW and SAW for high tensile strength and high yield strength materials 9) Well versed and have knowledge in Code & Standards such as AWS D1.1, ASME B31.3, ASME Sec IX, API 1104, ASME Sec VIII, ISO 11960 ( API 5CT ), API 5B, XL-System ( API 5L ),API Spec 7, API Spec 6A and API Q1. 10).Well versed and have knowledge in code & Standards such as ASME B30.9-2006, Safety standard for Cableways, Crane Derricks, Hoists, Hooks, Jacks, and Slings. 11).Well versed and have knowledge in code DNV OS-F101, Offshore Standard, Submarine Pipeline system.

12). Knowledge of work related standards and specifications like QCS2014, ISO9001:2015, ASTM, BS, ACI, AASHTO, DIN, JIS etc. 13). Well verse on the Quality Management System (QMS) or Integrated Management System (IMS).

Page ( 1 )

CURRICULUM VITAE – OCTOBER 2024

PERSONAL DETAILS

First Name : Faisal

Last Name : Tanjung

Date of Birth : 19 JULY 1971

Gender : Male

Marital Status : Married

Nationality : Indonesian

Education/ Degree : Graduated from Bung Hatta University, Padang ( West Sumatera ) with a degree in Bachelor of Science in Industrial Engineering. WORK EXPERIENCE :

1.PT. MULTI RANGKA ANDALAS Steel Structure Building & Bridge Fabrication

( 3 September 2019 – 31 December 2023 )

The main job is as Production Manager .

Duties :

1. Plan, organize and control the entire production process in fabrication. Merencanakan, mengatur dan mengontrol seluruh proses produksi di fabrikasi 2. Checking the material requirements needed for the project. Memeriksa kebutuhan material yang di butuhkan untuk proyek 3. Check material requirements and work orders.

Memeriksa kebutuhan material dan perintah kerja

4. Prepare a list of materials to be fabricated as well as a list of goods to be shipped. Meyiapkan daftar bahan yang akan di fabrikasikan serta daftar barang yang di pengiriman

5. Give a report to the General Manager regarding the ongoing work implementation process

Memberikan laporan kepada General Manager mengenai proses pelaksanaan pekerjaan yang sedang berjalan.

6. Leading a team in a steel fabrication workshop with the ability to manage on time with quality work that can be accounted for according to standards. Memimpin tim di workshop fabrikasi baja dengan kemampuan pengelolaan yang tepat waktu dengan kualitas hasil kerja yang dapat dipertanggung- jawabkan sesuai standar.

7. Planning and controlling strategies for the load of each work received so as to achieve product results and controlled targets. Melakukan perencanaan dan strategi kontrol atas beban setiap pekerjaan yang diterima sehingga mencapai hasil produk dan target yang terkendali. 8. Coordinate with the team at the workshop to carry out work planning and adjust work time arrangements.

Berkoordinasi dengan tim yang ada di lokakarya untuk melakukan perencanaan kerja dan menyesuaikan pengaturan waktu kerja. 9. Monitor all ongoing project activities.

Memonitor semua kegiatan proyek yang sedang berjalan. Page ( 2 )

CURRICULUM VITAE – OCTOBER 2024

10. Giving direction about work safety (K3).

Memberikan pengarahan tentang keselamatan kerja (K3). 2.AREA SALES MANAGER PEDE DIGITAL APPLICATION

( 20th October 2018 – 7th March 2019 )

Job description :

Lead and formulate strategies that must be carried out by all Sales team leaders or sales supervisors.

Planning, monitoring, evaluating and following up on the results of reports from the Sales Team Leader or Sales supervisor.

Take responsibility and ensure the achievement of targets by all sales team leaders or sales supervisors.

Provide direction, guidance, motivation and training to all sales team leaders or sales supervisors both daily, monthly, and quarterly work plans in accordance with the strategies formulated

Make a report on the achievement of targets every month and report to the central leadership.

Lead meetings with key customers to ensure strong relationships and eliminate business obstacles, aligning with the company's long-term policy direction

Conduct visits to prospects and existing customers 3.TUV NORD THAILAND

Client name is RELIANCE INDUSTRI LTD INDIA

( 13th October 2014 – 7th August 2018 )

The main job is as Third Party Inspector .

Supplier name is PT.Hanjung Bandar Lampung Indonesia, Jl. Raya Soekarno Hatta Km. 11.5 Srengsem Panjang Bandar Lampung Indonesia.

Duties of Responsible :

The scope of work activities as general are as follow :

- To review, monitor, expedite and control structural fabrication stage wise process and delivery schedule.

- To review, monitor, expedite and control raw material delivery schedule.

- To review Plan V/s Actual on daily basis for Material, manpower, Productivity, Process Flow & Quality.

- To Communicate with Vendors Team, Logistics, RIL-Project & RIL- Jamnagar on daily basis.

- Identify problems and cause of problem in above process and report to RIL on daily basis.

- Forecast problem and inform RIL-Projects immediately.

- Shop floor supervision 80% and planning and reporting office work 20%.

- Verify IRN before dispatch. Verify dispatch documents, Packing List.

- Supervise packing procedure and verify packing and loading is done according to RIL process.

Page ( 3 )

CURRICULUM VITAE – OCTOBER 2024

- Monitor the trailers movement in transit.

The scope of work detail specific to Inspection and Test Plan : Pre Fabrication Activities :

1. Check availability of latest drawing, project specification. 2. Verification of the raw material for : Grade/Mat Code, dimensional verification, check physical condition Free from damage, pits, cracks etc.

3. Corelation between raw material and TC

4. Verification of Welding Consumable

5. Verification of condition of backing oven

6. Verification of condition of gas, accessories, etc ( as applicable ). 7. Check & ensure the availability of applicable WPS 8. Witnessing welder/welding operator Qualification and Certification and qualification NDE Persons.

During Fabrication Activities :

1. Marking, Cutting, and drilling check number and size of holes against drawing. 2. Check baking and holding of low hydrogen electrodes ( if supplied in vacuum packed condition with no damage, re-baking is not required. However for low hydrogen electrodes in SMAW process, holding at 100 – 150 deg. C is a must. 3. Check Qualified Welder / Welding operator is being deployed on job. 4. Check whether correct WPS is being used

5. Material, Dimensional verification and fit up check prior to welding 6. Check Preheat ( if any ) and welding including back chip for groove joints. 7. Welding of fire proofing nuts as applicable

8. Verify de- burring of holes, dressing of sharp edges, straightness, welding of fire proof nuts & material surface defects if any

9. Check Identification marking of all fabricated structural for ( a ) Drawing Number, (b) Mark Number and (c ) SI. No if component is identical ( d ) Weight in KG. 10. Distortion Check after fabrication, rectification ( as necessary) and clearance . 11. 100 % visual inspection of welds and checking identification marking including drawing number, mark number, and SI number.

12. Check % NDE requirement for structural and select joint / mark number for NDE & type of NDE.

13. Carry out relevant NDT on selected butt/ fillet welds ( UT/RT/PT/MT ) as applicable. 14. Check Torque of high strength bolts ( as applicable ) 15. Final dimensional and assembly checks ( as applicable ) Page ( 4 )

CURRICULUM VITAE – OCTOBER 2024

16. Painting Inspection : Inspection blasting, Inspection primer painting, inspection intermediate, inspection top coat and etc

After Fabrication :

1. Check and ensure that all fabrication inspection records are complete and compiled. 2. Issue of Inspection Release Note stage of inspection – final By TPIA 3. Check material packing and shipment

4. TUBOSCOPE NOV

( 28th July 2014 – 10th October 2014 )

a. The Main Job is as QA Surveillance Auditor ( Supplier Assessment Audit ) . Client name is HCML HUSKY-CN00C MADURA LIMITED.

Duties or Responsible :

The scope of work activities are as follow :

- Check of the quality system of supplier.

- Check of working condition and manufacturing capability.

- Check of equipment in production & testing

- Check of material and product control

- Check of shop inspection & records

- Check of testing operators qualification

- Accreditation of manufacturing

Supplier’s name is Nippon Steel & Sumitomo Metal Corporation ( NSSMC ) Location: Amagasaki Works 1, Nishino-Cho, Higashi-Mukojima, Amagasaki, Hyogo 660-0856,Japan Tel: +81-6-6411-7637 Fax: +81-6-6411-7752

b. As Third Party Inspector,

Client name is DNO.

The scope of work activities are

- Visual body inspection

- Visual thread inspection

- API full length drift

- Tally Length

- UT Wall thickness spot check

- Internal cleaning ( ID ratting ) and External Cleaning ( Buffing OD ) to remove rust & pitting.

- Clear & re-dope thread with fresh storage compound

- Internal coating ( ID Oiling ) and External Coating with EON 408

- Re-stenciled and color code.

Supplier’s name is PT. Hunting Energy Asia

Location: Complex Dragon Industrial Park, Block D, Jl.Pattimura Kabil Batam Island Indonesia Page ( 5 )

CURRICULUM VITAE – OCTOBER 2024

5.PT. BUREAU VERITAS INDONESIA

( 8 November 2013 – 17 June 2014 )

As Freelance Inspector, on Bureau Veritas Indonesia. a. The Main Job is as QA Surveillance ( Third Party Inspection ). Job site Location : PT.TPCO Pan Asia Batam

Client name is Chevron Thailand Exploration and Production,Ltd. Project Name is “Seamless Steel Pipe of Grade P110 Threaded and Couple With TP-CQ Premium Connection Size : Casing 7” 29PPF R3 P110 TP-CQ PSL-1 Special Drift 6.125 in” On PT. TPCO Pan Asia Batam Responsibilities included :

Assignment for Project “Seamless Steel Pipe of Grade P110 Threaded and Couple With TP-CQ Premium Connection Size : Casing 7” 29PPF R3 P110 TP-CQ PSL-1 Special Drift 6.125 in” Duties or Responsible :

Witness and conducted Inspection all of equipment and tools testing base of Specification Std, Quality plan. Review Quality record, COC, Tally and documents supporting for inspection and prepared the release note documents of result inspection. Prepare and Issued inspections to Lead Auditor and submitted to Customer.

b. As Client Representative / Certified Inspector

Client name is Saipem and Project name is Ruby Field – Saipem. Job site location : PT. Rigspec Perkasa Sekupang, Batam Duties or Responsible :

Visual Inspection and Witnessed Load Test & Witnessed MPI After Load Test On All Welds Lifting Point.

c. As Client Representative / Certified Inspector . Client name is Synco Synergy and Project name is Proseru Job site Location : PT. Synco Syneergy Sekupang- Batam. Subject of Inspection : One Welded Carbon Steel Plate test sample, marked : PQR No.PQR-ASME –SYNCO-23, Welding process: SMAW+SAW

( AfterPWHT),position: 3G(Uphill)+1G(Flat )

Duties or Responsible :

Visual Inspection and Witnessed Mechanical Test : Tension Test, Hardness test, Bend test and Charpy Inpact Test .

Page ( 6 )

CURRICULUM VITAE – OCTOBER 2024

6.PT. H-TECH OILFIELD EQUIPMENT BATAM

( 23 July 2012 – 5 October 2013 )

The main job is as Plant Manager .

Duties :

a. Responsible for the operational management of all production activities throughout the H- Tech organization. Organize all departments and liaise with critical suppliers and to ensure continuous operational management of the production activities. b. Shall assist/ direct all managers and supervisors, as needed, to source required resources ad correct processing difficulties to ensure production and quality goals are attained. c. Shall assist the VP manufacturing in implementing company policy and goals established by the President Director and Board of Director.

d. Responsible to ensure the quality system under the quality manager is understood, implemented and maintained throughout the organization. e. Responsible under guidance of the VP manufacturing, as a minimum complaint with local regulation, to ensure an HS&E program is implemented, understood and maintained throughout the H- Tech organization.

f. Expected to demonstrate, to employs, throughout example, his high commitment to the quality, health, safety and environmental standards established by the President Director and implemented by the VP Manufacturing.

g. Responsible for implementation of development programs established by the VP Manufacturing.

h. Assist VP Manufacturing in developing budgets, quotations for manufacturing and setting objectives for growth of facility in alignment with corporate goals, i. Be able to effectively fill in for VP manufacturing during periods of absence ( vacation, business, illness ).

j. Various duties as required by the President Director and VP manufacturing. 7. SWIBER OFFSHORE CONSTRUCTION LIMITED Singapore,

( 18 May 2012 – 18 July 2012 )

The Main Job is as QA/QC Pipeline project ( Offshore & Onshore ) Client name is Pearl Oil - Indonesia & Zawtika – Thailand. Project name is Ruby Field ( Pearl Oil ) and Zawtika Development Project Phase 1A. Responsibilities included :

Inspection The Roundness of pipe ( to make sure there are some of pipe ovality )

Inspection of weldements in Pipelines

Inspection of coatings

Inspection of High density Polyurethane Foam coatings

Inspection of weldments in Jacket Installation & Boat landing Installation

Holiday detection of field joints

Witnessing Non-Destructive tests

Page ( 7 )

CURRICULUM VITAE – OCTOBER 2024

Coordinating NDT Inspections

Inspection reports preparation as per code and inspection plan

Witness the Leak test of floating Hose String at the Jetty before transportation to the Calm Buoy location

Witness Hydro testing of the Submarine Hose String. 8. PT.Citra Tubindo Engineering Batam – Indonesian

( 1 April 2012 – 16 May 2012 )

The Main Job is as Freelance QC Welding Inspector. Client name is Techlam. Project name is Leg Mating Units ( LMU ARKUTUN-DAGISAKHALIN ) Project Number is A045.

Responsibilities included :

Performs the all kind of site inspection and follow up activities of the welding each of joint and fabrication activity base on Welding Procedure Specification ( WPS ) approval by Client, whether the scope related Material Properties – Base metal ( Material specification range, Filler Metal ), fit –up, welding parameter check up, position of welding progression, PWHT, Preheat & Inter pass temperature, techniques & electrical characteristics and acceptance criteria.

Performs and request NDT inspection for some of joint as per Client requirement and disposition. 9. PT. QUALITY ENGINEERING SERVICE ( PT. QES ),

Project Location Assignment on :

A. PT.Telaga Mas Mulia Jl.Pattimura 207 Telaga Punggur Batam –Indonesian

( Starting on 28 January 2011 )

The Project name is Mobil Cepu LTD . Subject name is Pipe Rotation, Storage and Rebeveling with The job of scope as Inspection for SAW and ERW Line Pipe 20” x 0.500” WT Grade X-60 Bevel End.

The last position as a QC Inspector untill now 2011 years. Daily particularly job is do sampling measurement some part of pipe dimension such as bevel angle,pipe ID, Pipe OD, Root Face, Wall side of pipe and Length of pipe and 100 % check by visual bevel end, OD and ID Condition, etc.

B. PT.PTSC Supply Base – Vung Tau - Vietnam( Beginning of February – 16 June 2011 ) The Main Job is as QA Surveillance ( Third Party Inspection ). Client name is BHP Billiton. The BHP Billiton’s Project name is PYR DEVELPOMENT and Well Name is Offshore Resolute, HO VANG, Block 29 International and Bao Dom May.

Responsibilities included :

Assignment for Project Hon Vang and Bao Dom May in Vietnam Vung Tau, for BHP Biliton Company Vietnam.

Witness and conducted Inspection all of equipment and tools testing base of Specification Std, Quality plan.

Review Quality record, COC, Tally and documents supporting for inspection and prepared the release note documents of result inspection.

Page ( 8 )

CURRICULUM VITAE – OCTOBER 2024

Prepare and Issued inspections to Lead Auditor and submitted to Customer. Some of Job Description during progressing such as 1. 91/2” DC and Handling Tools.

2. MUD logging Unit

3. X-Over & Slings

4. 20” & 30” swage

5. 13-3/8” P110 72ppf BTC R3 Box X Pin Casing

6. ROV

7. 9-5/8” Casing 47# L80 Vam Top

8. Make up of 20”pup Jts to hangar

9. 8-1/4” Drilling Jar

10. 36” Hole Opener

11. Well Heads and Christmas Tree

12. Manifold and Valve Assembly

13. Etc or Some of job description.

C. Schlumberger - 7 Benoi Crescent Singapore ( Starting on 26-June-2011 – 18-July- 2011 )

The Main Job is as QA Surveillance ( Third Party Inspection ). Client name is BHP Billiton. The BHP Billiton’s Project name is TRINIDAD and Well Name is Canteen ( International ) Responsibilities included :

Assigned at Sclumberger in the capacity as Client Authorized Representative ( CAR ). Performed Quality Audits to verify conformance to scope of work, PO’s,Schlumberger- Singapore drawing and Specifications, Codes and Manufacturer’s Data Sheet. Reviewed and approved contractor submittals on quality plan and all relevant and critical procedures contractually required by the project engineering. Reviewed, verifies, and approves NDT ( RT, UT,MT and PT ) results and requerement levels based on the project approved QC and NDT plans.

Witness and conducted Inspection all of equipment and tools testing base of Specification Std, Quality plan.

Review Quality record, COC, Tally and documents supporting for inspection and prepared the release note documents of result inspection.

Prepare and Issued inspections to Lead Auditor and submitted to Customer. Some of Job Description during progressing such as : 1. Mandrel, : Gas Lift, 4-1/2 MMG, 410 SS

Witnessed Tack Weld Oval Grind, Fit & Tack

Witnessed OD Drift & MPI

Witnessed Hydrotesting and Review NDE

Final document review, all required docs are in order and endorsed.

NDE operator qualification and NDE equipment calibration records, Welder Qualification and Welding equipment calibration records. 100% MPI Post Threading process as per NDE-22

Hydro and Drift testing to be perform in accordance with drawing requirement. Hydrostatic Test shall comply with BHPB requirements of zero pressure drop after stabilization.

All procedures listed available in Bartlesville for BHPB or BHPB TPI to review. D. PT.Telaga Mas Mulia Jl.Pattimura 207 Telaga Punggur Batam –Indonesian

( 19 November 2011 – 26 January 2012 )

Page ( 9 )

CURRICULUM VITAE – OCTOBER 2024

The Main Job is as QA Surveillance ( Third Party Inspection ). Client name is Origin Energy Resources Limited. Project name is Otway Exploration Wells 9.625. Project Number is 6630 – 05 – 0009. Purchase Order Number is MITO-CPO-4224. Some of Job Description during progressing such as : 1. CASING, 9 5/8” 47 PPF L80 JFEBEAR R3

Review and Witnessed some of Threading Process starting on verify quantity,identification and traceability marking, visual and overlay inspection, dimensional and visual on sawing coupling, Thread Gauging, make up on buck on machine and End drift, verify length of pipe, stencil marking and verify identification and traceability records, Final Inspection and review Final document report as such Mill Certificate, Telly Report, Certificate of Conformance ( COC ) and Shipping document/ Packing List.

Witnessed OD Drift & MPI

Witnessed Phosphating Coupling

Final document review, all required docs are in order and endorsed. Responsibilities included :

Assignment for Project Otway Exploration Wells 9.625 TMM in PT.Telaga Mas Mulia, for PPIT Company Singapore.

Witness and conducted Inspection all of equipment and tools testing base of Specification Std, Quality plan.

Review Quality record, COC, Tally and documents supporting for inspection and prepared the release note documents of result inspection.

Prepare and Issued inspections to Lead Auditor and submitted to Project Coordinator and Customer.

E. PT.Telaga Mas Mulia Jl.Pattimura 207 Telaga Punggur Batam –Indonesian

( 21 February 2012 – 31 March 2012 )

The Main Job is as QA Surveillance ( Third Party Inspection ). Client name is BHP Pakistan. Project name is ZAMZAMA, TBD.

Project Number is 7176-0937-05-3115. Purchase Order Number is 450******* Some of Job Description during progressing such as : 2. CASING, 9 5/8” 53.50 PPF L80 JFEBEAR R3

Review and Witnessed some of Threading Process starting on verify quantity,identification and traceability marking, visual and overlay inspection, dimensional and visual on sawing coupling, Thread Gauging, make up on buck on machine and End drift, verify length of pipe, stencil marking and verify identification and traceability records, Final Inspection and review Final document report as such Mill Certificate, Telly Report, Certificate of Conformance ( COC ) and Shipping document/ Packing List.

Witnessed OD Drift & MPI on Coupling and Special Area on Casing

Witnessed Phosphating Coupling

Final document review, all required docs are in order and endorsed. Responsibilities included :

Assignment for Project Zamzama in PT.Telaga Mas Mulia. Witness and conducted Inspection all of equipment and tools testing base of Specification Std, Quality plan.

Review Quality record, COC, Tally and documents supporting for inspection and prepared the release note documents of result inspection.

Prepare and Issued inspections to Lead Auditor and submitted to Project Coordinator and Customer.

Page ( 10 )

CURRICULUM VITAE – OCTOBER 2024

10. PT.RACER TECHNOLOGY BATAM

As Senior Production Supervisor, Final Assembly FITBIT-MEDELA & HAKKO project model.

( 25 October 2010 – 24 January 2011 ).

Responsibilities / Authorities :

Involve in line set-up, Planning and others activities.

Supervise a group of Supervisor, Leader, operator to achieve company goals & objective.

Establish production set-up, discipline and control

Ensure quality procedure are implemented.

Drive ISO Standard document and implementation.

Control of direct and indirect material consumption, scrap, attrition and inventory.

Ensure that customer’s customer’s requirement are meet in terms of timely delivery and quality standard.

Conduct and Work closely with process and quality engineer on evaluation and trial on new process, equipment, jigs and fixture to ensure conformance to specification.

Review Production schedule against material inventory to ensure right resources are in stock and prevent excessive buffer stock in the line.

Control and monitor quality cost measure to reduce scrap / reject .

To councell and guide employee in respect of work and work related problem affecting their performance and escalate to higher level if deemed necessary.

To perform any others duties as and when required by Management. 11. PT.Panasonics Shikoku Electronic Company Batam ( PSECB ), Muka Kuning – Batamindo Industrial Park, as Senior Production Supervisor and Senior Material Control Supervisor ( 4 November 2002 – 9 April 2010 ). The Job Description is

1. Active to guide a team leader to achieve production target ( Output and shipment control ). 2. Daily Inventory control material available on production consumption. 3. Preventive production line down ( due to material shortage or not enough ). 4. Do regular time to minimize monthly material discrepancies 5. Making Physical Inventory Monthly reporting.

Page ( 11 )

CURRICULUM VITAE – OCTOBER 2024

6. Making Schedule of Improvement Activity to supports all production needed whether related to time and motion study, machine capacity - efficiency, and manpower arrangement.

7. Daily and monthly Man hours performance control. 8. Active to improve and control production expenses ( indirect material) consumption. 9. To minimized material disposal as daily and monthly updated. 10. Together / support Purchasing making smooth negotiation with supplier to manage supplier’s material in under control by cost conscious, material quality and delivery performance ( refers to delivery schedule commitment between both of company ). 12. PT.Giken Precision Indonesia, MESA Assembly Department, Batu Ampar, as Production Supervisor ( On July 21, 1999 until August 22, 2002 ). The Job Description is

Active to guide a team leader to achieve production target ( Output and shipment control ).

Daily Inventory control material available on production consumption.

Preventive production line down ( due to material shortage or not enough ).

Do regular time to minimize monthly material discrepancies

Making Physical Inventory Monthly reporting.

Making Schedule of Improvement Activity to supports all production needed whether related to time and motion study, machine capacity - efficiency, and manpower arrangement.

Daily and monthly Man hours performance control. Page ( 12 )

CURRICULUM VITAE – OCTOBER 2024

PROFESSIONAL QUALIFICATION :

DECLARATION:

I hereby declare that the above details are true to the best of my knowledge. Hopefully, this application letter would be available for you and I do thank very much for your kind of help.

Page ( 13 )

QUALIFICATION CERTIFICATES

Qualification certificates field concern internal qualifications, external certifications & client approval

Qualification Descripti

on

Certifying

Authority &

country

Issue date - Expiration date

Certificate No.

WIS5/YOG/12/04/062

CSWIP

Welding

Inspector

TWI Ltd 06 April 2015

Certificate

No.026/WI-XV/IWS-B4T

Welding

Inspector

Indonesian

Welding Society

Batam

15 January 2012

Certificate No.LPT-

2/XV/IWS-NDE/2007

NDT ( LPT )

ASNT Level II IWS-Batam 11 June 2010

Certificate

No.MPT-2/XV/IWS-

NDE/2007

NDT ( MPT )

ASNT Level II IWS-Batam 11 June 2010

Certificate

No.OTI.PP-X.0410.020

Piping Process

Engineering

ASME B31.3

Offshore

Technology

Institute

26 March 2015

Certificate

No.6201876220010712

Basic Safety

Training STIP Jakarta -

Certificate

No.289/C/Tr-

Primavera/BTM-

07/2010

Primavera

Project

Management

Ent.P6

OIL Institute

Batam -

Certificate

No.791/UT/N/13

NDT ( UT )

ASNT Level II

Multi Spec

Sinergindo May 19, 2018

Certificate

No.430/RI/N/13

NDT ( RT )

ASNT Level II

Multi Spec

Sinergindo July 16, 2018



Contact this candidate