Steve Barron
*** **** ***** ****, ************, TN 38017
*****.*******@*******.***
PH: 901-***-****
Professional Summary
Dedicated Superintendent with [8] years of experience education and leadership in the Field
Skills
Business Strategy Estimating
MPE
Safety and compliance `Contractor oversight
New construction and renovation Inventory management
Policy development
Education
University of Memphis
Business Administration/Finance
Staff management Recruitment and hiring Contract Compliance Team Leadership
Building codes knowledge
OSHA 30 certification
Work History
Williams Construction
2024 Tam Restaurant
Superintendent
We managed the sub-contractors and suppliers.
I kept the site clean and performed final cleanup. Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency.
We completed the project within the schedule.
Goodwin Brothers Maintenance & construction
2017 Doc’s Wine and Spirits Estimator, Project Manager and Superintendent
A woman’s clothing store renovated into the Doc’s Wine & Spirits
Ensured onsite safety and followed all OSHA regulations by doing my rounds interacting with workers and subs.
I cut the bloking and installed it.
We managed the sub-contractors and suppliers.
I kept the site clean and performed final cleanup. Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency.
We completed the project within the schedule.
C & M Builders’
2018 Gateway Tire Store - Collierville TN I took over as project Superintendent when the client removed our superintendent.
I kept the site clean.
Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency
Ensured onsite safety and followed all OSHA regulations by Doing my rounds interacting with workers and subs.
We completed the project within the schedule.
2019 Loves Travel center –tire storage addition, metal building addition for tire storage and renovation to the existing Loves store
I kept the site clean.
Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency
Ensured onsite safety and followed all OSHA regulations by Doing my rounds interacting with workers and subs.
I installed the tire rack.
Hang doors, and drill and install door hardware including the exterior door security device
I installed the toilet accessories
I completed the project within the schedule.
Steve Barron
834 Deep Woods Road, Collierville, TN 38017
*****.*******@*******.***
PH: 901-***-****
2019 Loves Travel center –tire storage addition, metal building addition for tire storage and renovation and addition renovation and addition to the truck repair shop. In Toomsuba MS
I kept the site clean and final cleanup.
I installed the tire rack
Hang doors, and drill and install door hardware including the exterior door security device
Installed blocking and installed the toilet accessories
We managed the sub-contractors and suppliers.
Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency.
We completed the project within the schedule.
2020 Loves Store in Tupelo MS addition a 756 square foot addition to the existing store and misc. renovation to the store Plans added 2 showers and 1 washer and dryer room and a new counter top for the Subway inside the store
I ordered the brick to match the existing building,
The building had a structural deck with a TPO roof, attached to the existing roof.
I installed door and hardware and door security device and I cut the blocking and installed it.
I used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners, and framing connectors effectively.
We managed the sub-contractors and suppliers. I kept the site clean and performed final cleanup.
Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency.
We completed the project within the schedule.
2021 Circle K Store Baton Rouge La
The Slab was installed when I got there, complete store, fuel tanks installed, and fuel pumps installed concrete and asphalt paving
Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency.
We completed the project within the scheduled time.
‘Total interior demolition to International Paper office in Memphis. Took a complete structure to the dumpster.
Ensured onsite safety and followed all OSHA regulations
I worked with the guys in the demo. I used a small front-end loader to demo the structure with the guys.
Image 21
2021 5th floor renovation UT/Methodist Hospital
Complete demolition and renovation of the 5th floor, the rooms remained
I worked with the subs and suppliers. I helped with the demolition crew to take down the structure.
Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency
The project was completed within the scheduled time
Assistentendent Superintendent Multi family apartments
OAC Construction
NACFAC Memphis Naval Services
Superintendent Jube 2024 to December 2024
B751 Expansion Joints
QCQ Certification
Safety Certification