CURRICULUM VITAE Md. Ferozer Rahman

Civil Engineer

Mob: +880********** WhatsApp / +880**********)

E-mail: ********@*****.*** &

PERSONAL DETAILS Name : Md. Ferozer Rahman

Fathers Name : Md. Hasan Ali

Date of Birth : 16th July 1975

Present Address : Md. Ferozer Rahman Uttora

– Dhaka 1230 – Bangladesh.

********@*****.***

Permanent Address : Md. Ferozer Rahman

Tonona Villa

House 61, Road 3, Block B, Word 3,

Vill - Nishad Nagor,

Dhour – Thana : Turag, Dhaka - 1230

Country: Bangladesh, Asia.

Nationality : Bangladeshi (by birth)

Religion : Islam (Sunni)

Marital Status : Married

Height & Weight : 1.74 meters / 75 KGs (Non Smoker) Passport No. : BT 05280327

Contact Phone : Mob :+880**********/Home+880********** Profile:

I have 28.00 Years working experience as a Chief Surveyor / Quantity Surveyor, Marine Surveyor, Civil Engineering works & Auto CAD engineering works with management skill. I have fully completed several kinds of construction projects, which Include Airport Construction, Sea Port construction, Breakwater, Outfall (WET) Pipe line placing & Dredging works, Stadium, Shipyard, Bridges / Culverts and River Bank Protection construction Projects. Design works: Designing and Revise drawing and make final working drawing as per site condition for the project. Civil design works for Airport / Factory and Others. Making all kind of survey report, which include Project Quantity calculation sheet with report, As-built survey report, In- survey / out survey report, Topographic survey report, proposal survey report & etc. I Possess great ability and skills to solve problem and making quick decision on site in case of any construction problem arise such as levels, alignment and design issues. Install + Repairing & Calibrations of all kind of total station / levels instrument and RTK GPS system on Excavator, Survey vessels, Base station, crawler Crane, Barge & Backpack survey system.

I can operate independently any kinds of Total station, RTK GPS, system on Excavator, Crane, Survey boat (Multibeam sonar system/Dual beam or Single beam Echo sounder system) & Barge RTK GPS system. Input project design profile into the Excavator, Crane, Survey vessel & Barge computer system for alignment & levels on accordance to the project design drawings. I also possess skills and Ability to carry out independently Hydro-graphic, Topographic, all kinds of Setting out, pile drive & all kind of survey report. I can operate independently several kinds of Hydrographic / Land survey & Engineering software, Such as PDS2000 data Acquisition (Multibeam & Singlebeam) & Processing, Hydropro (data Acquisition & Processing). Terramodel 10.6, SDR mapping & Road design, AutoCAD Civil 3D, AutoCAD, Structure design software StaadPro & etc. I can install and operate very well all kind of Hydrographic & Land survey equipment such as all kind of RTK system, Total station & Level instrument. I have 28.0 years of Computer working experience in various programs software, such as difference kind of Engineering & Surveying software’s, Networks, as well as in computer hardware & etc.

Educational Qualification:

Educational

Qualification Name of Examination Year Board/ University Class Diploma in-civil Engineering 1994 BTEB, Dhaka. First class Diploma in Computer Science 1999 Bogra (NTRAMS) A+ Secondary School Certificate 1991

Jessore Board,

Jessore Second

Language Literacy : English & Bengali: Reading, Writing, Listening & Speaking Fluently. Total Experiences: 29 Years

Skills : * Chief surveyor (Hydrographic / Land)

• Senior Estimator or Quantity Surveyor

• Senior surveyor / Survey Engineer or Survey designer & etc.

• Auto CAD Engineer

• Site Engineer

• Construction Manager Driving small vehicle like as Pickup / Car & etc Extra Curriculum Activities:

Computer Software & Hardware * Software: * Auto CAD * STAAD.Pro Structure Design software,

* Road design Software: 1) AutoCAD Civil 3D

2) SDRMapping and Road Design

● Hydrographic and Land survey for data Acquisition and Processing Software: PDS-2000 (Crane + Excavator

& Survey vessels) ● Hydro-Pro ● Hydro-6 & Hydrobat

(Multibeam sonar system) * Terramodel-10.6 Liscad

* Others software:

● Microsoft Excel, Word, Access, PowerPoint,

Publisher, ● Adobe Premiere ● Adobe Photo-Shop ●

Maxtoll Toll system ● 3ds Max ● Internet browsing, E-mail & etc.

Computer Hardware & Network: ● Trouble shooting ● Computer Assembly ● Networking ● Software Installation ● Repair

Survey Instrument Used: RTK GPS system, use in performing Hydrographic survey

& Land Survey. Reference (Base) station setting for the Project, RTK land survey (Backpack) Several kind of Echo sounders such as Odam, Navisound, & Reson Hydrobar,

(Multibeam sonar system), W/ Data recorder SDR33 / Psion & Trimble TSC2 & 3 for Setting out & collection of the Topographic survey data. Different kinds of Automatic Level Instruments. Please Note that I can operate / Repair all kind of survey equipment Total station, GPS, DGPS, and RTK System

& level instrument

Experience Details:

I. Organization

Project:

Position :

Duration :

Responsibilities :

: BBN Limited TZA

: EACOP-Tanga Jetty Project (East African Grude Oil pieline Project)

Senior Marine Surveyor

From April 2024 To Till date

I am responsible for the project Shallow-water site Area Pile diving, Crosshead installation-Testle installation- Truss installation- Pipe line placing responsible for the project shallow water area all survey works activities. Making survey report-attendance daily meeting, control site surveyor and etc.

Making all kind of survey reports such as daily, weekly, Monthly progress report, Volume calculation report for the project and all these are submitted to the engineer and consultant for review, approval of Subcontractor billing purpose.

ia. Organization

Project :

Duration :

Position :

Responsibilities

:

: McDonald Steel Building Products Limited. Shanta Western Tower (Level 11) 186, Bir

Uttam Mir Shawkat Ali Sarak, Tejgaon Industrial Area Dhaka-1208

: Dhaka Airport – Terminal 3 – Export and Import cargo Complex and (DMRT) Dhaka metro rail Project From

November 2019 to March 2024

Chief Surveyor (Survey Manager)

I am head of the Survey departments and control survey Works and site design works in the project. I am Responsible for: - Attending daily & weekly meeting.

All kinds of survey data processing & make design

drawings, quantity calculations, Cross section, Contour plan, Volume calculation, Setting-out, Settlement Monitoring chart and etc.

Using survey Instrument: -

i) Trimble RTK system

1” accuracy Leica Total station and levels instrument & Laser System, use for align and levels works for the project.

ii. Organization

Project :

Duration :

Position :

Responsibilities:

: Bam international (Tanzania – Dar Es Salaam Branch: office

: Julius Nyerere International Airport Terminal 3 Project. From 12 November 2013 to Nov. 2019.

Chief Surveyor

I am head of the Survey departments and control all the site Surveyor and Survey works and site design works in the project.

I am Responsible for: -

* Attending daily & weekly meeting.

* Making all kinds of survey reports such as daily, weekly, monthly progress report, Volume calculation report and all these report are submitted to the engineer and consultant for review, approval of Subcontractor billing purpose.

* Calculation of all kind of subcontractor

Earthworks and Layers works (Sub base, Base course, CTBC, Asphalt ETC), volume and theses report submit to the Consultant and QS section for billing purpose.

* Control and review all sub-contractor volume

certificate report, such as earthworks, Layers works volume, after that make final report and Submit to the engineering manager and consultant for payment purpose.

* Revised external works design drawing as per site condition and make final working drawing and the drawing submit to the consultant for approval.

* Make design Survey setting out, Co-ordinate &

Levels setting out sheets and the setting out sheet provide to the field survey and Consultant surveyor for site works purpose and approval.

* All kinds of survey data processing & make design drawings, quantity calculations, Cross section, Contour plan, Volume calculation, Setting-out, Settlement

Monitoring chart and etc.

Using survey Instrument: -

i) RTK DGPS system for Topographic survey and

setting out

ii) Leica and Sokkia levels instrument, total station & Laser System, use to align and levels works for the project iii. Organization

Project

: BAM international bv

: Monrovia container terminal project

Duration :From 1st December 2011 to October 2013.

Position : Chief Surveyor (Marine and Land)

Responsibilities : I was head of the Survey section and control all kinds of of survey works and site Design works in the project, I was responsible for: - * Attending daily, weekly and monthly meeting. * Make project design profile and the design profile data input in to the Excavator, Crawler Cranes, Barge & survey vessel computer for dredging and precast concrete slab and pile alignment purpose. * Daily & weekly Hydrographic joint survey with client for check final level & alignment. * Survey data processing (combine Hydrographic data + Land survey data) after make design template, Layout plan, cross section, Longitudinal section, volume calculation report, Contour plan etc. and make final progress report base on the joint survey data. * Make weekly / Monthly progress & Asbuilt survey report & those report Submit to the client for approval / Information or review. * Settlement monitoring survey daily, weekly and Monthly. * Control pile alignment & cutoff levels during the tubular & Sheet pile drive. * General

supervision of the hardware and software for the project’s RTK DGPS systems on the Crawler Cranes, Survey

Vessels, Excavator & Barge. * Responsibilities for this project included the correct alignment of the works in accordance with the design drawings. Regular checks & Calibration of survey instruments (Land+Hydrographic) such as RTK DGPS system on Crawler Cranes, Long

boom excavator, survey vessels RTK system & Land

survey equipment. Theses calibration data make check list template after submits to the consultant for approval. * Repairing all kind of RTK GPS system problem like as cable broken, sensor damaged or not working properly of project Excavator, Survey vessels, Base station, crawler Crane & Barge RTK GPS system. * Supervising of

Dredging levels, beddings levels, Rock armor placing levels, Pipe placing levels & alignment etc. Using survey Instrument: Hydrographic survey: i) Survey vessel Reson Hydrobat multibeam Sonner system.

Using survey Instrument: Hydrographic

survey:

i) Survey vessel Reson Hydrobat multibeam Soner system: Software PDS2000 for data Acquisition & Processing. ii) Excavator Reson RTK GPS system control program:

PDS2000CGS900. iii) Barge & crawler Crane Reson

PDS2000 RTK GPS control system.

Land survey equipment:

* Sokkia total station & Sokkia levels instrument

* Leica Rugby 280DG laser system & Backpack

iv. Organization : Higgs & Hill (Qatar – Lusail Branch office) Project : CP12 PH-1A Construction of Southern & Central outfall (WET) Lusail city, Qatar. (Marine works)

Duration : From Jan 2011 to November 2011.

Position : Chief Surveyor (Marine + Land)

Responsibilities : I am responsibilities of the project, Survey section controller, Attended daily & weekly meeting. Make design

Profile & design profile data input to the Excavator, Crawler Cranes, Barge & survey vessel computer. Daily

& weekly doing Hydrographic (Data acquisition Duel beam & Multibeam system) joint survey with client for check & final level & alignment. Survey data processing

(combine Hydrographic data + Land survey data) after make design template, Layout plan, cross section,

Longitudinal section, volume calculation, Contour plan & etc. Settlement monitoring survey daily & weekly.

General supervision of the hardware and software for the project’s RTK GPS systems on the Crawler Cranes,

Survey Vessels, Excavator & Barge. Responsibilities for this project included the correct alignment of the works in accordance with the design drawings. Regular checks & Calibration of survey instruments (Land+Hydrographic) & RTK DGPS system of 1 No. Crawler Cranes & long boom excavator, survey vessels & Chiseling Barge RTK system check & calibration daily & weekly basis. Theses

calibration data make check list template after submits to the consultant for approval.

Repairing all kind of RTK GPS system problem like as cable broken, sensor damaged or not working properly of project Excavator, Survey vessels, Base station & crawler Crane RTK GPS system.

Supervising of Excavation levels, Dredging levels, Rock armor backfilling, drain pipe placing, levels, alignment & etc.

Using survey Instrument:

Hydrographic survey:

i) Survey vessel Reson Hydrobat multibeam Soner

system: Software PDS2000 for data Acquisition &

Processing. ii) Survey vessel Trimble Hydropro

Duelbeam system: Software Hydropro for data

Acquisition & Processing & Terramodel 10.6. iii)

Excavator RTK GPS system control program:

CGS900 Grade control system (Design profile

software: Trimble Sitevision office) iv) Barge & Crane RTK GPS control software: Hydropro Land survey

equipment:

* Sokkia total station and Sokkia levels instrument

* RTK GPS system

v. Organization

Project

Duration

Position

Responsibilities

: Bam international (Tanzania – Dar Es Salaam Branch : office

: Rehabilitation of Julius Nyerere International Airport – Tanzania.

From Jan 2009 to January 2011.

Chief Surveyor (Land)

I am responsibilities of the project, Survey section controller. Attended daily & weekly meeting. Design & drafting works all the project works. Make design, Layout plan, Section & etc after that theses document submit to the consultant for approval. Make site

working drawing structural & civil for surveyor & site engineer. Provide all survey setting co-ordinate & etc for the field surveyor. All kind of survey data

processing & make design drawings, quantity

calculations, Cross section, Contour plan, Volume

calculation, Setting-out, Settlement Monitoring chart & etc.

vi. Organization

Project

Duration

Position

Total Cost

Responsibilities

: GRINAKER-LTA / INTERBETON IBHAYI Joint

Venture (Breach office: 70,North End, Eastern Cape, Port Elizabeth – South Africa)

: Nelson Mandela Bay Multi Purpose Stadium.

: From 12th June 2007 to 26th September 2008. :

Site Engineer

: R 1.50 Billion, Capacity = 51000 seats.

: In this project I am responsible for over all construction of Moat & substations works.

Performing the activities as below:

* To prepare work program & submit to the

management

* To attend to the daily meeting

* Quantity calculation for the project.

* Reinforcement, Shuttering and concreting works.

* To write daily report

* To co-ordinate with the consultant, subcontractors, Foremen and senior officers.

To organize all the material request by the foremen * To control over all manpower.

vii.

Organization

Project

Duration

Position

Total Cost

Responsibilities

: INTERBETON BV (Branch office Limbe – Cameroon - Africa) : Limbe Shipyard project

: From 06 June 2005 to 25 May 2007.

: Chief surveyor (Marine + Land) : 100 Milion USD.

: I had worked as a Chief surveyor (Marine & Land) of Interbeton BV Cameroon Branch (a subsidiary of

Royal Bam Group Netherlands) for the design and

construction of the Limbe shipyard and Breakwater

project in Mokundange – Limbe – Camaroon - Africa. I am responsibilities of performing Bathymetric

(Hydrographic) survey, Topographic survey, All survey data processing, combining Hydrographic & topographic survey data into production of bathymetric charts and drawings, quantity calculations, Cross section, Contour plan, Volume calculation, Setting-out, Settlement

Monitoring survey, Reference station setting for the Project

(RTK system) and the general supervision of the hardware and software for the project’s RTK GPS

systems on the Crawler Cranes, Survey boat and

Excavator. Responsibilities for this project included the correct alignment of the works in

accordance with the design drawings, regular checks & Calibration of survey instruments (Land+Hydrographic)

& RTK DGPS system of 2 No’s Crawler Cranes & long

boom excavator.

Calculation of daily/weekly/monthly progress of the works viii. Organization

Project

Duration

Position

Responsibilities

: SIGMA-RCL JV. CO. LTD

: Bhairab Bridge Project (Maintenance & Toll Operation). : From September 2003 to 04 June, 2005.

: Chief Survey (Hydrographic + Land)

: I had worked as a Chief Surveyor of SIGMA-RCL JV at Bhairab Bridge Project Ashugonj, B-Baria - Bangladesh. in various Programs, Such as Hydrographic &

Topographic survey, Settlement Monitoring survey,

Reference station setting for the Project (DGPS system), and all of survey data Processing make Cross Section, Longitudinal section, contour plan, Volume calculation, Layout plan and etc.

Co-ordinate with Consultant & Sub contractors.

Using Software:

For Navigation: Hydro-Pro (Trimble)

For Processing: Hydro-6, Hydro-Pro, SDR Mapping &

Road design, Hydro nav edit & Terramodel-10.13

(Trimble)

ix. Organization

Project

Duration

Position

Total Cost

Responsibilities

: EDMUND NUTTALL (UK) LIMITED

(Branch office Bhairab – Bangladesh– Asia)

: Bangladesh – UK Friendship Bridge

: From 27th June 2000 to 15 September 2003.

: Auto CAD Engineer

: 100 Million USD. (L = 1.5km, W =19m, H = 21m (from water level, Max. pile L = 90m, Water depth= Max. 40m)

: I had worked as an Auto CAD Engineer of Edmund

Nuttall (UK) limited (A Group Company of HBG)

Bangladesh – UK Friendship Bridge Project at Ashugonj site office, B-Baria – Bangladesh - Asia. I am working in this organization in various Programs, Such as temporary facilities work, Office & Camp, layout Plan, Section, Elevation, Reinforcement details etc Designed and

Drafting. Co-ordinate with Consultant & Sub contractors. Main bridge work: Permanent & Temporary works such as

Layout Plan, Section, Elevation, Reinforcement details, Formwork, Survey data processing (Pier, Segment, Pile Cap, Deck Slab, River training works, Road work, Gas Pipe line works etc. Drafting and Design.

Survey works: Bridge, Permanent and Temporary works, survey setting out plans, provides all setting out data (co- ordinate) to field & hydrographic surveyors. Survey data processing and as-built drawing making such as (Pile, River

Training works, Road & etc all survey related works) Hydrographic & Topographic data input to Computer after design, Setting out, Earth work, Volume Calculation and Cross section and other miscellaneous Survey plans & etc. Make As built report (drawing) for all the project Works. (Survey/ Structure / Architecture / MEP and Others) x. Organization

Project

Duration

Position

Responsibilities

: HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD.

: Haripur 365 M/W CCPP Project

: From 21 April 2000 to 26th June 2000

: Survey Engineer / Quantity Surveyor

: I had worked as a Survey Engineer of Haripur 365 M/W CCPP Project at Kuripara, Bander, Narayangonj. I am working in this organization in various Programs, Such as Hydrographic and topographic survey. All survey data processing like input to Computer after design, Setting out, Earth work, Volume Calculation and cross section and Other Miscellaneous Survey plans etc.

Co-ordinate with Consultant & Sub contractors.

Used Software: For Navigation: Hydro6 & Hydropro

For Processing: SDR Mapping,

Auto CAD, CorelDRAW, Ms Excel,

Word, Published, PowerPoint, Project,

Surfer1.6, 3D Home Dos & Windows.

xi. Organization

Project

Duration

Position

Total Cost

Responsibilities

: HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD.

: River Bank Protection Project

: from 02 Oct. 1996 to 20 April 2000

: Survey Engineering / Chief Surveyor

: 100 Million USD

: I had worked as a Survey section Controller of Hyundai Engineering & Construction co. (South Korea) Ltd.

Hyundai-Jan de Nul Joint Venture on the construction of the River Bank Protection Project (Bramaputra right Bank priority works) at Sirajgonj, Bangladesh. I am working in this organization in various Program i.e. Construction Design such as site plan, Permanent and Temporary works drawing, including Revetment design, Country boat & Ferry terminal design, Culvert design, Cross section, Geotextile layout, CC Block layout, Road works,

Architectural, Structural design drawing review, Proposal drawing, Digitized maps diagram, organization chart & plotting etc. Provide support for drawing used and produced by our survey Department, Such as Barometric & Topographic chart, Survey setting out plans Provides all setting out data to the field surveyors, Hydrographic survey (regularly) and Topographic survey.

Hydrographic & Topographic data input to Computer after make design, Setting out, Earthwork, Volume Calculation and cross section and other Miscellaneous Survey plans. As built works (drawing) for that project.

Co-ordinate with Consultant & Sub contractors for all sub control volume certification review and make final volume report for the project and submit the to Engineer and consultant.

using Software: Hydro6 Navigation & Processing, SDR Mapping and road design, Auto CAD, CorelDRAW,

Microsoft Excel, Word, Published, Power-point, Project, 3D Home Dos & Windows.

Working also Computer Hardware and software such as Installation, Repair, Setup, Trouble shooting, Computer Assembly and etc.

Practically know how to use of DGPS (Differential Global Positioning System) Used in performing Hydro Surveys, Reference station setting for the Project, Use of Total Station Sokkia Set 2C & 3C W/ Data recorder SDR33 for collection of Topographic survey data and Different Kind of Automatic Level Instruments.

xii. Organization

Position

Duration

Responsibilities

: DEVELOPMENT DESIGN CONSULTANTS LTD (DDC)

: Auto CAD Engineer

: From Dec. 1994 to Sep. 1996

: I had worked as an Auto CAD Engineer. I had worked in this Organization in various programs i.e. Design and Drafting of Architectural, Structural Drawing,

GIS/Mapping, Proposal Drawing, Digitized of Drawing, Maps, Single Line Diagram, Power Station, Substation Plan, SCADA Drawing, Design of Bridge and etc. Using software: Auto CAD 12 Dos & windows, CorelDRAW,

Microsoft Excel, Word, PowerPoint, Publisher, Dos & Windows & etc.

(Md. Ferozer Rahman)

Date : 11/08/2023



Contact this candidate