Post Job Free
Sign in

A Team Start

Location:
NCR, Philippines
Posted:
March 18, 2025

Contact this candidate

Resume:

*******************@*****.*** 091********/ 096********

Brgy Minahan Sur General Nakar Quezon Mark Anthony Lacaba Arizapa

To be a part of the dynamic organization a challenging position where I can apply my skills and further again more knowledge as well as personal development and contribute in the fulfillment of the company’s goal.

October 2024 up to Present

Prime BMD Company

*First of all is to attend the toolbox meeting for the discussion of area deployment and to cooperate the safety reminders to prevent a safety of every one that work in the job site

*Start a work in 15 minutes housekeeping to avoid an accident in a working job site

*For the installation of column, first is to check the posit and the elevation of the line grid and measure the area to prepare a material like a phenolic that cut base on the measure of the length and the height, alumna beam, Aluma clip nail if the Aluma have a wood filler or concrete nail #2 if the alumna is an all alloy turn buckle for alignment, turn buckle base and turn buckle connector

*Put the phenolic base on the finish of the lay out and use the plum bob for alignment and after the installation of the phenolic put the Aluma with a maximum not more

than 30mm spacing

*After the installation of Aluma put the turn buckle connector to the Aluma and the

turn buckle base in flooring by using an electric drill. And screw gun for screw bolt to fix

*For bottom installation first thing is to find the center line of the beam, the wide and the height base on the drawing of the plan

*If the rebar of beam is complete with approve of a QC inspector put the one side of sidings

*prepared the material that needed for installation like a h-frame and cross brace scaffold or what the company required for bottom sofit installation and Aluma and Aluma clamp and start an installation using by a combination rings #17-19 and using

the plum Bob to make sure that the bottom sofit is exactly to the gridline base on the lay out

*if the rebar for slab is complete fix the sidings with an Aluma welder by using a tie rod and double pipe

*For slab installation, first is to prepare an all material that needed for installation like Aluma, Aluma clamp and phenolic and the circular saw to cut the phenolic for the small filler and for sidings and start a slab installation

*For invaded plate installation first is to know the location of every plate and measure from the grid line and install it by using a steel hook

*For anchor bolt installation first is fabricate the butter board to put the center line for the location of every bolt

July 2019 – September 2024

May 2017 – June 2019

DMCI consuji Company

*first of all is to attend the toolbox meeting for the discussion of area deployment and to cooperate the safety reminders to prevent a safety of every one that work in the job site

*Start a work in 15 minutes housekeeping to avoid an accident in a working job site

*For the installation of column, first is to check the posit and the elevation of the line grid and measure the area to prepare a material like a phenolic that cut base on the measure of the length and the height, alumna beam, Aluma clip nail if the Aluma have a wood filler or concrete nail #2 if the alumna is an all alloy turn buckle for alignment, turn buckle base and turn buckle connector

*Put the phenolic base on the finish of the lay out and use the plum bob for alignment and after the installation of the phenolic put the Aluma with a maximum not more

than 30mm spacing

*After the installation of Aluma put the turn buckle connector to the Aluma and the

turn buckle base in flooring by using an electric drill. And screw gun for screw bolt to fix

*For bottom installation first thing is to find the center line of the beam, the wide and the height base on the drawing of the plan

*If the rebar of beam is complete with approve of a QC inspector put the one side of sidings

*prepared the material that needed for installation like a h-frame and cross brace scaffold or what the company required for bottom sofit installation and Aluma and alma clamped start an installation using by a combination rings #17-19 and using

the plum Bob to make sure that the bottom sofit is exactly to the gridline base on the lay out

*if the rebar for slab is complete fix the sidings with an Aluma welder by using a tie rod and double pipe

*For slab installation, first is to prepare an all material that needed for installation like Aluma, Aluma clamp and phenolic and the circular saw to cut the phenolic for the small filler and for sidings and start a slab installation

*For invaded plate installation first is to know the location of every plate and measure from the grid line and install it by using a steel hook

*For anchor bolt installation first is fabricate the butter board to put the center line for the location of every bolt

DDTki INC. Company

first of all is to attend the toolbox meeting for the discussion of area deployment and to cooperate the safety reminders to prevent a safety of every one that work in the job site

*Start a work in 15 minutes housekeeping to avoid an accident in a working job site

*For the installation of column, first is to check the posit and the elevation of the line grid and measure the area to prepare a material like a phenolic that cut base on the measure of the length and the height, alumna beam, Aluma clip nail if the Aluma have a wood filler or concrete nail #2 if the alumna is an all alloy turn buckle for alignment, turn buckle base and turn buckle connector

*Put the phenolic base on the finish of the lay out and use the plum bob for alignment

and after the installation of the phenolic put the Aluma with a maximum not more than 30mm spacing

*After the installation of Aluma put the turn buckle connector to the Aluma and the

turn buckle base in flooring by using an electric drill. And screw gun for screw bolt to fix

*For bottom installation first thing is to find the center line of the beam, the wide and the height base on the drawing of the plan

*If the rebar of beam is complete with approve of a QC inspector put the one side of sidings

*prepared the material that needed for installation like a h-frame and cross brace scaffold or what the company required for bottom sofit installation and Aluma and Aluma clamp and start an installation using by a combination rings #17-19 and using

the plum Bob to make sure that the bottom sofit is exactly to the gridline base on the lay out

*if the rebar for slab is complete fix the sidings with an Aluma welder by using a tie rod and double pipe

*For slab installation, first is to prepare an all material that needed for installation like Aluma, Aluma clamp and phenolic and the circular saw to cut the phenolic for the small filler and for sidings and start a slab installation

*For invaded plate installation first is to know the location of every plate and measure from the grid line and install it by using a steel hook

*For anchor bolt installation first is fabricate the butter board to put the center line for the location of every bolt

August 2016 – March 2017

PHENIX GARUDA

* first of all is to attend the toolbox meeting for the discussion of area deployment

and to cooperate the safety reminders to prevent a safety of every one that work in

the job site

*Start a work in 15 minutes housekeeping to avoid an accident in a working job

site

*For the installation of column, first is to check the posit and the elevation of the line

grid and measure the area to prepare a material like a phenolic that cut base on the

measure of the length and the height, alumna beam, Aluma clip nail if the Aluma have

a wood filler or concrete nail #2 if the alumna is an all alloy turn buckle for alignment,

turn buckle base and turn buckle connector

*Put the phenolic base on the finish of the lay out and use the plum bob for alignment

and after the installation of the phenolic put the Aluma with a maximum not more

than 30mm spacing

*After the installation of Aluma put the turn buckle connector to the Aluma and the

turn buckle base in flooring by using an electric drill. And screw gun for screw bolt to fix

*For bottom installation first thing is to find the center line of the beam, the wide and the

height base on the drawing of the plan

*If the rebar of beam is complete with approve of a QC inspector put the one side of

sidings

* Prepared the material that needed for installation like a h-frame and cross brace

scaffold or what the company required for bottom sofit installation and Aluma and

alma clamped start an installation using by a combination rings #17-19 and using

the plum Bob to make sure that the bottom sofit is exactly to the gridline base on the lay

out

*If the rebar for slab is complete fix the sidings with an Aluma welder by using a tie rod

and double pipe

* For slab installation, first is to prepare an all material that needed for installation like

Aluma, Aluma clamp and phenolic and the circular saw to cut the phenolic for the small

filler and for sidings and start a slab installation

*For invaded plate installation first is to know the location of every plate and measure

from the grid line and install it by using a steel hook

*For anchor bolt installation first is fabricate the butter board to put the center line for

the location of every bolt

Formwork Carpenter

2008

2013

Minahan sur elementary school

Paaralang Sekundarya Ng Heneral Nakar

Carpenter

Carpenter junior Carpenter junior Junior Carpenter Carpenter junior

Formwork Carpenter

Carpenter

Pilipino & English

Date of Birth : March 19 1997

Marital Status: Married

Nationality : Pilipino

Passport : PO157405B

Gender : Male

Height : 170 cm

Weight : 76 kg

Hammer tape measure Plum bob

Nylon level hose Wood chisel

Hand saw Lebel bar level hose

Try square angle Chalk line

I hereby certify that all information stated above are true and correct.

MARK ANTHONY LACABA ARIZAPA

Applicant



Contact this candidate