Post Job Free
Sign in

Quality Control Estimation Engineer

Location:
Sun City Center, FL
Posted:
March 18, 2025

Contact this candidate

Resume:

Resume /Alaa Alattabi

Work Experience

Hickerson's Catv Inc KC, Missouri

Cable test Sep 2020 to Feb 2023

Install and test communication cables and grid.

Dono communication inc Sarasota, Florida

Cable test March 2023 to Feb 2025

Install and test communication cables and grid.

IGCC Ramallah, Basra

PROJECT Estimation Engineer Nov 2018 to Nov 2019

Lead Estimation Engineer/Scope of Work Engineer

preparing & reviewing Method Statements, Work Specific Quality Control Plans, as per specifications of contract document, analyzing BOQ of tenders and contact suppliers with responsibility, Instrument/electrical works for site survey and overseeing the Oil & Gas Projects with local engineers, Power Plant 6.6kV overhead power lines, and underground lines, Switch gear and Instrument devices’ installations on Tanks. Duties included coordinating with the engineers, BP Client, and BGC (end user) management to achieve laborer hours and budget of Gas & Oil Field Projects. Load study. My estimations were built according to NECA, BS, IEEE, NEC and IEC Standards

Dar Al kenos Baghdad, Iraq

Commissioning Electrical Manager Jun 2017 to April 2018 commissioning & Reliability test

Rehabilitate underground 11 KV of Siemens distribution network at Jamila’s districts, review drawing, test insulation of MV cables, test distribution transformers, and replace the pillars & electrical meters. Improve existing networks by adding new feeders and transformers. Weekly meeting with the staff of the Ministry of Electricity. Increase capacity of load after removing illegal excesses on the electrical network. Provide input to other engineers’ reports, process technical info, quality, time schedule, and budget.

UNION MARINE INTERNATIONAL Baghdad, Iraq

Electrical commissioning engineer September 2014 – May 2017 commissioning & starting up of 3ph Induction Motors Type ABB 480 KW. works were included

1-Installing 27numbers of electrical container type floating pump 3ph, 485 KW and operating them by using soft-starter (ABB) which includes: -

- Setting and programing soft-starters type ABB brand.

-Install electrical panels as well as installing soft-starters boards commissioning & starting-up Auto-Transformers Type ABB 2 MVA. works were included

1-Installing 12 numbers of electrical Kiosk type 3ph, 2 MVA and operating them

- Setting and programing Switch-gear type ABB brand.

-Install and operate electrical pumps

Starting-up of 315 numbers of Diesel Generators Type Cummins. works were included

1- Assembling electrical parts of Cummins' engines which includes:-

-Wiring and installing electrical parts on the engines types QSL9 and QSX15 Wiring of DC alternator, starter motor, relays, clutch system and panels – Setting.

-Fix Diesel Generators on Floating boat for reaching water to far fields that haven't water.

-Operate Unites.

USACE Baghdad, Iraq

Electrical Commissioning Engineer April 2008 – August 2014 Installation of two Gas turbines GE 2x123 MW frames'9: works were included 1-Pre-commissioning, starting-up and reliability test of alternative unite 15 KV, 123 MW, 50 HZ.

- Excitation coil as well as bridge circuit, test of generator insulation, magnetic pickup.

- Synchronize relay as well as matching control circuit.

- 52G Generator Circuit Breaker.

- Insulation of Bus-Duct

2-Pre-commissioning, commissioning, reliability and put in the service Power Transformer 15 KV – 400 KV, 185 MVA, 50 HZ.

- Differential relay.

- Transformer's cooling system.

- Insulation of Transformer.

- Oil Pressure

3-Pre-commissioning, commissioning, reliability and put in the service 6.6 KV switchgear of auxiliary unite.

- Work sequences for C.Bs.

- Relay injectors for C.Bs

- Polarity and Matching for Bus-Tie, Bus-Coupler and Bus-Section.

- Measuring system, Surge arrestor and Capacitors Bank

- Insulation of switchgear.

- installing underground power cables XLPE 3 (1x630 mm2, 400 kv), (1x400 mm2, 6.6 kv),

(4x240mm2, 0.416 kv)

4-Pre-commissioning, commissioning, reliability and put in the service switchyard 400 KV.

- Work sequences for V and T type types of C.Bs.

- CTs Current transformers.

- CVT Capacitive Voltage Transformers

- Polarity and Matching for Bus-Coupler.

- Connection of Cable Sealing Ends.

- Mechanism of Disconnecting Switches.

- Connectivity of Ground System.

5-Pre-commissioning, commissioning, reliability and put in the service Forwarding System 1- Heavy Crude oil treatment.

2- Waste water Treatment

3- Distillate Treatment

4- Row water treatment

5- RO Reverse Osmosis

6- Firefighting

procurement Engineer of providing a GE spare parts Gas turbines GE 2x40 MW LM6000. And procurement of firefighting equipment Installation of 33/11 KV Mobile-substation. works were included 1-Pre-commissioning, starting-up and reliability test 10 MVA Main Transformer.

- Differential relay.

- Transformer's cooling system.

- Insulation of Transformer.

- Oil Pressure

2-Pre-commissioning, commissioning, reliability and put in the service 11 KV switchgear.

- Work sequences for C.Bs.

- Relay injectors for C.Bs

- Polarity and Matching for Bus-Tie, Bus-Coupler and Bus-Section.

- Measuring system, Surge arrestor and Capacitors Bank

- Insulation of switchgear.

- installing underground power cables XLPE 3 (1x630 mm2, 12 kv) and (4x240mm2, 0.416 kv) 3-Pre-commissioning, commissioning, reliability and put in the service Overhead Grid.

- 14 m length towers.

- Tension and Suspension disc insulators.

- Off Load C.Bs

- Lightning Arrestor.

- Surge Arrestor.

- Connectivity of Ground System.

4- Resident Engineer for renew Air Force building and hangers.

- Run new power cables from main distribution panels to sub-main panels.

- Maintain and starting-up diesel Caterpillar's generators up to 1500KVA.

- Install new transmission lines 11/33KV

-Repairing and installing electrical motors, diesel generators, transformers and water pumps of water pools.

-Install new outlets, GFCIs, Hand's dryers, and light fixtures.

-Determined, Locating and diagnosing troubleshooting in the electrical system or equipment such as HVAC, Generators, Motors and control panels

UMI Baghdad, Iraq

Sr. Electrical Commissioning Engineer September 2014 – May 2017

• Pre-commissioning on all electrical equipment, components, and installations.

• Organizing the site work places so as to ensure that work is carried out to the required standard, with minimum risk to persons, equipment and materials and for ensuring that the employees under their responsibility do not engage in unsafe work practices or take unnecessary risks.

• Responsible for over-seeing ordering, maintenance and allocation of all Commissioning Test Equipment to technicians

• Provide prompt response to inquiries whenever there is a breakdown, and resolve the issue as quickly as possible

• Ensure that equipment are in good working order so as to prevent disruption of activities

• Installation of fresh electrical components and fittings

• Recommend replacement for old or faulty electrical components or fittings to the management

• Assist in forecasting requirements, creating a budget and scheduling expenses for the electrical department

• Keep record of all stock and supplies, including company’s electrical equipment

• Working in collaboration with the production team to formulate the best cost-effective manufacturing process

• Perform energy audit and recommend alternative sources of energy

• Help the organization to reduce energy costs

• Ensure that all electrical gadgets and instruments are switched off after close of work daily

• Fix and maintain lighting fixtures and fittings

• Troubleshoot machine breakdowns and provide preventive maintenance services

• Learn new skills and attend training programs in other to increase knowledge of trends and best practices in the industry

• Provide safe working environment for members of staff, and ensure electricity induced accidents and mishaps are prevented.

• Responsible for safety co-ordination, attending safety and progress meeting relating to the Commissioning scope of works.

• To ensure that and all persons within the Electrical team fully comply with all Company & Project HSE requirements.

• Ensure that the electrical commissioning activities are properly organized, scheduled and conducted in a structured and safe manner, to test and certify that the installed equipment/systems, comply with the agreed performance parameters indicated in the design documents and specifications.

• Take steps to prevent fire outbreaks by making appropriate recommendations to management

• Purchase electrical fittings and components or supervise the staff charged with the responsibility

• Provide 24 hours a day maintenance services or assign technical staff to do so

• Supervise electrical works when new projects are undertaken

• Support the company in increasing profitability by managing resources efficiently and making necessary recommendations.

1- Installation of 33/0.416 KV Mobile-substations. works were included

1-Pre-commissioning, starting-up and reliability test 2 MVA Main Transformers.

- Differential relay.

- Transformer's cooling system.

- Insulation of Transformer.

- Oil Pressure

2-Pre-commissioning, commissioning, reliability and put in the service 11 KV switchgears.

- Work sequences for C.Bs.

- Relay injectors for C.Bs

- Polarity and Matching for Bus-Tie, Bus-Coupler and Bus-Section.

- Measuring system, Surge arrestor and Capacitors Bank

- Insulation of switchgear.

3-Pre-commissioning, commissioning, reliability and put in the service Overhead Grids.

- 14 m length towers.

- Tension and Suspension disc insulators.

- Off Load C.Bs

- Lightning Arrestor.

- Surge Arrestor.

- Connectivity of Ground System.

4-Pre-commissioning, commissioning, reliability and put in the Floating Pumps.

- 480 KW ABB Indication Motors.

- Floating Containers.

5- Installing Kiosks (Power Transformers 2 – 3 KVA, 33KV/0.416 kV 50 HZ)

- Work sequences for C.Bs.

- Relay injectors for C.Bs

- Polarity and Matching for Bus-Tie, Bus-Coupler and Bus-Section.

- Measuring system, Surge arrestor and Capacitors Bank

- Insulation of switchgear.

- installing underground power cables XLPE 3 (1x630 mm2, 12 kv) and (4x240mm2, 0.416 kv) Rams Al Hadarah Baghdad, Iraq

Electrical Commissioning Engineer October 2006 – December 2007 1- Installation of eight Gas turbines GE 8 x25 MW frames'5. works were included

1-Pre-commissioning, starting-up and reliability test of alternative unite 11 KV, 25 MW, 50 HZ.

- Excitation coil as well as bridge circuit, test of generator insulation, magnetic pickup.

- Synchronize relay as well as matching control circuit.

- 52G Generator Circuit Breaker.

- Insulation of Bus-Duct

2-Pre-commissioning, commissioning, reliability and put in the service Power Transformer 132 KV, 86 MVA, 50 HZ.

- Differential relay.

- Transformer's cooling system.

- Insulation of Transformer.

- Oil Pressure

3-Pre-commissioning, commissioning, reliability and put in the service 6.6 KV switchgear of auxiliary unite.

- Work sequences for C.Bs.

- Relay injectors for C.Bs

- Polarity and Matching for Bus-Tie, Bus-Coupler and Bus-Section.

- Measuring system, Surge arrestor and Capacitors Bank

- Insulation of switchgear.

4-Pre-commissioning, commissioning, reliability and put in the service switchyard 132 KV.

- Work sequences for V and T type types of C.Bs.

- CTs Current transformers.

- CVT Capacitive Voltage Transformers

- Polarity and Matching for Bus-Coupler.

- Connection of Cable Sealing Ends.

- Mechanism of Disconnecting Switches.

- Connectivity of Ground System.

5-Pre-commissioning, commissioning, reliability and put in the service Forwarding System 7- Heavy Crude oil treatment.

8- Waste water Treatment

9- Distillate Treatment

10- Row water treatment

11- RO Reverse Osmosis

12- Firefighting

Wentera Baghdad, Iraq

Electrical Commissioning Engineer February 2006 – September 2006 1- Repair of two Gas turbines GE 2x40 MW LM6000. works were included

1-Commissioning, starting-up and reliability test of alternative unite 11 KV, 40 MW, 50 HZ.

- Excitation coil as well as bridge circuit, test of generator insulation, magnetic pickup.

- Synchronize relay as well as matching control circuit.

- 52G Generator Circuit Breaker.

- Insulation of Bus-Duct

2-Pre-commissioning, commissioning, reliability and put in the service Power Transformer 11 KV – 400 KV, 110 MVA, 50 HZ.

- Differential relay.

- Transformer's cooling system.

- Insulation of Transformer.

- Oil Pressure

3-Pre-commissioning, commissioning, reliability and put in the service 6.6 KV switchgear of auxiliary unite.

- Work sequences for C.Bs.

- Relay injectors for C.Bs

- Polarity and Matching for Bus-Tie, Bus-Coupler and Bus-Section.

- Measuring system, Surge arrestor and Capacitors Bank

- Insulation of switchgear.

4-Pre-commissioning, commissioning, reliability and put in the service switchyard 400 KV.

- Work sequences for V and T type types of C.Bs.

- CTs Current transformers.

- CVT Capacitive Voltage Transformers

- Polarity and Matching for Bus-Coupler.

- Connection of Cable Sealing Ends.

- Mechanism of Disconnecting Switches.

- Connectivity of Ground System.

EDUCATION

TECHNOLOGY OF UNIVERSITY Baghdad, Iraq

Bachelor of Science in Electromechanical Engineering 2001 TECHNOLOGY INSTITUTE Baghdad, Iraq

Electrical Sector Diploma 1997

My skills for maintenance engineers

• An ability to work well under pressure

• Good verbal and written communication skills

• Relevant technical knowledge

• Problem-solving skills

• Efficiency and organization

• Team working skills

• Ability to comprehend and adhere to health and safety regulations and standards

• Ability to anticipate problems and quickly find solutions to them

• Ability to analyze situations and provide prompt solutions to challenges

• Someone who can generate innovative ideas and techniques easily

• A person who can single-handedly and efficiently perform electrical installation jobs

• Someone who can supervise junior technicians and possesses a team spirit

• A person who can quickly adapt to changes and learn new skills and techniques. TRAINING HISTORY

• Training for the testing of power transformer at Romania from ELECTROPUTERE S.A manufacture.

• Safety Awareness Training from (USACE) USA Corp of Engineers

• Project Managements Awareness Training from (USACE) USA Corp of Engineers

• TRAINING ON THE FLOATING PUMPS ELECTRICAL SYSTEM ANO SOFTSTARTER ORIVES from ETec

ADDITIONAL INFORMATION

• Strong knowledge of applicable codes and standards (NEC, ANSI, NEMA, NFPA, IEEE, BSI)

• Microsoft Office



Contact this candidate