Parvez Ahmad
S/O: Bashir Ahmad
Nationality: Indian
D.O.B: 8th Dec-1973
Status: Married.
Contact details:
Cellphone : 009**-*********
Email: ********@*****.**.**
Transferable Iqama and Valid KSA Driving License
PROFILE
Graduate Electrical Engineer with 22 years’ experience in the field of project management, construction management, construction supervision, project planning, testing and commissioning of EHV/HV/MV Power Transmission Projects for enhancement of power dispersal, Infrastructure Projects, MEP and Building Construction and Maintenance Projects. Have worked with client, consultant and contractor. Have completed multiple projects starting from initiation till closing phase of projects and delivered them within the budget, time and quality constraints. Thorough knowledge of International and local (KSA) construction & electrical standards and their implementation on site i.e. Saudi Electric Company (SEC), Royal Commission (RC), Saudi Aramco, IEC, NFPA & NEC standards. Also conversant with ISO 9001:2015 Quality Management System and its procedures. Effective problem solver and able to handle multiple tasks simultaneously with high professionalism and accuracy. AREAS OF EXPERTISE
Project Management Infrastructure Projects
Construction Supervision Building Construction Team Work Project Planning & Scheduling MEP Construction Communication Skills Risk Management Power Equipment Installation Trouble Shooting Quality Assurance & Quality Control Power Cables/Equipment Testing Occupational Health and Safety KEY COMPETENCIES
• Holds proficient project management skills: Completes projects in project management framework in all phases of projects. Prior to planning, studies cultural and ethical values of the company, understands the business case and initial requirements and constraints, and interests/requirements of all stakeholders. Implements the requirements in project planning, performs active coordination with planning team, formation of WBS, schedule and budget, identifies risks and takes care of those risks during construction of project. Executes the project plan in construction, continuously improves and collects work performance data and compares it with quality and progress requirements. Make coordination and meets with all stakeholders and take care of their best interests.
• Team player and active documentation: Ensures proper team coordination, manages the team and enhances skills of individuals with team building activities and training, evaluates the team performance and does knowledge sharing. Perform Audits of quality and maintain quality reports.
• Executes Contingency plan: With complete implementation of project plan, monitors coming changes with facilitation of participation of all the stakeholders, performs conflict resolution and maintains issue logs. Make changes in the plan as per requirements and implement a contingency plan in proper manners. Checks all the progress on day-to-day basis as per project baselines and for any variance, enforces corrective actions along with quality control and risk management.
• Fiduciary for implementation of safety, quality and cost: Ensures all the construction works performed within complete safety standards, implements proper safety measures at site. Maintains all the work performed within budget domains to get the maximum financial benefits for the company. Controls site team, workers, subcontractors as per planned schedule and budget and overseas all the possible changes to minimize rework. Compare actual work performed with the planned one and implement goals to meet timelines.
Page 2 o 7
PROJECTS COMPLETED / WORKED ON
Project Name: Company Duration
Rehabilitation of Complete ICCP System in Sea
Water Cooling Plant 1 & 2 and Canal-3 Siphon
(North and South) for MARAFIQ Jubail.
Contract No: 720*******
Power Zone Contracting Co.
L.L.C.
(Saudi Arabia)
Sep 2019 to Present
Replacement of complete 13.8 KV Distribution
network at Sewerage Water Treatment Plant
(SWTP-9) for MARAFIQ Jubail.
Contract No: 720*******
Power Zone Contracting Co.
L.L.C.(Saudi Arabia)
Jan 2018 to Sep 2019
Secondary Infrastructure of Jubail University
Project.
Main Client: Royal Commission Jubail.
Contract No: 097-C73-R
Power Zone Contracting Co.
L.L.C.
(Saudi Arabia)
Nov 2014 to Dec 2017
Lead Workshop Engineer
Main Client: SCECO,
Al Mishaal Contracting
Company
Nov 2007 to July 2014
Ultra Industrial Services
Main Client: Saudi Aramco
Ultra Industrial Services
June 2001 to Sep 2007
SOFTWARE / SYSTEM SKILLS
Software Skills Level
Microsoft Office 360 Advance Level
Auto Cad Intermediate Level
PROFESSIONAL EXPERIENCE
1. Current Company: Power Zone Contracting Company LLC. Company Website: www.powerzoneksa.com
Employee since: November, 2016 till present.
Current Position: Project Engineer.
Location: Royal Commission Jubail, Saudi Arabia.
Page 3 o 7
Clients/Customers served, while working with PZC:
As Project Manager at PZC:
• Initiated implementation on the planned projects as per requirements of the contract. Did site visits as part of execution team along with design teams. Studied actual site condition and reviewed plans and profiles accordingly. Planned all the activities and developed schedule. Participated in post-bid clarification meetings.
• Executed construction work as per plan. Performed construction according to approved drawings, standard and specifications. Did day to day coordination for daily issues and technical problems. Implemented work breakdown structure.
• Monitored and controlled all activities as per quality standards. Ensured Safety during construction works. For any change completely implemented change control mechanism and strictly followed that. Made changes in project schedule accordingly and presented them in S-Curve. Strictly followed milestones and did crashing and fast tracking for timely completion of activities keeping in view other constraints.
• Attained completion of projects in project management framework. Did proper documentation, closed and handed over projects to concerned client’s department after validation and completion of rectification works as issues raised by relevant departments for any discrepancy.
• Provided technical support to site team and took corrective actions where required.
• Attended Kick off meetings.
• Participated in pre-bid and post-bid clarification meetings.
• Effectively implemented Project Quality Plan (PQP) on all assigned projects.
• Designed and applied method statements for completion of construction activities in accordance with safety and quality standards
• Ensured strict compliance with the project schedule and achieved all project milestones with little or no delay.
• Following up site activities on daily, weekly and monthly basis with the team.
• Reviewed ITP’s (Inspection test plans), test procedures, Quality records and test records in coordination with QA/QC and Site/Test Engineers.
• Ensured that International Industry codes/standards as well as local SABIC, Marafiq and Royal Commission codes/standards are properly maintained during site activities.
• Prepared and raised Technical Queries (TQ’s) and Field Change Notices (FCN) in case of deviations from IFC due to site constraints or any other constructability issue.
• Prepared job safety analysis (JSA’s) and material deployment plan to ensure safety and effective work progress on site.
• Reviewed IFC packages and ensured its correct implementation on site.
• Ensured proper implementation of Work Method Statements to avoid NCR’s.
• Followed up on NCR’s in case of any non-compliance till final rectification and ensured quality of work at site.
Page 4 o 7
• Reviewed As-Built drawings for assigned projects prior to submission to client.
• Performed regular site Inspections and kept close coordination with the client, local authorities (and other contractors working in the same area.
• Witnessed FAT for MV 13.8 KV Power Cables (QTY. 25,000 Meter), Power Distribution & ATS Panels and Transformer Rectifier Units.
• Performed inspections before pulling cable and directing route for Direct Buried, HDD portion Duct banks, Man holes and preparation for cable trench for underground Transmission Line projects.
• Monitored and supervised Cable IR, Sheath testing and Hi-Pot testing to ensure health of cables prior to backfilling and commissioning.
• Monitored and supervised inspections during Power Cable pulling, Splicing, Link Boxes installation and termination at switch gears.
• Supervised testing and commissioning of Medium Voltage cables (13.8KV) distribution network @ Sanitary Waste Water Treatment Plant SWTP-09 Marafiq.
• Monitored and Supervised Installation, testing and commissioning of power distribution panel boards and Transformer rectifier units @ Sea Water Cooling Plant Jubail.
• Monitored and Supervised Installation of Pre-Insulated Carbon Steel Pipes (30 inches, total quantity 12,000 Meters, operating pressure 14 Psi) including leak detection system for Chilled Water District Cooling system for Jubail University Project @ Royal Commission Jubail.
• Supervised Cable IR and Sheath testing for leak detection system before backfilling.
• Supervised and coordinated sub-contractors for chemical cleaning and hydro testing of installed pipeline.
• Prepared and estimated billing quantities for progressive invoices of the projects assigned. 2. Company: Al Mishal group of companies
Client: Saudi Electric Company
Employee since: Nov 2007 to July 2014.
Position: Project Engineer.
Location: Dammam.
Page 5 o 7
As Project Engineer at Al Mishaal Company:
• Ensure a supportive environment and a workplace that challenges, inspires and creates the conditions conducive to learning.
• Day to day management of workshop staff, participants, volunteers and makers.
• Assist in the planning, designing and delivering of new products and programs.
• Manage quality issues in all aspects of production, workshop operation in line with codes of practice
• Oversee production of orders and commissions, and ensure the accurate and timely completion of them in collaboration with technicians.
• Provide a well-run and maintained workshop including building maintenance and other issues in relation to the management of the workshop.
• Establish and maintain clear systems for receipts and dispatch of goods with regard to H&S.
• Continue the ongoing development of the Workshop facility.
• Establish that all equipment, plant and substances used are suitable for the task and are kept in good working condition; this includes the regular maintenance and servicing of equipment.
• Provide adequate training, information, instruction and supervision to ensure that work is conducted safely
• To be proactive and encouraging in giving technicians opportunities for personal development and skills acquisition.
• Attend relevant internal and external meetings and provide reports to the Business Manager as required.
• Develop and maintain accurate records pertinent to the running of an efficient department.
• Support the Business Manager in the overall management and development of company’s production activities and services.
• Operate within the scope of company’s policies and the law.
• Actively pursue personal development and training opportunities.
• Undertake any other duties as consistent with the post.
• Ensure the department is active in the cost effective use of resources.
• To ensure that equipment’s are serviced in accordance with departmental service standards.
• To ensure that pro-active planned maintenance is carried out on equipment’s to prevent problems occurring.
• To maintain a high performing engineering team and in particular take responsibility for supporting and advising technicians and coaching and mentoring of apprentices. Page 6 o 7
3. Company: Ultra Industrial Services
Employee since June 2001 to Sep 2007
Position: Project Engineer
• Installation of safety crash Barriers.
• Testing and Commissioning.
• Tested electrical instruments and developed/improvised devices, components, products and systems for commercial/industrial purposes.
• Operation of equipment through PLCs as well as locally, trouble shooting for abnormal condition.
• Preventive maintenance
• Review scope of work as per project quality plan.
• Review product specifications.
• Check all verifying documents to be consistent with the original documents.
• Check the daily inspection report completed by the crew supervisor.
• Ensure all documentation was correct and complete before client inspection.
• Ensure corrective actions are performed as per the requirements of approved recommendations.
• Identify defective works and prepare reports indicating the violations.
• Prepare all inspection reports.
• Raise RFI for final inspection/acceptance from client representative.
• Complying strictly with safety rules and regulations of the organization.
• Carry out site installation tests.
• Supervision of materials during in-process and final.
• Preparation and development details of termination schedule.
• Planning of Manpower & Equipment.
• Coordination with Clients, Consultants, QA/QC department.
• Ability to prepare product documentation, writing reports and giving presentations.
• Monitors Installation of Equipment/systems to ensure compliance with design specification and safety codes. Page 7 o 7
SOFTWARE / SYSTEM SKILLS
Software Skills Level
Microsoft Office 360 Advance Level
Auto Cad Intermediate Level
ACADEMIC QUALIFICATION
1997
Bachelor’s Degree
(Electrical Engineering)
SJM Institute of Technology (Karnataka India)
PROFESSIONAL ACCREDITATION & TRAINING’S
Certified by ComRent International USA for Testing heavy Generators and Turbines Trained at: ComRent International Facilities Saudi Arabia
Approved by Illinois Blower, Inc. online balancing and vibration analysis for G.E turbines Trained at: IBI Facilities Saudi Arabia.
•
Personal Details
Date of Birth 06-12-1973
Languages known English, Arabic
Iqama Status Transferable
Marital Status Married
Religion Muslim
Nationality INDIAN
Driving License Valid Saudi Driving License