CHAK NO ***/EB BUREWALA
DISTT VEHARI (PAKISTAN)
Phone 009***********
E-mail: ***********@*****.***
ZULFIQAR ALI – SUPERVISOR (MECHANICAL)
OBJECTIVE
Challenging position with a dynamic group where I could apply my all skills and abilities obtained through, work experience and educational background for the success of my professional field. PERSONAL INFORMATION
Father’s Name : Muhammad Siddique
N.I.C No : 36601-1538318-3
Passport No : NL1793182
Date of Barth : 30 October, 1971
Nationality : Pakistani
Language : English, Urdu
Marital : Married
ACADEMIC QUALIFICATION
Intermediate in 1991 from Govt. Degree College Burewala Diploma of land surveyor
Safety Management and leadership Training (CCIC QFD UAE) Osho 30 Hours in Construction Safety (July 2013) Hiosh international SUMMERY OF EXPERIENCE
15 years’ Experience (with Multinational Companies in oil & Gas field oil, Refinery, petrochemical, Fertilizer, Power plants & shutdowns
PROFESSIONAL EXPERIENCE
1. Tamimi Industrial Services Division Al-Jubail KSA Position Mechanical Supervisor
Project PP13 COMBINED CYCLE POWER PROJECT RIYADH GAMA POWER ARABIA LIMITED Duration November, 2016 to Till date
Client Saudi Electricity Company
2. Tamimi Industrial Services Division Al-Jubail KSA Position Mechanical Supervisor
Project SEPCO MGSE PHASE-1 BGCS-3- BOOSTER GAS COMPRESSION STATION PROJECT Duration October, 2015 to November, 2016
Client Saudi Aramco
3. Tamimi Industrial Services Division Al-Jubail KSA Position Mechanical Supervisor
Project Saudi Aramco Rastanura Refinery Loading Rack Facilities Project Duration October, 2014 to September, 2015
Client Saudi Aramco
4. Consolidated Contractors Company (CCC) – Abu Dhabi (UAE) Position Supervisor (GRE – Glass Reinforced Epoxy) Project QUSAHWIRA FIELD 1.8 MMBOPD PROJECT (P-11)
Duration 15-02-2012 to 15-05-2013
Client Abu Dhabi Co. for Onshore Oil Operations (ADCO) NPCC 5. PAK ARAB FERTILIZER.
Position Senior Supervisor (Mechanical Piping)
Project Ammonia Storage Tank
Duration 14-11-2010 to 23-01-2012
Client Pak Arab Fertilizer
6. DESCON ENGINEERING LIMITED.
Position Supervisor (Mechanical Piping)
Project Engro Chemical Pakistan Limited
Duration from 01-01-009 to 10-11-2010
Client Enven1.3
7. OLAYAN DESCON INDUSTRAIL CO. (KSA)
Position Supervisor (Mechanical)
Project Olayan Descon work shop
Duration from Sep, 2003 to 26/5/2008
Client Saudi Aramco, sabic, JGC
8. CINTRACT RESOURCES LTD
Position Supervisor (Mechanical)
Project S Sawan Gas field Development Project. Sindh Duration from July, 2003 to Sep, 2003
Client CLOUGH
9. HARIS & CO.
Position Supervisor (Mechanical)
Project Sawan Gas field Development Project. Sindh Duration from Jan, 2003 to July, 2003
Client CLOUGH
10. SIEMENS PAKISTAN ENGINEERING
Position Supervisor (Mechanical
Project Kadanwari up-grade & miano field Development project Duration from Dec, 2002 to Jan 2003
Client OMV
11. DESCON ENGINEERING LIMITED.
Position Lead Man
Project Parco mid country refinery project qasba Gujarat Duration Turnaround 2002
Client PARC
12. SIEMENS PAKISTAN ENGINERING.
Position Lead Man
Project BhitGas field Development project. Sindh.
Duration from Oct, 2001 to Sep, 2002
Client LASMO
13. DESCON ENGINEERING PVT LTD.
Position Lead Man
Project Borouge petrochemicals project UAE.
Duration from Mar 2001, to May, 2001
Client TECNIP
14. INDUSTRIAL KINETICS ENGINEERING SARVICES
Position Lead Man
Project Hub co power project
Duration Turnaround 2000
Client HUB CO
15. WESTERN GROUP OF ENGINEERING
Position Lead Man
Project Parco mid country refinery project Qasba Gujarat Duration from Feb, 1999, to Jun, 1999
Client PARCO
16. CINTRLOS DISSEL EXPORT.
Position Fabricator
Project Sapcol Power plant
Duration from Jan, 1997 to Des, 1997
Client ABB
RESPONSIBILITIES
GRE – Glass Reinforced Epoxy
Review of isometric & piping layout of ongoing GRE installation and make sure that the drawing are up date prior to fabrication and erection
Check actual dimension, co-ordination and elevation of installed GRE pipe and assembly with surveyor and make sure that changes (if any) area incorporated in all relevant drawing (Red line/As built)
Arrangement for incoming material inspection and get clearance before using
Proper storage and handling the pipes and fittings
Follow the client comments or punch lists and make sure for completion of on schedule time
Attend weekly progress meeting with construction manager
Supervision and arrangement for hydro and gravity test Equipment Fabrication.
To prepare material list according to drawings and issuing the material from warehouse.
Layout marking and cutting of sheet for equipment (Vassal, Heat Exchanger, column, Ejector, tanks.
Beveling (single/double), grinding, fit-up the joints according to approved procedure.
Fit up of nozzles, plate form clips, ladder clips, pipe supports.
Equipment dimension verification before start welding.
To verify equipment dimensions after welding.
Arranging the fabrication according to materials group (CS, SS, Duplex, Alloy Steel)
Preparation for hydro testing, leak testing & pneumatic testing of equipment’s. Plant piping fabrication & Erection
To prepare material list according to drawings and issuing the material from warehouse.
Spool marking on isomeric drawings.
Pipe marking and cutting.
Beveling (Single/Double), grinding, fit-up the joints according to approved procedure.
Spools dimension verification before start welding.
To verify spool dimensions after welding.
To identify the spool with weld no`s, spool no`s as per drawings.
Arranging the fabrication according to materials group (CS, SS, duplex, Alloy Steel)
Piping erection as per approved drawings plans & P& l diagram.
To complete the lines, installation of valves and connect with equipment’s.
To complete the punch list point.
Material traceability by color coding (fitting, pipe & consumable material.)
Preparation for hydro testing, leak testing & pneumatic testing U/G & A/G piping.
Cleaning, flushing / air blowing the lies.
Commissioning & chemical cleaning the systems.
To prepare daily progress report.
Steel structure
Material issuance from warehouse according to drawings.
Marking, cutting and fabrication as per approved drawings.
Dimension inspection as per drawings.
Identification the steel structure items.
Bolt tightening and punch list killing.
Erection of steel structure, column, beam, channel and bracing as given drawings & plan.
Coordinate with Quality Control Department for inspection.
Coordinate with Engineering Department for AS-Built of drawings. OFFICE WORK AND COMPUTER SKILL
Preparation of daily fit up and welding reports
Preparation of Bill of Quantity
Billing Verification of subcontractor
Installation of Window and other software
MS Office, Internet Browsing
In page 2000
MS Project
Filing and record maintaining
LANGUAGES
English, Urdu, Punjabi Arabic
DRIVING LICENSE
Valid Saudi Driving license
SALARY EXPECTATION
Negotiable
REFERENCES
To be provided upon the demand