Post Job Free
Sign in

Piping Engineer

Location:
Abu Dhabi, United Arab Emirates
Posted:
December 29, 2024

Contact this candidate

Resume:

WAQAR ISMAIL

PIPING ENGINEER

Total * Years of Experience

CONTACT

PHONE:

009***********

EMAIL:

*************@*****.***

PERSONAL INFORMATION

• Birth date: 13/03/1992

• Marital Status: Married

• Nationality: Pakistan

• Residence: Shabiya 12 Abu Dhabi

EDUCATIONAL QUALIFICATION

• University: Shenyang University of

Technology

• Country: China

• Degree: Bachler in Mechanical

Engineering

• Date: SEP 2012 – JULY 2016

LANGUAGES

• English

• Chinese

• Urdu

• Hindi

SKILLS

• MS Office Suite

Very well Versed in the use of Excel,

Access and PPT, Easily Manages the

Site Details and Prepare

Presentations on Demand.

• Autodesk NAVIS

Can Use the Platform to Get Insights

in the 3D Design of the Plant and Use

it for Work Front Analysis.

• Flexibility

Ability to Work in any Environment.

PRESENTATION

Having 6 Years’ Experience in Oil and Gas Facilities, Piping and Structural for Engineering & Construction Projects. Completed Projects BIFP and HABSHAN 5 and recently working on PV Hybrid Solar Power Project with China Petroleum Engineering and Construction(EPC). Having Good Technical Knowledge and Experience in Layouts, Material, Fabrication, Welding, Non Destructive Testing and Painting. Worked with Major Clients

(ADNOC, ADNOC GAS PROCESS-GASCO, NOOR

ENERGY/SHANGHAI ELECTRIC).

PROFESSIONAL EXERIENCE

COMPANY

China Petroleum Engineering and Construction Corporation – EPC

(United Arab Emirates)

Projects:

• BAB Integrated Facilities Project (JAN 2019 to MAR 2021) ADNOC

• Habshan-5 DE-Bottle Necking GAS Associated Project (MAR 2021 to MAR 2022) ADNOC Gas Process (GASCO)

• PV Hybrid Solar Power Project (MAR 2022 to SEP 2024) NOOR ENERGY AND SHANGHAI ELECTRIC

• BAB FAR NORTH FULL FIELD DEVELOPMENT PROJECT (BFN) (NOV 2024 to Present Date) ADNOC AND KENT INTERNATIONAL ARABIA Position: Piping Engineer

Tenure: DEC 2018_ Present Date

ENGINEERING AND PLANING EXPERIENCE

• Review Project Specification and P&ID s.

• Preparation of Method Statements and Procedures as per the project Specification, Standers and Codes.

• Preparation of Marked up P&ID Drawings and Isometric Drawings for Piping Tie-in Shout Down Work.

• Attend Project Review Meeting and Project Coordination Meetings with PMC and TPI.

• Coordination with Engineering Department for the Preparation of Master Database.

• Detailed Coordination and Assisting Engineering Department for all Piping related engineering deliverables.

• Coordination with Planers for the preparation of planning packages and Obtaining Approval form Client.

• Developed and Maintain Piping Line list and Tie-in List.

• Commercial Awareness

Having an Insight of the Contract, as

Well as the Value Addition in Terms of

Extra Works.

• Management Skills

Working and Collaborating with

Multiple Disciplines/Sub-Contractor.

• Communications

Having Smooth Communication Skills

for Both Written and Verbal.

• Problem Solving

Ability to Adopt a Systematic

Approach Towards Identifying and

then Solving a Problem or Issue.

• Team Work

Maintaining Good Relationship with

All Departments for Better Output.

• Time Management

Ensure that all Activities Complete

Within the Set Timeline.

DRIVING LICENSE

• UAE Valid Driving License

FABRICATION EXPERIENCE

• Coordination with Site Team for preparation of making Priority Spool List as-per Site Requirement and Prepare the Internal Schedule as- per Approved Schedule Baseline.

• Coordination with Engineering Department for the Issuance of Isometric Drawings and Spool Drawings Job Card Wise.

• Coordination with Quality Control Department for the Approvals of ITP, NDT, Blasting and Painting Procedures.

• Coordinate with Material Team to Ensure the Material Availability as- per Drawings and Arrangements of Materials to Workshop as per Job Card Wise.

• Review Isometric and Spool Drawings to Generate AFC to Workshop as-per Engineering Data and Project Specification.

• Monitoring Production Team for the Required Cutting Plans as per Drawings.

• Leading Fabrication Team in Workshop to Achieve the Daily Fit-up, Welding, NDT, Blasting and Painting.

• Ensure Assigned Scope of Work is Carried out in Accordance with Project Specifications, Procedures, Method Statement and Without any Significant HSE Incidents.

• Specific Attention of Maintain less Backlog joints of PWHT and RT.

• Responsible for Piping Coordination with Regard to AMOGH.

• Preparation of Test Packages and Clearing Hydro Test Activities Along with in –house QC, Client’s Inspector and TPI.

• Leading QC Team for the Preparation of IRN before paint Based on Welding and NDT Completion Spools.

• Preparation of IRN (Inspection Release Note) for After painting and Coordination with Dispatch Team for Dispatching Spools to Site on Time.

• Ensure with Site team for Receiving Dispatch Items.

• Make Daily Progress Report and Status for Client.

• Achieve the Targets as per Committed Dates with Clients. FIELD EXPERIENCE

• Review the Project Scope of Work and Project Specification.

• Coordinate with Client to Arrange Site Facilities.

• Preparation of Construction Method Statements and Procedures for Fabrication, Installation and Testing of Piping.

• To liaise with procurement and material management team to ensure the project piping material delivery are in time as per planned schedule to site.

• Coordinate with Permit holder and HSE to arrange site Work.

• Preparing look ahead plan and making arrangements to achieve it.

• Ensure the Productivity and Quality is maintained by Subordinates. Coordinate with other Disciplines in site.

• Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports.

• Preparation of “AS BUILT” drawings & Field Change Request.

• Carrying out final P&ID check of installed piping systems in the module.

• Preparation of field piping system test packages, including system limit on P&ID and piping Isometrics.

• Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.

• Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.

• Ensure that hydro test reinstatement is to be done as per procedure.

• Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.

• Make Weekly Progress Report and Status for Client. Company: D.G. Khan Cement Company Limited (Pakistan) Position: Trainee Engineer

Tenure: JAN 2018_ JUN 2018

• Worked in Mechanical Workshop and CNC Cutting Machine.

• Regularly monitor, inspect, and maintain key machinery such as crushers, kilns, mills, compressors, fans, and conveyors.

• Preventive and corrective maintenance of rotating equipment like motors, pumps, gearboxes, and bearings.

• Work with other engineers to identify bottlenecks and implement improvements in the production line.

• Make Daily Work Report and Submit to Senior Engineer. Company: ZNV Technology Private Limited (Pakistan) Position: Assistant Engineer

Tenure: JAN 2017_ DEC 2017

• Assist in maintaining and troubleshooting mechanical aspects of existing surveillance systems, such as repairing camera, enclosures, or mechanical parts.

• Assist to Senior engineer for documentation and making presentation for clients.

• Make daily progress report for work at site and submit to senior engineer.

Company: China National Petroleum Corporation (China) Position: Internship (1 year)

Tenure: JUN 2015_ MAY 2016

• Involved in Basic Design Calculations.

• Reviewing Project Specifications.

• Involving Project Planning and Cost Control Activities.

• Documents Preparation

REFRENCE

• Available Upon Request.



Contact this candidate