Stephen Daniel Atchison
Availability to Start: Immediate
Shift: Prefer 1st Shift or 2nd Shift (Open for Any Shift)
Last five digit of SSN: Will disclose at the time of Joining.
316-***-**** ******************@***.***
Summary: Stephen has almost 7+ years of experience as a Quality Inspector in Aerospace Industry and HVAC.
Worked with the client with Boeing, Spirit AeroSystems, Textron, Triumph Structure and Hawker Beechcraft.
1st Parts Machined and Sheetmetal, First Articles Inspection before and after outside processing, and Final Inspections.
First Article Inspection (FAI) and CMM and GD&T. Certified with AS400, IS9100 and 9102.
Preformed aircraft inspections. Processed repair items through reports and flight repair documentation.
Manufactured of Fabrication Parts of Aircraft Like B787/B737 as per AS9100/ISO9001 standards.
Skills:
Critical Thinking
Operations Monitoring
Quality Control Analysis
Time Management
Judgment and Decision Making
Coordination
Problem Solver
CMM Operator
Receiving Inspection
First Article Inspection
GDT
Certifications:
CMM
SPC
SAP
AS400
ISO 9100
ISO 9102
Kansas Silver Work Ready
Blueprint Reading Certificates
Microsoft Office Certification
Microsoft Office 365
Aircraft Sheet Metal
Machine Parts
Education:
Bachelor of Arts at Central Bible College in Springfield, MO.
164 Hours in Biology, Chemistry, and Physics at Missouri State University in Springfield, MO.
Professional Experience:
Samaritan Assembly Inc, Wichita, KS 11/18/2009 - Present
President
Wrote legal documents to Incorporate a Non-Profit for a 501 (c) 3 with Kansas.
Manage Inter City ministries and coordinate all fund raising.
Forecast maintained annual budget, and accounting for taxes purposes. Supervised all training, ministries, conflict resolution, behaviour training.
Reason for Gap 09/2009 -Still
Working for Samaritan Assembly Inc
SQA Services, Inc, Boeing at Spirit Aersystems, Wichita, KS 02/2024 – 03/2024
Quality Inspector, Resigned
Inspection on the Production Line
PDS Tech, Textron, Wichita, KS 03/2022 - 06/2022
Quality Inspector, Laid Off Due to Covid 19 Well in one-week
Bench Inspection of Beech and Cessna Parts, Machine/Sheetmetal.
Bell helicopter and Sikorsky helicopter inspected the parts.
PDS Tech, Boeing, Wichita, KS 04/2021 - 07/2021
Quality Inspector
Skin Quality and Fasteners height.
Audited to ensure BACs, Work Instructions, and Engineering Dispositions and tags were followed on 787.
Arco Service Corp, Spirit AeroSystems, Wichita, KS 09/2019 - 11/2019 Quality Inspector / M18 Inspector Fabrication/Assembly
Quality Inspection - Certifications from 09/09/2019 to 09/09/2020.
Inspected the quality check for 737 NXT-G, 787 and 737.
Preformed aircraft inspections. Processed repair items through reports.
VTR Inc, Electromech Technologies, Wichita, KS 05/2015 - 07/2015
Receiving Inspector
Programmed Zip Lite and used Laser Micro for diameters to Inspect Motor for Aerospace and Commercial.
Operated CMM Zeiss using Calypso software with Quality Notification.
Johnson Service Group, Triumph Structures, Wichita, KS 12/2014 - 01/2015
CMM Operator
Operated CMM to Inspect Machined Parts using Camio 8.1 & PC Dims software with Quality Notifications.
Used Faro Arm and Ultrasonic for Thickness of Machined Aircraft parts.
First Article Inspection.
Manpower, Trinity Aerospace, Wichita, KS 04/2014 - 06/2014
Quality Inspector
1st Parts Machined and Sheetmetal, First Articles Inspection before and after outside processing, and Final Inspections.
Performed close tolerances of aircraft parts to ten thousand with Air Gauge.
ZTM Inc, Wichita, KS 09/2012 - 11/2012
Sheet Metal Assembly
Obtain required information from prints, charts, sketches work instructions, documents, verbal, and electronic information.
Installed bushing and bears into aircraft assembly parts to complete assemblies.
Used precision instruments, hand tools, power tools, machines, and equipment.
Verified work performed is per work instructions and meets process and/or engineering specification.
Mixed ingredients such as resins, catalysts, fillers, accelerators according to formulas, manually or using mixer.
Hawker Beechcraft, Wichita, KS 08/2011 - 01/2012
Sheet Metal Assembly Laid Off
Determine project requirements, including scope, assembly sequences, and required methods and materials, according to blueprints, drawings, and written or verbal instructions
Installed assemblies, such as plumbing, antennas and safety wires into supportive framework.
Operated electrical bonding machine according to specifications of materials.
Drill and punch holes in metal, for screws, bolts, and rivets.
Installed assemblies, such as plumbing, antennas and safety wires into supportive framework.
Operated electrical bonding machine according to specifications of materials.
Sealed seams with bonds to assemble components into products or repair sheet metal item.
Examined products to verify conformance to quality standards.
Fasten seams or joints together with welds, bolts, cement, rivets, solder, caulks, metal drive clips, or bonds to
assemble components, into products or to repair sheet metal items, checking for FOD as you go, and final Joined
structural assemblies, such as wing fairings with drill and punch holes in metal, for screws, bolts, and rivets, checking for FOD as you go and in Final assemblies, and worked squawks and helped closed Production Documents before going to Flight Department.
Team Employment, Goodrich, Hutchinson, KS 10/2010 - 05/2011
Quality Inspector
Approved tooling of Composites and initial First Articles or certifications and reapproved tools.
Analysed and interpreted blueprints, data, manuals, and other materials to determine inspection and testing procedures, adjustment, and certification methods.
Inspected, tested, and measured materials, products, and work for conformance to specifications.
Discarded or rejected products, materials, or equipment not meeting specifications.
Quality Notifications of inspection results with those responsible for products and recommended necessary corrective actions.
Worked under ISO 9100 Certification with knowledge in ANSI Y14.5M and GDT Used AS91 02 forms for First Articles.
Hawker Beechcraft, Wichita, KS 03/2007 - 11/2009
Sheet Metal Assembly Laid Off
Determine project requirements, including scope, assembly sequences, and required methods and materials, according to blueprints, drawings, and written or verbal instructions
Installed assemblies, such as plumbing, antennas and safety wires into supportive framework.
Operated electrical bonding machine according to specifications of materials.
Drill and punch holes in metal, for screws, bolts, and rivets.
Installed assemblies, such as plumbing, antennas and safety wires into supportive framework.
Operated electrical bonding machine according to specifications of materials.
Sealed seams with bonds to assemble components into products or repair sheet metal item.
Examined products to verify conformance to quality standards.
Fasten seams or joints together with welds, bolts, cement, rivets, solder, caulks, metal drive clips, or bonds to
assemble components, into products or to repair sheet metal items, checking for FOD as you go, and final Joined
structural assemblies, such as wing fairings with drill and punch holes in metal, for screws, bolts, and rivets, checking for FOD as you go and in Final assemblies, and worked squawks and helped closed Production Documents before going to Flight Department.
Johnson Controls, Wichita, KS 12/2001 - 03/2007
Quality Inspector and Assembly
Wrote a Macro in Microsoft Excel is Still used to tracking production.
Performed First Article Inspection on all new products or new suppliers.
Receiving Inspection on new products and on products on PPM List for problems.
Tested Electronic components: Wire Harness, Circuit Boards, Transformers, Sequencers, Electrical Motors, and Limit Switches.
Supervised Inventory Counts of Sheet Metal with 100% accuracy.
Approved Tooling for initial certifications and reapproved tools.
Discarded or rejected products, materials, or equipment not meeting specifications.
Quality Notifications of Recommended necessary corrective actions from Inspection results with those responsible for products, supervisors, and engineers.
CMM Certification - Operating Romer CimCore Portable CMM.
Analysed and wrote using ISO 9001procedures and FA Is using ISO 9102.
Ultrasonic for Thickness Assisted with Lean and Six Sigma projects.