Victor Wu
Male ** Years old (****/**) ** Years Living in Foshan
**********@***.***
Personal Advantage
I have below experiences and abilities.
1. A pretty fluent English Speaker. English is one of my daily working languages, as well as Mandarin and Cantonese;
2. Project management experiences and ability;
a)PMP certified.
b)More than 8 years of project management experience on automotive product development.
3. Product development and engineering experiences;
a)Have more than 5 years of working experience on mechanical design and product development.
b)Proficient in using both Creo and SolidWorks for creating 3D/2D. Capable of using Catia.
c)Experienced on FEA.
d)Familiar with many different manufacturing processes, such as injection, stamping/bending, die-casting, aluminum extrusion.
e)Familiar with finishing treatment such as powder coating, anodizing, etching, etc.
f)Experienced on fixture/check jig design and fabrication.
g)Have experiences and good knowledge in APQP, PPAP, SPC, MSA, FMEA.
h)Have knowledge on GD&T, GPS
4. IT skill sets: Office, Photoshop, CorelDraw, network maintenance.
Job Preferences
Position:
项目经理
City:
Foshan
Target Salary:
1.8W-2.2W/Month
Industry:
Automobile Parts
Job Type:
Full-time
Position:
产品结构工程师
City:
Foshan
Target Salary:
2W-2.5W/Month
Job Type:
Full-time
Position:
产品经理/主管
City:
Foshan
Target Salary:
1.8W-2.2W/Month
Job Type:
Full-time
Current Status:
I'm looking for jobs now
Duty Time:
within 1 month
Work Experience
Zhongshan Eberspaecher Kalori Air Conditioning Ind
2023/3-Present
Senior Project Engineer
Automobile Parts 50--150 Foreign Comp.(Eur./N.Amer.)
Description:
The company is a subsidiary of the Eberspaecher Group. The Eberspaecher Group is a world leading manufacturer on air conditioning system used on special vehicles, such as crane, ambulance, agriculture vehicles, trucks, motorhomes and so on.
Because of business development of the company and my excellent engineering background and experiences, my actual work contents cover not only on project management, but also on system application development and support
My actual job contents contain 2 parts:
Part 1, Project management. Lead the team to carry out HVAC/EHVAC/VAC/HV product localization (or New Product Import, NPI).
a)Analysis market demands and evaluate the feasibility for importing products for local production (Localization).
b)Work out product localization procedure, proposal and plan.
c)Coordinate involved departments for carrying out localization activities.
d)Lead and resolve encountered issues.
e)Organize and participate in localization meetings among Multinational subsidiaries.
f)Workout validation standards for localization products.
Part 2, Provide pre-sale design and support for A/C system application.
a)Not only I lead the team for application design, but also I use Creo/SolidWorks to design HVAC/EHVAC/VAC/HV applications for customers by myself.
b)Issue 3D design, 2D drawings.
c)Fabricate samples.
d)Organize and participate in development communication meetings with foreign customers, multinational and multifunctional teams.
e)Product packaging design.
Guangdong Axon 6 month
2022/9-2023/3
General Engineer
Automobile Parts 150-500 Foreign Comp.(Eur./N.Amer.)
Description:
Guangdong Axon is the subsidiary of Axon' Cable S.A.S. Guangdong Axon designs and manufactures innovative cabling, interconnect solutions, cable assemblies,
connectors and mini systems for high tech applications on aerospace, automotive…
The sector I worked on was automotive terminals/connectors. My work contents include:
a)Study manufacturing feasibility, manufacturing processes and work out manufacturing process proposals according to customer's terminal/connector product inquiry information, such as 2D drawings and 3D CAD, product specifications and requirements.
b)Breakdown and re-design customer's product into parts or semi-products which can be manufactured in both 2D drawings and 3D CADs with Creo or SolidWorks according to the manufacturing proposal. Meanwhile, attain injection/stamping mold quotation from mold suppliers.
c)Evaluate and calculate product cost for quotations back to customers.
d)Lead and drive engineering review meetings with foreign customers/domestic customers and colleagues from multi-departments (such as production department, quality department…) to clarify customer's requirements via video conference.
e)Lead multi-department engineering review meetings for reviewing manufacturing proposals.
f)Create and issue production 2D drawings, create BOM.
g)Control engineering change (ECN).
Kidsii 1 year and 11 months
2020/10-2022-9
Sr. Design Engineer
Furniture/Home Appliances/Toys/Gifts 500-1000 Foreign Comp.(Eur./N.Amer.)
Description:
My major job duties focused on new product development (NPD) from concepts to mold development. These include:
a)Lead product development projects. Conceive and provide mechanical design proposals for solving issues/concerns encountered during new product development
b)Ensure new product designs comply with ASTM/EN standards.
c)Ensure new product meet functional requirement, cost requirement, packaging requirement.
d)Lead sample review meetings in oral English with multiple departments in US.
e)Create 3D CAD for mechanical proposals via Creo.
f)Review design proposals from 3rd parties.
g)Make prototypes. Verify safety performance and structural function.
h)Carry out cost evaluation for new products and generate bill of material.
i)Compose product specification. Work out RFQ for quotations.
j)Explore new material and new manufacturing processes.
k)Compose product user manual.
l)Carry out VA/VE for product cost reduction.
m)Carry out Finite Element Analysis (FEA) for designed parts.
Achievements:
a)Developed several key products for the company, such as multifunctional baby cots, electrical swings, play bar. Especially, the play bar attained design patent.
b)Resolved quality/design issue for an old swing product. The swing product started mass production in December year 2020 and was found product quality unstable on swinging motion stop or slow swinging. No other team members could find out the root cause and the company assigned me to investigate and solve the issues in early April. I used FTA and 5W methods to find out the root cause and solved the problem by end of April, 2021.
My works and capability were highly recognized by the company. Therefore, I was promoted from engineer to senior engineer in early 2022.
EGR Group 8 year and 2 month
2012/8-2020/10
Project Manager
Automobile 500-1000 Foreign Comp.(Others)
Description:
The EGR Group develops and deals with automotive products. My major job duties include: Lead and manage new product development project with suppliers; Source and develop new suppliers; Research and develop new processes for new products.
A) Lead product development projects from RFQ stage to initial production stage. Work contents include:
a)Send RFQs to suppliers for inquiry; Break down cost and conduct cost analysis.
b)Review product specification, requirement with suppliers.
c)Conduct manufacturing feasibility study, potential risks study and generate counter measures with suppliers.
d)Work out project timing plan.
e)Drive the project progress via reaching the roadmaps such as tooling development, OTS samples development, PPAP submission.
f)Develop fixtures and check jig.
g)Work out PCP,QCP, SOP, PFMEA, MSA,SPC according to stages of APQP.
h)Review 3D/2D drawings.
i)Work closely with colleagues in US, Aus, UK via written and oral English communication to update project status and resolve all kinds of issues during product development.
B) Source and develop new suppliers. This includes:
a)Search potential new suppliers.
b)Visit, evaluate, and screen out new suppliers.
c)Participate in factory audit to new potential suppliers.
C) Research and develop new process, new material. Works include:
a)Study and understand customer's need, requirements. Raise new process proposals to customer.
b)Develop samples or prototypes to customer for review and tests.
Achievements:
a)Developed a key supplier who produces section products of rear bumper protectors. I developed this supplier into OEM level. Therefore, EGR won several OEM customers on this product section.
b)Led developments of aluminum tonnue cover products, which are another key product section to the company. I total developed 21 models of aluminum tonnue cover products.
c)Led developments of decades of side bar products, bull bar products. These products were mainly supplied to Mitsubishi, Toyota, Nissan and Renault.
Unipart Rail Foshan Representative Office 3 year and 10 month
2008/10-2012/8
Supplier Engineer
Trading/Import & Export 500-1000 Foreign Comp.(Eur./N.Amer.)
Description:
Dealing with railway spare parts and leisure products are part of the Unipart's businesses.
My job contents were product sourcing and supplier developing. Manage all the whole procedures for supplier and product sourcing and developing. Details include:
a)Look for suitable suppliers and products.
b)Supplier/factory identification, attaining quotation and price analysis.
c)Attaining samples.
d)Factory visit, evaluation and audit.
e)Technical issue solving.
f)Quality control.
I sourced out-door electric appliances, such as washing machines, electric water kettle which are used on caravans, out-door camping supplies, gas heaters. I am especially familiar with gas heater and well know the standard BS EN 449 which the standard for gas heaters.
Brington Industries Ltd 2 year and 3 month
2006/7-2008/10
Engineering Supervisor
Trading/Import & Export 50-150 Foreign Comp.(Eur./N.Amer.)
Description:
The Brington Ltd developed and deal with traveling bags, traveling trolleys.
Job contents of my position were:
a)Manage the whole product and part development procedure from design to initial production.
b)Design 3D for new products or parts via Pro Engineer.
c)Search and develop new suppliers for new component /accessories.
d)Develop prototype / samples.
Hotline Information Technology Co.Ltd 4 year and 4 month
2002/3-2006/7
Programmer / Project Supervisor
Computers, Software 50-150 Private Comp
Description:
Job contents:
a)Analyze customers' requirement and organize R&D for new projects, coding.
b)Maintain and follow up the new projects.
c)Manage and maintain IIS, windows server, and Ms SQL sever.
d)Conduct network maintenance.
( Be accomplished in programming with C++ Builder Delphi MS SQL on database enterprise application. 5,Have developed many enterprise applications system such as Shunde Tax Office Short Message Dispatching System, Enterprise SMS Communication Platform website, Hotline Messenger etc. 6,Have abundant experience on database server maintenance, web server maintenance, company network system maintenance.)
Shunde Wine Factory Co.LTD 8 month
2001/7-2002/3
Mechanical equipment engineer
FMCG( Food,Beverage,Cosmetics) 150-500 Private Comp.
Description:
Job contents:
a)Conduct check and maintenance on packaging equipment and machines on wine production lines of the company. Those equipment machines include filling machines, bottle washing machines, conveyer system, and code spray machines etc.
b)Redesign/draw components for package equipment and machines.
Project Experience
LEAN production improvement to a supplier
2018/7-2018/9
Description:
We carried out LEAN promotions to our supplier to make it reach OEM production level and won long term business from our customer. The supplier is one of our RBP and door sill suppliers. This supplier has been certified with IATF16949. However, before promotion, the supplier's workshop wasn't organized well enough. Product defective rate was high. Output was low. After improvement, all above issues were solved: Materials and semi-products are placed regularly with clear identification. Defective rate drops from 5% to 0.2%. Output increases from 300 sets to 400 sets per day. All these improvements were recognized by the customer. The main works of the promotions included: 1, We partitioned different zones in the workshop for materials and semi-products, applied identification cards to materials, applied FIFO to manage materials. All these measures let the materials' status to be clearly learned and avoided them from mixing up. 2, we re-organized production line lay-out and material flow. This has reduced redundant transportations for both materials and operators. Meanwhile, this has reduced time "muda". Furthermore, this has reduced defective rate caused by redundant transportations. 3, Associated with the causes of defect parts, we re-designed transportation carts with enhanced protection function for materials/semi-products. With enhanced carts, the defective rate drops obviously. 4, We changed the production flow into pulling style, which means the process behind pulls materials from the previous process. In this way, it eliminated waiting time at some processes. 5, Introduced visual management: a) Used more pictures and less words in SOP and quality criteria. This allowed the operators to understand what to do or what requirements on the product by only taking a glance. b) Introduced visual board for production target and output. This has activated the whole production team to meet the target while they were clear on their target and current production situation.
Aluminum tonnue cover series development
2013/3-2019/11
Description:
We've developed total 21 models of aluminum tonnue cover product from CAD drawings to actual products since March of 2013. And these 21 aluminum tonnue cover models include OEM version suiting for Mercedes-Benz VS40, OEM version for Ford Ranger.
It was the 1st time for the company to develop this kind of product. There was no similar one-piece aluminum tonnue cover products in market at that time. We started from 3D CAD/drawings. We developed the 1st product model through looking for supplier, inquiring for cost, making porotypes samples, developing tooling, specifying product criteria and testing methods, making OTS samples for testing, making PPAP samples, working out PPAP documents.
We totally developed 21models of aluminum tongue cover. Total purchasing quantities for these tonnue cover reach 3500 sets per year. Total purchasing value is up to US$ 875,000 per year.
Education
Northwest Light Industry College
1997/9-2001/7
Bachelor Packaging Engineering
Description:
My specialty is Mechanic/Packaging Engineering. The curriculums include Mechanical Theory, Mechanical Design, Packaging Motivation, Packaging structure, Packaging technique, Packaging CAD, Packaging printing etc.
Lizhaoji Middle school
1994/9-1997/7
High School
Skills & Speciality (Including IT skills languages certifications and trainings)
Skills/Languages
Creo
Advanced
English
Advanced
SolidWorks
Advanced
CorelDraw
Good
Catia
Good
Certifications
CET6
1999/9
PMP
2023/11