Post Job Free
Sign in

Power Plant Start Up

Location:
Rayong, Thailand
Salary:
80000
Posted:
December 15, 2024

Contact this candidate

Resume:

Name : MR. APICHOKE PHADUNGPRASERTKUL

Address : The Palm Phala Beach House 189/53 Soi.3

M.7 T.Phala A.Banchang Rayong Province Thailand 21130

Email : ************@*****.***

Telephone : +66-62-473-****

Date of Birth : August 24,1970

Nationality : Thai

Marital Status : Single

Height : 176 Cms

Weight : 72 Kgs

Summary Overview

A supervisor and engineer for 25 years of EPC &PMC experience. Skill in installation, pre-commissioning, Cold & hot Commissioning, start up of Process, Electrical, Instrumentation from oil and gas, FPSO, offshore, well testing, onshore, refinery, Coal fired power plant with Supercritical boiler 660 MW, Hydroelectric power 2x250 MW, Combined cycle power plant 120 MW, Biomass power plant 10 MW, Bio-Gas Power Plant 5 MW, Waste to Energy Power Plant 10 MW, Plastic process, Waste Water Treatment, HRSG, BOP, Boiler, FGD, Gas turbine, Steam turbine and Distribution Control System ( DCS ) & Human machine interface (HMI) & PLC Pro-logic control Panel, Permit to work control, Isolation tag, log-in and log-out, maintenance skilled in electrical, instrumentation and Control, Loop check, function check, interlock check, leak test, hydrostatic test, flushing, steam blow, chemical cleaning, machines equipment, piping, operate, process control with the highest safety and environment standards procedure.

Career Summary

Period: September 2024 – November 2024

Company: JST Group

Location: Thailand

Business: Offshore.

Position: Lead Commissioning Engineer

Responsibilities:

Management, reviews document, planning, reports, coordinate and supervise sub-contactor of all activity in commissioning, start-up with administrator manual turnovers completion packaged international standard to Client in electrical, instrumentation control, Process, qualities control, QC inspection with ITP, coordinate with supplier, vendor, client, sub-contractor, material onsite an inspection, switch gear, Control Panel, hook up, cable tray, JB, wiring, commissioning, start up, checked HMI graphic, Logic switching system, Interlock system, Function testing, Instrument termination, Instrument control loop, JB and instrument equipment inspection, Cable wiring inspection, Cable tray inspection, Digital input checked, Digital output checked, Analog in and out checked, DCS, Single Line diagram, Loop drawing, P&ID, PFD checked with the highest safety and environment standards procedure.

•Reviews and commented of document, P&ID, PFD, Sigle Line Diagram, Loop Drawing, Hook up drawing and Provided method statement, procedure, checking list, document submit in handover book the Client.

•Management and supervise sub-contractor manpower supplies for work and progress schedule.

•Coordination supports all commissioning preparation.

•Technical skilled support client and sub-contactor.

•Risk analysis HSE for PC&C management and HSE Control Zero accident.

•PTW (permit to work) control and Coordinate

•LOTO, tag-in & tag-out, padlock system

•Control HSE and safety under supervision

•Oversee day-to-day for Process, Mechanical, electrical and instrument, commissioning activities and progress of project.

•Modified and find solution a problem and acceptation details by the client

•Collaborate and coordinate with internal and external parties, EPC contractor, supplier and client.

•Control spec all equipment follow up by ITP standard.

•Inspection instrument control and loop control, function control.

•Digital input, output and Analog checked.

•Loop and Function checked electrical & instrument.

•Provided the Completion turnover package to Client and another document required.

•Function tested switch gears.

Period: October 2023 – September 2024

Company: Worley

Location: Thailand

Business: RTO System Packages For ESP & GSP6 project.

Position: Senior E&IC Supervisor and Inspector

Responsibilities:

Management, reviews document, planning, reports, coordinate and supervise sub-contactor all installation and commissioning, start-up with administrator manual turnovers completion packaged international standard to Client in electrical, instrumentation control, Process, qualities control, QC inspection with ITP, coordinate with supplier, vendor, client, sub-contractor, material onsite an inspection, switch gear, Control Panel, hook up, cable tray, JB, wiring, Pre-commissioning, start up, checked HMI graphic, Logic switching system, Interlock system, Function testing, Instrument termination, Instrument control loop, JB and instrument equipment inspection, Cable wiring inspection, Cable tray inspection, Digital input checked, Digital output checked, Analog in and out checked, DCS, Single Line diagram, Loop drawing, P&ID, PFD checked with the highest safety and environment standards procedure.

•Reviews and commented of document, P&ID, PFD, Sigle Line Diagram, Loop Drawing, Hook up drawing and Provided method statement, procedure, checking list, document submit in handover book the Client.

•FAT and SAT for the packaged

•Management and supervise sub-contractor manpower supplies for work and progress schedule.

•Coordination supports all commissioning preparation.

•Technical skilled support client and sub-contactor.

•Risk analysis HSE for PC&C management and HSE Control Zero accident.

•PTW (permit to work) control and Coordinate

•LOTO, tag-in & tag-out, padlock system

•Control HSE and safety under supervision

•Oversee day-to-day for electrical and instrument, installation and Pre-commissioning activities and progress of project.

•Modified and find solution a problem and acceptation details by the client

•Collaborate and coordinate with internal and external parties, EPC contractor, supplier and client.

•Control spec all equipment follow up by ITP standard.

•Installation and Inspection JB box, marshaling cabinet, tubing, valve, fitting and transmitter.

•Inspection instrument control and loop control, function control.

•Digital input, output and Analog checked.

•Loop and Function checked electrical & instrument.

•DCS graphic reviews and comment

•Cable wiring inspection

•Provided the Completion turnover package to Client and another document required.

•Function tested switch gears.

•Reviews and provide spare parts.

Period: May 2022 – May 2023

Company: AKS Services

Location: Thailand and Malaysia

Business: Waste & Water treatment Project.

Position: Lead E,I&C and Lead Commissioning

Responsibilities:

Management, reviews document, planning, reports, coordinate and supervise sub-contactor all installation and commissioning, start-up with administrator manual turnovers completion packaged international standard to Client of Waste & Water treatment in electrical, instrumentation control, Process, qualities control, QC inspection with ITP, coordinate with supplier, vendor, client, sub-contractor, material onsite an inspection, switch gear, Control Panel, hook up, cable tray, JB, wiring, Pre-commissioning, start up, checked HMI graphic, Logic switching system, Interlock system, Function testing, Instrument termination, Instrument control loop, JB and instrument equipment inspection, Cable wiring inspection, Cable tray inspection, Digital input checked, Digital output checked, Analog in and out checked, DCS, Single Line diagram, Loop drawing, P&ID, PFD checked with the highest safety and environment standards procedure.

•Reviews and commented of document, P&ID, PFD, Sigle Line Diagram, Loop Drawing, Hook up drawing and Provided method statement, procedure, checking list, document submit in handover book the Client.

•FAT and SAT for the packaged

•Management and supervise sub-contractor manpower supplies for work and progress schedule.

•Coordination supports all commissioning preparation.

•3D model Navisworks for construction

•Technical skilled support client and sub-contactor.

•Risk analysis HSE for PC&C management and HSE Control Zero accident.

•PTW (permit to work) control and Coordinate

•LOTO, tag-in & tag-out, padlock system

•Control HSE and safety under supervision

•Oversee day-to-day for electrical and instrument, installation and Pre-commissioning activities and progress of project.

•Modified and find solution a problem and acceptation details by the client

•Collaborate and coordinate with internal and external parties, EPC contractor, supplier and client.

•Control spec all equipment follow up by ITP standard.

•Installation and Inspection JB box, marshaling cabinet, tubing, valve, fitting and transmitter.

•Inspection instrument control and loop control, function control.

•Digital input, output and Analog checked.

•Loop and Function checked electrical & instrument.

•Cable wiring inspection

•Provided the Completion turnover package to Client and another document required.

•Planning schedule and solution troubleshooting on the project

•Function tested switch gears.

•Reviews and provide spare parts.

•Material balance and control.

Period: March 2021 – May 2022

Company: Audaxia

Location: Thailand and Singapore

Business: Ammonia stripper and Waste Water Treatment Expansion Project.

Position: Lead E,I&C and Lead Commissioning

Responsibilities:

Management, reviews document, planning, reports, coordinate and supervise sub-contactor and planning schedule of all activity scope of erection, Pre-commissioning, commissioning and start up process unite with administrator manual turnovers completion packaged international standard to Client in Process, piping, mechanical, electrical and instrumentation with ITP of Ammonia stripper, waste water treatment plant, chemical inject unite, qualities control, QC inspection, coordinate with supplier, vendor, client, sub-contractor, material onsite an inspection, switch gear, marshalling cabinet, hook up, cable tray, JB, wiring, Pre-commissioning, start up, checked DCS graphic, Logic switching system, Interlock system, Function testing, Instrument termination, Instrument control loop, JB and instrument equipment inspection, Cable wiring inspection, Cable tray inspection, Digital input checked, Digital output checked, Analog in and out checked, DCS, F&G system, ESD system, trouble shooting, improvement, calibration work, P&ID line check, LOTO, tag-in & tag-out, padlock system, PTW(permit to work) control with the highest safety and environment standards procedure.

•Reviews and commented of document, P&ID, PFD, Sigle Line Diagram, Loop Drawing, Hook up drawing and Provided method statement, procedure, checking list, document submit in handover book the Client.

•FAT and SAT for the packaged.

•Management and supervise engineering teams and sub-contractor manpower supplies for work and progress schedule.

•Coordination supports all commissioning preparation.

•3D model Navisworks for construction

•Reviews commissioning spare parts and two years spare parts.

•Planning and making the schedule of pre-commissioning and commissioning

•Reviews instrumentation process function control

•Setting up the logic for handover packaged document

•Technical skilled support client and sub-contactor

•Risk analysis HSE for PC&C management and HSE Control Zero accident.

•PTW (permit to work) control and Coordinate

•Control LOTO, tag-in & tag-out, padlock system

•Control HSE and safety under supervision

•Oversee day-to-day for erection piping, mechanical electrical, instrument, installation and Pre-commissioning, commissioning activities and progress of project.

•Modified and find solution a problem and acceptation details by the client

•Collaborate and coordinate with internal and external parties, EPC contractor, supplier, vendor, supplier and client.

•Provided the Completion turnover package to Client and another document required.

•Troubleshooting on the electrical and instrument control, mechanical rotating, process system.

•Control spec all equipment follow up by ITP standard and record for handover packaged.

•Material requirement spare parts checked for commissioning and 2 years spare parts.

•QC inspection and clearing the punch.

•Function tested switch gears.

•Final walkdown and SAT.

•Lotto, Tag-in and Tag-out control.

•Work permit coordinator and controlling.

Period: October 2020 – January 2021

Company: EP2C

Location: Singapore and Thailand

Business: Bang Pakong Replacement 1400 MW CCGT project.

Position: Project Site Engineer

Responsibilities:

Management, reviews document, planning, reports, coordinate and supervise sub-contactor all installation and commissioning, start – Up with administrator manual turnovers completion packaged international standard to Client of Water treatment and Sodium Hypochlorite Generator Package in electrical, instrumentation control, piping, mechanical, process operate, qualities control, QC inspection, coordinate with supplier, vendor, client, sub-contractor, material onsite an inspection, switch gear, Control Panel, hook up, cable tray, JB, wiring, Pre-commissioning, start up, checked HMI graphic, Logic switching system, Interlock system, Function testing, Instrument termination, Instrument control loop, JB and instrument equipment inspection, Cable wiring inspection, Cable tray inspection, Digital input checked, Digital output checked, Analog in and out checked, DCS, with the highest safety and environment standards procedure.

•Reviews and commented of document, P&ID, PFD, Sigle Line Diagram, Loop Drawing, Hook up drawing and Provided method statement, procedure, checking list, document submit in handover book the Client.

•FAT and SAT for the packaged and 3D model.

•Management and supervise sub-contractor manpower supplies for work and progress schedule.

•Coordination supports all commissioning preparation.

•3D model Navisworks for construction

•Technical skilled support client and sub-contactor.

•Risk analysis HSE for PC&C management and HSE Control Zero accident.

•PTW (permit to work) control and Coordinate

•LOTO, tag-in & tag-out, padlock system.

•Budget control

•Control HSE and safety under supervision

•Oversee day-to-day for erection piping, mechanical, electrical, instrument, installation and Pre-commissioning activities and progress of project.

•Modified and find solution a problem and acceptation details by the client

•Collaborate and coordinate with internal and external parties, EPC contractor, supplier and client.

•Control spec all equipment follow up by ITP standard.

•Material requirement spare part

•Hook up detail and inspection.

•Installation and Inspection JB box, marshaling cabinet, tubing, valve, fitting and transmitter.

•Inspection instrument control and loop control.

•Digital input, output and Analog checked.

•Loop checked instrument control.

•Loop check electrical control.

•PLC logic checking.

•Cable wiring inspection.

•Provided the Completion turnover package to Client and another document required.

•Interlock function checked.

•Function tested switch gears

•Erection, pre-commissioning, commissioning and start up Sodium Hypochlorite Generator Package.

Period: January 2020 – October 2020

Company: Toyo Engineering & Construction

Location: Rayong, Thailand

Business: BST Expansion Project.

Position: Electrical, Instrumentation & Control Supervisor

Responsibilities:

Coordinate and supervise sub-contactor all installation and commissioning with administrator manual turnovers completion packaged international standard to Client of electrical and instrumentation, process, water treatment plant, qualities control, QC inspection, coordinate with supplier, vendor, client, sub-contractor, material onsite an inspection, switch gear, marshalling cabinet, hook up, cable tray, JB, wiring, Pre-commissioning, start up, checked DCS graphic, Logic switching system, Interlock system, Function testing, Instrument termination, Instrument control loop, JB and instrument equipment inspection, Cable wiring inspection, Cable tray inspection, Digital input checked, Digital output checked, Analog in and out checked, DCS, F&G system, ESD system, trouble shooting, improvement, calibration work, P&ID line check, LOTO, tag-in & tag-out, padlock system,, PTW(permit to work) control with the highest safety and environment standards procedure.

•Reviews and commented of document, P&ID, PFD, Sigle Line Diagram, Loop Drawing, Hook up drawing and Provided method statement, procedure, checking list, document submit in handover book the Client.

•FAT and SAT for the packaged.

•Management and supervise sub-contractor manpower supplies for work and progress schedule.

•Coordination supports all commissioning preparation.

•3D model Navisworks for construction

•Technical skilled support client and sub-contactor

•Risk analysis HSE for PC&C management and HSE Control Zero accident.

•PTW (permit to work) control and Coordinate

•LOTO, tag-in & tag-out, padlock system

•Control HSE and safety under supervision

•Oversee day-to-day for erection electrical, instrument, installation and Pre-commissioning activities and progress of project.

•Modified and find solution a problem and accept ion details by the client

•Collaborate and coordinate with internal and external parties, EPC contractor, supplier and client.

•Troubleshooting on the electrical and instrument control system.

•Control spec all equipment follow up by ITP standard.

•Material requirement spare part

•Hook up detail and inspection.

•Installation JB box, marshaling cabinet and inspection.

•Inspection instrument control and loop control.

•Digital input, output and Analog checked.

•Loop checked instrument control.

•Loop check electrical control.

•DCS control panel pre-commissioning and start up.

•PLC logic checking.

•Cable wiring inspection.

•Provided the Completion turnover package to Client and another document required.

•Interlock function checked.

•Function tested switch gears.

•JB and instrument equipment inspection.

•Work permit coordinator and controlling.

Period: January 2019 – December 2019

Company: JDN (Jan De Nul Group)

Location: Thailand and Taiwan.

Business: Wind power WTG.

Position: Electrical & Instrumentation and inspector Supervisor.

Responsibilities:

Supervise sub-contactor all Installation, QC Inspection, Pre-Commissioning E&I, Technical Adviser, Coordinate, Supervise Contractor, Solution troubleshooting, planning in Electrical, Switch gear, No-load testing, Load testing, Loop testing, Function Testing, Interlock Dry function testing, PLC program loading, PTW(permit to work) control with the highest safety and environment standards procedure.

•Oversee day-to-day for erection electrical, instrument, installation and Pre-commissioning activities and progress of project.

•Collaborate and coordinate with internal and external parties, EPC contractor, supplier and client.

•Coordination supports all commissioning preparation.

•Reviews punch list management and TQ interface.

•Risk analysis HSE for PC&C management and HSE Control Zero accident.

•PTW (permit to work) control and Coordinate

•LOTO, tag-in & tag-out, padlock system

•Reviews inspection and testing requirements relating to Electrical & Instrumentation and Pre-commissioning.

•Participation and contribution in punch listing and plant testing.

•Reviews spare part list and provide support.

•Supervising Health, Safety and Environmental aspects relating to pre-commissioning activities, in partnership with project and site construction managers.

•Reviews of “as-commissioned" documentation to support the handover of systems from construction, through commissioning and into Client.

•Reviews As-builds drawing Electrical and Instrumentation.

•Control spec all equipment follow up by ITP standard.

•Reviews schedule SAT, Procedure, document, system turn over package.

•Management sub-contractor, tools, material, equipment on site.

•Inspection electrical, instrumentation.

•Function testing switchgear and interlock testing.

•Loop test and function test, calibration for instrument system.

•Inspection PLC control system and I/O list.

•Function tested switch gears

•Technical support and adviser to Commissioning EPC contractor.

•Provided the Completion turnover package to Client and another document required.

•Monitoring and Solution troubleshooting on Electrical and Instrumentation equipment in pre-commissioning.

•Coordinated with another department.

•Report to Site Manager.

Period: December 2017 – December 2018

Company: Marubeni Corporation Japan

Location: Thailand

Business: EPC Construction SCG Waste To Energy Fired Power Plant

Position: Lead Electrical, Instrumentation & Control Engineer / Lead Commissioning Engineer.

Responsibilities:

Management reviews document, reports, Coordinate and supervise, planning schedule of all activity scope of Installation, Commissioning and start up with administrator manual turnovers completion packaged international standard to Client of E,I&C, process, Operate DCS control Room, Technical Adviser, Coordinate, QC inspection, Supervise Contractor, Solution troubleshooting, planning in Piping, Mechanical rotation, Electrical, Switch gear, I&C, DCS Yokogawa Control, PLC program testing, Process, Boiler, SIEMENS, Steam Turbine, BOP, Water treatment (Reverse Osmosis, Membrane, UF Ultra Filtration), No-load testing, Load testing, Loop testing, Function Testing, Interlock Dry function testing, PID turning, Flushing, Leakages test Chemical Cleaning, Hydrostatic Pressure test, Steam blow, inspection & Boxing Up vessel, ESD system, P&ID line check, F&G system, PTW(permit to work) control, LOTO, tag-in & tag-out, padlock system with the highest safety and environment standards procedure.

•Oversee day-to-day for erection Piping, Mechanical rotation, electrical, instrument, installation and commissioning activities and progress of project.

•Reviews and commented of document, P&ID, PFD, Sigle Line Diagram, Loop Drawing, Hook up drawing and Provided method statement, procedure, checking list, document submit in handover book the Client.

•FAT and SAT for the packaged.

•Management and supervise sub-contractor manpower supplies for work and progress schedule.

•Coordination supports all commissioning preparation.

•3D model Navisworks for construction

•Risk analysis HSE for PC&C management and HSE Control Zero accident.

•Reviews commissioning and two years spare parts.

•Planning and making the schedule of pre-commissioning and commissioning

•Collaborate and coordinate with internal and external parties, EPC contractor, supplier and client.

•Reviews EPC Contractor’s installation, Commissioning & Completions; Management System.

•Reviews punch list management and TQ interface.

•Reviews inspection and testing requirements relating to Mechanical Completion and Pre-commissioning.

•PTW (permit to work) control and Coordinate

•LOTO, tag-in & tag-out, padlock system

•Participation and contribution in punch listing and plant testing.

•Reviews vendor representative support requirements, time schedule and cost forecast.

•Provided the Completion turnover package to Client and another document required.

•Reviews spare part list and provide support.

•Supervising Health, Safety and Environmental aspects relating to commissioning activities, in partnership with project and site construction managers.

•Reviews of “as-commissioned" documentation to support the handover of systems from construction, through commissioning and into operations.

•Reviews As-builds drawing Electrical and Instrumentation.

•Ensuring that Mechanical Completion, Pre-commissioning, Commissioning and Start-up procedures/requirements are appropriately developed by EPC Contractor and that the requirements are followed by contractors/suppliers

•Control spec all equipment follow up by ITP standard.

•Reviews and Provided method statement, procedure, checking list, document submit in handover book the Client.

•Reviews schedule, FAT, SAT, Procedure, document, system turn over package and P&ID follow.

•Planning, control progress and schedule of Commissioning and start up activity EPC contractor.

•Management progress in Commissioning Electrical, Instrumentation and control, process, Mechanical.

•Management sub-contractor, tools, material, equipment on site.

•Inspection electrical, instrumentation.

•Function testing switchgear and interlock testing.

•Loop test and function test, calibration for instrument system.

•Function tested switch gears

•Inspection PLC, DCS control system and I/O list.

•Reviews daily, weekly, three weeks, monthly report.

•Technical support and adviser to Commissioning teams and EPC contractor.

•Monitoring and Solution troubleshooting on process equipment in commissioning and start up.

•Turning process condition for operate.

•Control the HSE, safety, Scope of commissioning activity and clearing contract details of EPC contractor.

•Daily, Weekly, Monthly and Technical meeting.

•Training to employee of Customer for operating plant.

•Coordinated with another department.

•Report to Project Manager.

Period: January 2017 – December 2017

Company: KNM Renewable Energy Group

Location: Thailand & International country

Business: EPC Construction, O&M Services

Position: Commissioning Specialist and Commissioning Manager.

Responsibilities:

Management, reviews document, reports, and supervise sub-contractor, planning schedule of all activity scope in Commissioning and start up, Technical Adviser, Solution troubleshooting, FAT & SAT with administrator manual turnovers completion packaged international standard to Client of rotating equipment, E, I&C, Switch gear, DCS Yokogawa Control, PLC program testing, QC inspection, Process, Bioethanol, Waste Water treatment, Water treatment (Reverse Osmosis, Membrane, UF Ultra Filtration), Biogas Power plant, Boiler, BOP and Utility, Bio Gas, Oil and Gas, reciprocation compressor, Gas engine, No-load testing, Load testing, Loop testing, Function Testing, Interlock Dry function testing, PID Turning, Flushing, Leakages test Chemical Cleaning, Hydrostatic Pressure test, Steam blow, inspection & Boxing Up vessel, ESD system, P&ID line check, F&G system, PTW(permit to work) control with the highest safety and environment standards procedure.

•Oversee day-to-day for electrical, instrument, mechanical rotation, piping commissioning activities and progress of project.

•Collaborate and coordinate with internal and external parties, EPC contractor, supplier and client.

•Reviews and commented of document, P&ID, PFD, Sigle Line Diagram, Loop Drawing, Hook up drawing and Provided method statement, procedure, checking list, document submit in handover book the Client.

•Coordination supports all commissioning preparation.

•Risk analysis HSE for PC&C management and HSE Control Zero accident.

•FAT and SAT for the packaged.

•Management and supervise sub-contractor manpower supplies for work and progress schedule

•3D model Navisworks for construction

•Reviews commissioning and two years spare parts.

•Planning and making the schedule of pre-commissioning and commissioning.

•Reviews EPC Contractor’s Commissioning & Completions; Management System.

•Reviews punch list management and TQ interface.

•Reviews inspection and testing requirements relating to Mechanical Completion and Pre-commissioning.

•Budget control

•Participation and contribution in punch listing and plant testing.

•Reviews vendor representative support requirements, time schedule and cost forecast.

•Reviews spare part list and provide support.

•Provided the Completion turnover package to Client and another document required.

•PTW (permit to work) control and Coordinate

•LOTO, tag-in & tag-out, padlock system

•Supervising Health, Safety and Environmental aspects relating to commissioning activities, in partnership with project and site construction managers.

•Reviews of “as-commissioned" documentation to support the handover of systems from construction, through commissioning and into operations.

•Ensuring that Mechanical Completion, Pre-commissioning, Commissioning and Start-up procedures/requirements are appropriately developed by EPC Contractor and that the requirements are followed by contractors/suppliers

•Control spec all equipment follow up by ITP standard.

•Provided method statement, procedure, checking list, document submit in handover book the Client.

•Reviews schedule, FAT, SAT, Procedure, document, system turn over package and P&ID follow.

•Planning, control progress and schedule of Commissioning and start up activity EPC contractor.

•Management progress in Commissioning Electrical, Instrumentation and control, process, Mechanical.

•Management sub-contractor, tools, material, equipment on site.

•Inspection piping, electrical, instrumentation, mechanical rotation.

•Function testing switchgear and interlock testing.

•Loop test and function test, calibration for instrument system.

•Inspection PLC, DCS control system and I/O list.

•Reviews daily, weekly, three weeks, monthly report.

•Technical support and adviser to Commissioning teams and EPC contractor.

•Monitoring and Solution troubleshooting on process equipment in commissioning and start up.

•Turning process condition for operate.

•Control the HSE, safety, Scope of commissioning activity and clearing contract details of EPC contractor.

•Daily, Weekly, Monthly and Technical meeting.

•Training to employee of Customer for operating plant.

•Coordinated with another department.

•Report to CEO.

Period: April 2016 – November 2016

Company: Siam Scandinavian Construction and Business.

Lamtakong Jolabha Hydroelectric Power Plant Project 3-4/500 MW

Location: Nakornratchasima, Thailand

Business: EPC construction

Position: Lead Electrical, Instrumentation & Control Project Engineer and Deputy Construction Manager.

Responsibilities:

Management, reviews document, reports, and supervise sub-contractor, planning schedule of all activity scope of Installation, Assembly part and commissioning with administrator manual



Contact this candidate