ELECTRICAL SUB ENGINEER
WatsApp +966********* watsApp No. +923*********
Email ID: ***************@*****.***
PERSONAL INFORMATION
NAME : GHULAM ALI BUGHIO
DATE OF BIRTH : 08.05.1983
EDUCATIONAL QUALIFICATION : DAE. (ELECTRICAL)
DRIVING LICENCE : KSA, PAKISTAN
GEOGRAPHICAL AREAS OF WORK : QATAR, KSA AND PAKISTAN
TOTAL YEARS OF EXPERIENCE : 18 YEARS
JOB PROFILE:
I have more than 18 years of experience in the field of Projects & Maintenance, Commissioning & Start-up activities in Electrical system in oil & Gas petrochemical & Power Generation Sector. I have strong technical & communication skills to lead the multicultural team for TAR Maintenance & Projects in a challenging Environment.
Installation, Testing, Commissiong of Major Electrical Equipment like Transformer, Switchgears, Tie Breakers, Isolators, Insulators, Breakers (MCC & EMCC), VFD Panel, UPS & Battery bank, Load bank, Capacitor banks, Diesel generator, Motors, Compressor, Low & High voltage Electrical Panels, Cooling Tower fans, Fin Fan etc.
Preventive maintenance of Motors, Transformers, Generator, Lightings, cables, MOV, Electrical wirings, distribution boards
Motor solo runs & functional tests of electrical equipment
Trouble shootings of all electrical equipment with safety one line diagram
AREAS OF EXPERTISE INCLUDE:
Construction
Pre-commissioning & Commissioning
Maintenance
Soft Skills
COURSE & TRAINING:
Electrical Supervisor
Electrical Wireman
Work Permit
Electrical Arc Flush Hazzard Protection
Electrical Shock Hazzard Protection
Respiratory Fit Test
JUNE 2024 TO TILL NOW WORK AT COMPNY REDESA GLOBAL SAUDIARBIA PSITION ELECTRICAL SUB ENGINEER PROJECT IRELAND SHEBARA ISLAND OFFSHORE SHURA IS LAND
Experience & Responsibilities
JUNE 2023 TO JUNE 2024
COMPANY : ENGIE COFELY MANNAI QATAR DOHA
POSITION : ELECTRICAL SUPERVISOR
PROJECTS WORKED :
1.PREVENTIVE MAINTENACE WORK OF EDUCCATION DEPARTMENT
RESPONSIBILITIES:
Preparing & Submitting Daily Progress Report to Field Engineer
Taking care of given tasks within HSE standards of the company
Co-ordination with project planning team for the work volumes. Man-hours and days required to execute the job.
Preparation of MTO & Procurement of the material required to execute the job.
Fabrication and Installation of Supports, Bus ducts, cable ladders & trays for primary and secondary cables.
Installation & Maintenance of small power and lighting systems
Installation & Termination of electrical junction boxes & electrical panels etc
Laying of HV/LV primary and secondary cables underground and above ground.
Installation & Commissioning of earthing system includes earth pits, earth grid installation, Cad welding etc
Hands on knowledge on electrical Testing devices by using Megger meter, Micro meter, Neon high voltage hot stick tester, malty meter, clump meter, micro-ohms meter.
Witnessing MV &LV Motor solo runs & functional tests of electrical equipment
Maintenance of Major Electrical Equipment like Transformer, Switchgears, Tie Breakers, Isolators, Insulators, Breakers (MCC & EMCC), VFD Panel, UPS & Battery bank, Diesel generator, Motors, Compressor, Low & High voltage Electrical Panels etc.
MARCH 2020 TILL APRIL 2023
COMPANY : SIEMENS ENGINEERING COMPANY LIMITED, PAKISTAN
POSITION : ELECTRICAL SUPERVISOR
PROJECTS WORKED:
1.EPC OF 2 660 MW COAL FIRED POWER PROJECT
RESPONSIBILITIES:
Preparing & Submitting Daily Progress Report to Lead Engineer
Conduct toolbox meetings with subordinates to discuss the work methodology and safety Hazards.
Taking care of given tasks within HSE standards of the company
Preparation of work pack with approved AFC drawings as per Client standard & procedures.
Preparation and getting approval of package (Method Statement & JSA) for work permit.as per Client standard & procedures.
Co-ordination with respective discipline to execute the activities without any SIMOPS and any delays.
Co-ordination with project planning team for the work volumes. Man-hours and days required to execute the job.
Preparation of MTO & Procurement of the material required to execute the job.
Reviewing of project drawing and documents for installation of electrical and instrumentation systems.
Raising Technical Queries for missing inputs in project scope and engineering drawings.
Installation & termination of Major Electrical Equipment like Transformer, Switchgears, Tie Breakers, Isolators, Insulators, Breakers (MCC & EMCC), VFD Panel, UPS & Battery bank, Load bank, Capacitor banks, Diesel generator, Motors, Compressor, Low & High voltage Electrical Panels, Cooling Tower fans, Fin Fan etc.
Preparation and installation of temporary HVAC system, temporary power supply for project requirement.
Fabrication and Installation of Supports, Bus ducts, cable ladders & trays for primary and secondary cables.
Installation of small power and lighting systems including high mass pole installation
Installation of electrical junction boxes, equipment welding sockets and small power sockets.
Laying of HV/LV primary and secondary cables underground and above ground.
Installation of earthing system includes earth pits, earth grid installation, Cad welding etc
Installation of Sky Lightning Protection works for substation
Hands on knowledge on electrical Testing devices by using Megger meter, Micrometer, Neon high voltage hot stick tester, malty meter, clump meter, micro-ohms meter.
Witnessing MV &LV Motor solo runs & functional tests of electrical equipment
Testing & Commissioning of earthing & lightning System
Testing, Commissiong of Major Electrical Equipment like Transformer, Switchgears, Tie Breakers, Isolators, Insulators, Breakers (MCC & EMCC), VFD Panel, UPS & Battery bank, Load bank, Capacitor banks, Diesel generator, Motors, Compressor, Low & High voltage Electrical Panels, Cooling Tower fans, Fin Fan etc.
APRIL 2015 TILL DECEMBER 2019
COMPANY : SADARA PETROCHEMICAL, KSA
POSITION : ELECTRICAL TECHNOLOGIST
PROJECTS WORKED :
1.MIXED FEED CRACKER PLANT
RESPONSIBILITIES:
Supervising the Testing Solo run, visual inspection, Pre-Commissioning, Commissioning & Start-up activities of the all-electrical equipment’s & breakers up to 220 KV voltage
Managed and controlled all electrical equipment’s in mixed feed crackers process.
Complete ownership of substation 34.5 KV and collaborated maintenance activities.
Transient UPS Functional checking and commissioning
Commissioning for VFD’s for furnace ID fans.
Preventive maintenance of Motors, Transformers, Generator, Lightings, cables, MOV, Electrical wirings, distribution boards
Switching of Emergency MCC switch gears, breakers, Tie breaker, synchronize system,
Raked in and out of switch gears, work at static switch, feeder’s protection transformer protection, motors protection relies.
Maintenance work of power transformers, CT, PT, TP2, and relay sating’s transformers, motors
Coordination with OEM Vendors like ABB; Powell; Wesco’s; GE; Siemens, Schneider, Eaton.
Maintenance of AC equipment of different voltage limits ( i.e 24 volts, 110 volts, 220 volts, 480 volts, 4.16 KV, 13.8 KV, 110 KV, 220 KV & 230 KV)
Maintenance of DC equipment of different voltage limits (i.e.12 volts, 24 volts, 110 volts, 220 volts)
Setting out the GE Multiline 300 Feeder management relays, GE Multiline 745 Transformer management Relays, GE Multiline 369 & 469 Motor management relay & MM2 Motor management relays.
Trouble shootings of all kinds’ electrical equipment.
APRIL 2010 TILL MARCH 2015
COMPANY : M.S.AL. SUWAIDI INDUSTRIAL SERVIES CO.LTD, KSA
POSITION : ELECTRICAL SUPERVISOR
PROJECTS WORKED :
1.PREVENTIVE MAINTENANCE OF 25 OIL REFINERY- SAUDI ARAMCO
2.TURNAROUND OF SAFCO FERTILIZER- SABIC
3.TURNAROUND OF SADAF PETROCHEMICAL- SABIC
4.PREVENTIVE MAINTENANCE OF ALCOA - MAADEN ALUMINUM
5.TURNAROUND OF IBIN E ZAHAR- SABIC
RESPONSIBILITIES:
Preparing & Submitting Daily Progress Report to Lead Engineer
Conduct toolbox meetings with subordinates to discuss the work methodology and safety Hazards.
Taking care of given tasks within HSE standards of the company
Preparation of work pack with approved AFC drawings as per Client standard & procedures.
Preparation and getting approval of package (Method Statement & JSA) for work permit.as per Client standard & procedures.
Co-ordination with respective discipline to execute the activities without any SIMOPS and any delays.
Installation of Supports, Bus ducts, cable ladders & trays for primary and secondary cables.
Installation of small power and lighting systems including high mass pole installation
Installation of electrical junction boxes, equipment welding sockets and small power sockets.
Laying of HV/LV primary and secondary cables underground and above ground.
Installation of earthing system includes earth pits, earth grid installation, Cad welding etc.
Periodic maintenance of LV, HV switch board, DB and lighting / small power system and emergency service power network.
Testing, Pre-commissioning & Commissiong of Major Electrical Equipment like Transformer, Switchgears (33KV, 11KV, 415V), Tie Breakers, Isolators, Insulators, Breakers (MCC & EMCC), VFD Panel, UPS & Battery bank, Load bank, Capacitor banks, Diesel generator, Motors, Compressor, Low & High voltage Electrical Panels, Cooling Tower fans, Fin Fan etc.
Preformed the different type of electrical Testing by using Megger meter, Micro meter, Neon high voltage hot stick tester, malty meter, clump meter, micro-ohms meter.
Preventive maintenance of Motors, Transformers, Generator, Lightings, cables, MOV, Electrical wirings, distribution boards, fin fan, low & high voltage panels
Maintenance of AC equipment of different voltage limits ( i.e 24 volts, 110 volts, 220 volts, 480 volts, 4.16 KV, 13.8 KV, 110 KV, 220 KV & 230 KV)
Maintenance of DC equipment of different voltage limits (i.e.12 volts, 24 volts, 110 volts, 220 volts)
Maintenance of plant equipment grounding systems.
Setting out the GE Multiline 300 Feeder management relays, GE Multiline 745 Transformer management Relays, GE Multiline 369 & 469 Motor management relay & MM2 Motor management relays.
Preparation of Redline Markup & As-built drawing based on site conditions.
AUG 2000 TILL JUNE 2005
COMPANY : QALANDRI COTTON FACTORY, PAK
POSITION : WIREMAN ELECTRICIAN
PROJECTS WORKED :
1.PREVENTIVE MAINTENANCE OF QALANDRI COTTON FACTORY
RESPONSIBILITIES:
Preventive maintenance of Motors, Transformers, Generator, Lightings, cables, MOV, Electrical wirings, distribution boards, low & high voltage panels
Maintenance of AC equipment of different voltage limits ( i.e 24 volts, 110 volts, 220 volts, 480 volts, 4.16 KV, 13.8 KV, 110 KV, 220 KV & 230 KV)
Maintenance of DC equipment of different voltage limits (i.e.12 volts, 24 volts, 110 volts, 220 volts)
Maintenance of plant equipment grounding systems.
Full name
Mobile number
Email ID
Highest Education
Total experience in years
Total years of Onshore Yard experience
Total years of experience in Oil & gas industry
Current company
Current Job location
Home location
Discipline (Mechanical/Electrical)
Current salary
Expected monthly salary in USD
Notice Period
Nationality
Training certifications if any (Non expired)
Passport Number (In Capital letters)
Ghulam Ali Bughio
***************@*****.***
BA
14 years
04years
10 years
Offshore Redsea Global
Redsea Offhore Umuj KSA
CVH CamP Redsea
Electrical
4500 SAR
Up To 1500 $ Monthly
One Month
Pakistani
Electrical Supervisor . Electrica Aric Fiash Protction . Eletrical Shork Protction .Respeatrio . Inspecte Toolls . And PPE .Hot Cld Conf Sp WorkPermits . Eectrical Testing Meeters
Caps ock