Objective:
To obtain a responsible position in growing dynamic company, where I could utilize my skills and + 20 years’ experience in Engineering. Design and Construction
Registrations:
P.E. # 40554-006 (Wisconsin).
OSHA Training Program - 10 Hour (# 34-003******).
INDOT Certified Technician Program (4 Exams passed)
Certificate of E-BUILDER for Construction Phase
IDOT Certificate of Documentation of Contract Quantities to: 11/30/2021;
Standards:
WisDOT, IDOT, ISTHA, CDOT, FAA, MWRD, CDWM.
COMPUTER SKILLS:
Strong in: Microsoft Office (with VBA); MicroStation, SS10, AutoCAD (101; 102), Civil 3D, ProjectWise, CDOT database.
Education:
B.S. in Civil Engineering Ukrainian State University of Construction & Architecture.
Employment History:
Delta Engineering LLC.
Sr. Civil Designer
10/2020-11/2023
SPAAN Tech, Inc., IL
Sr. Civil Engineer / Constr. Inspector 7/2014-10/2020.
Dynasty Group Inc., IL
Civil Engineer 2/2012-3/2014.
Parsons Inc., IL
Civil Engineer 7/2010-6/2012.
Earth Tech (Wastewater Department) Design engineer
8/2007-12/2009.
Bloom Companies LLC,
Milwaukee WI, Civil Engineer,
9/2004-8/2007.
Senior Civil Engineer with over 20 years of design and construction managing engineering experience in: Transportation, Storm Drainage and Water purification/Wastewater treatment technology. Working independently or under limited supervision. Solid technical and CAD design skills. In work focus on moral ethical principles, project cost reduction, safety in operating and maintaining comfort. Interest in design position as senior civil engineer.
Design Experience:
INFRASTRUCTURE ENGINEERING INCORPORATED (05/20/2024 – Present).
Sanitary Sewer Design Role –Sr. Civil engineer I.
YLIN, CTA, RLE YS120 Shop & Yard Design, Phase II.
Prepared sanitary sewer profiles for 12 in. pipes.
Used Open Roads and ProjectWise Explorer
Calculated MH’s invert elevations used Excel spreadsheet.
TEKOS LLC Ukraine, Kyiv (03/06/2023 – 04/15/2024).
Prepared engineering drawings for Wastewater Treatment Facilities. Role –civil designer
Used ProjectWise to coordinate and manage design in a common environment.
Created sets of engineering drawing such as: General, Civil, Electrical, Mechanical. Ph. II.
Worked with AutoCAD, and Bluebeam PDF software.
Imported PDF and Image files to .dwg /. dgn formats.
DELTA ENGINEERING GROUP LLC (10/2020-11/2023)
Street renovation design Role – leader civil designer.
07/10/2020-/11/2023; Chicago CDOT, WPA projects, (Length - 3800 l. ft.)
Provided geometric design to meet minimum longitudinal and cross slope requirements.
Produced roadway alignments and profile used GEOPAK.
Redesigned existing ADA ramps for compliance of slope.3
Performed QA/QC for survey production.
Sanitary Sewer Design Role – leader civil designer.
03/20/2021-05/11/2023; CDWM, sanitary sewer design engineering services, five locations.
Prepare final civil documentation for the sewer projects Phase II.
Coordinated with OUC and other utility agencies for conflict resolution.
Redesigned existing ADA ramps for compliance of slope and detectable tile.
Provided geometric design to meet minimum longitudinal and cross slope requirements for positive drainage; Checked inlet spacing.
SPAAN Tech, Inc., IL (7/2014-11/2020),
04/2019-08/2020; IDOT, Drainage system design for intersection of Roberts Road and 87th ST. (phase II), (Subcontract to AECOM); Role–sr. civil engineer.
12/2018-04/2020; IDOT, Drainage system design for intersection of I-55 and Lemont Rd. (phase II), (Subcontract to TYLin); Role–sr. civil engineer.
Analyzed existing and proposal situation, calculated inlet spacing to locate proposal structures and pipes as needed.
Prepared pipe layout, pipe’s profiles used MicroStation.
Generated schedules for removal items and proposed structures and proposed pipes.
Sewer Collection System and Wastewater Treatment Facilities design. Role–sr. civil engineer.
03/2018 – 7/2020, MWRD, (Sub. to AECOM). Phosphorus Removal Study in the Stickney WRP, conceptual design; Role – senior civil engineer.
Analyzed record drawings to verify the volumes of aeration batters, RAS and WAS system and provide existing plant description.
Developed Disk Filter Facility as tertiary treatment after entering the FeCl3 liquid; the facility includes Pimp station with vertical pumps and disk compartment.
Estimated quantity, footprint, maintenance requirement, and energy use for tertiary disk filters.
Communicated with manufacturers to get the quotes for cost estimates.
01/2017 – 10/2018, MWRD, (Sub. to Black & Veatch). Phosphorus Removal conceptual design in the O’Brien WRP, Role – senior civil engineer.
Developed Ferric Chloride system (12,000 gal/day) for a chemical feed to reduce phosphorus contamination to 0.1 mg/l in effluent. The facility includes pump station, 10-days storage for 45% of FeCl3 and piping distribution system; All calculation based on EPA Design Manual for Phosphorus Removal.
Determined the location of the dose points based on the study of the existing situation;
Developed Ferric Chloride system (12,000 gal/day) for a chemical feed to reduce phosphorus contamination to 0.1 mg/l in effluent. The facility includes pump station, 10-days storage for 45% of FeCl3 and piping distribution system; All calculation based on EPA Design Manual for Phosphorus Removal.
Determined the location of the dose points based on the study of the existing situation.
Calculated TDH and selected type and quantity of pump based on design flow and considering the strongly acidic aggressive environment, assigned the diameters and type of pipes, placed valves and fittings.
Located facility on the O’Brien site.
Communicated with manufacturers to get quotes.
Prepared building layout and quantities for capital cost estimation.
Created illustrations for the report using Google Ears and AutoCAD.
09/2019 – 11/2020 ADA ramps and Crosswalk enhancement. County of Cook, IL. Wheeling Rd. and Euclid; Euclid Ave. and Burning Bush Ln. Phase II
Calculated ADA ramp slopes.
Prepared completed drawing set. Computed quantities.
Made QA/QC of calculations and drawings.
4/2018 – 2/2020, Chicago MWRD, (Sub to Greeley & Hansen), Biological Phosphorus Removal Program for Hanover WRP, Lemont WRP, Calumet WRP; conceptual design, Role – senior civil engineer.
Converted raw lab data of wastewater contaminants into monthly, seasonal, and annual average basis concentrations Used Microsoft Excel / VBA to automatically sort and visualized the data.
Provided list of technologies based on references such as USEPA Emerging Technologies for Wastewater Treatment and In-Plant Wet Weather Management (EPA 832-R-12-011), USEPA Phosphorus Removal Design Manual (625-1-87-001), and experiences of the district.
Identified phosphorus removal methods to consistently meet a potential future effluent TP limit of 1.0 mg/L, 0.5 mg/L, 0.3 mg/L and 0.1 mg/L on a monthly, seasonal, and annual average basis. Developed two treatments from combinations of biological, chemical (Ferric chloride FeCl3), and tertiary treatment.
Dynasty Group Inc., IL (2/2012-3/2014)
03/2012-04/2014; Widening I-88 (phase II), ISTHA; Designed storm system; civil engineer.
Estimated Runoff for small watersheds, computed time of concentration.
Checked existing pipe diameters used HY-8; HYDRA; TR-55 for hydraulic computation and prepared plan and profiles.
Computed volume of existing ditch used Average End Area Method.
Determined concrete open channel size used Manning formula.
Placed proposed facilities on existing plan. Used AutoCAD.
Estimated quantity, footprint, maintenance requirement, and energy use for tertiary disk filters.
Streets and Roads design; Role – sr. civil engineer.
03/2012–03/2014, Special Request Design Projects for CDOT; (Subcontract to HDR). Those engineering tasks included:
ADA Ramps and Crosswalk Improvements.
Street Resurfacing,
Curb Extension.
Trees and Planters placement.
Diagonal Parking layout and Traffic Circle Development. Bump-outs design.
Created utilities plans based on record drawings, atlases and field observations.
2/2012 – 6/2012, IL Rte. 38 at UPRR & Kautz Road Reconstruction – Phase I, (Length - 650 l. ft.), Civil engineer
Assisted surveyor and provided roadway design services. Converted XYZ files from field to DATA, Created TIN file, Modified and corrected DATA files and TIN file by using GEOPAK COGO, produced survey plan, Generated Road Alignments in GEOPAK and corrected errors.
CDOT, New Streets construction Civil engineer
W.117th, From S. Longwood Dr. to S Hale Ave. Phase II (Length - 650 l. ft.), Civil engineer 7/2012 – 3/2013.
W.118th, From S. Longwood Dr. to S Hale Ave. Phase II, (Length - 532 l. ft.), Civil engineer 7/2012 – 3/2013.
Provided vertical and horizontal street design. Modified of on street and off-street elements such as parkways, alleys, driveways, sidewalks and so on, based on City of Chicago Street and Site Plan
Designed ADA Ramps, Crosswalk, and pavement marking.
Relocated existing catch basins, manholes, inlets, and other drain structures within paving areas, recalculated all structures to provide acceptable riding surface with proper drainage.
Produced complete set of drawings and calculated quantity and cost estimate.
Participate as construction inspector in Phase III.
Parsons Inc., IL Civil Engineer 7/2010-6/2012.
Airport Service Road design; Role –civil engineer.
09/2011–06/2012 Springfield Capital Airport, runway 04; FAA; Designed modifications required for LIR Towers located inside RW 22, RW31 and RW 4 runway safety area (RSA) to meet frangibility requirements (90% documentation) (Civil design engineer);
Prepared final construction plans including general notes, and civil set.
Demolition plans, quantities, cross sections, and grading plans.
Earth Tech (Wastewater Department) Design engineer 8/2007-12/2009.
08/2007-12/2009; Stickney Sludge Treatment Facility reconstruction - MWRD; Designed RAS sludge pump station using existing sludge tanks. Phase II, Role – civil engineer.
Analyzed record drawings to define the elevations and calculate the Static Discharge Head. Studied existing situation and utilities position.
Located the pumping station on the site to minimize the friction loss.
Traced the forced flow mains, basing on design flows, assigned the diameters and type of pipes, placed valves and fittings.
Calculated velocity in the pipes and then determined minor losses, pipe friction losses, velocity head losses at the pipe outlet to combine those losses into Total Dynamic head to define the pump sizing.
Computed pump power requirement to recognize pump sizing.
Selected pump using manufacturer pump curves.
Graphical merged both the system curve and pump curve to create operation points.
Determined pump pit dimensions and created equipment layout based on Recommended Standards for Wastewater Facilities.
Used AutoCAD for the drafting.
Bloom Companies LLC, 9/2004-8/2007
Facility Design; Role – surveyor / civil engineer.
09/2004-04/2005, WisDOT, Potawatomi parking lot (895 stalls) – Milwaukee, WI; (W. Pittsburgh Ava. And 20th Street) Phase I,
Measured Northing, Easting and elevation of points and based on point data modeled terrain.
Arranged and computed travers.
Determined of natural features and man-made structures of a property, showing their relative positions and elevations.
Prepared utility coordination used atlases.
Cared and adjusted equipment.
Produced site civil set of drawing.
Designed drainage system. Calculated pipe diameters, volume of detention pond, acquired quotes for the equipment of pumping station.
Provided quantity and cost estimate for the pavement, pavement marking and drainage system.
05/2005-12/2006, University of Wisconsin Parking Lot (500 stalls) Whitewater, WI.
Prepared parking lot layout design.
Designed drainage system for parking lot. Located catch basins and inlets.
Calculated quantity and cost estimate for parking lot.
Created complete set of drawings used AutoCAD.
12/2005-05/2007, Western Illinois University in Macomb, IL, Arts Center building; Phase II
Prepared final construction plan drawing set including general, civil, demolition plan, quantities, cross sections and grading plans.
Detail storm sewer design including calculations of Rainfall-Runoff Modeling, Used TR-55 Tabular Method, Diameters of the pipes, Culvert and structures and located inlets.
02/2009–11/2009, CDOT; Streetscape design of Pearson Street between State St. and Little Michigan Ave, (Length-1120 l. ft.), Phase I and Phase II; (Civil design engineer subcontract to Hoerr Schaudt);
Participated in field reviews and studies.
Performed field activities such as observation and record of existing field conditions, measurement and sketching existing situation and verification within project area as necessary.
Executed land surveying by using basic tools, optical equipment and GPS receivers.
Identified underground utilities based on record drawings provided by Office of Underground Coordination (OUC) and field observations.
Analyzed existing conditions and based on WisDot, IDOT and CDOT assignments, criteria and regulations, developed design solutions which coordinated with the manager.
Prepared vertical and horizontal road alignment; Used GEOPEK Road Tools, Interpolated heights when created vertical alignment;
Prepared cross-sections and profiles used GEOPAK.
Create 3D models in GEOPEK, Converted XYZ files to DAT and then created TIN file.
Coordinated work with outside consultants including building architects, landscape architects, and MEP consultants and attend meetings as needed.
Construction Inspector / Office engineering assistant
Parsons Inc., IL Civil Engineer 7/2010-6/2012.
FAA, ORD modernization program.
07/2010-06/2012, South Airfield, RUNWAY 10R-28L, Remote transmitter and receiver (RTR-S), Equipment Room and Generator Room Construction; Role - Construction Inspector.
07/2010-04/2012, South Airfield, RUNWAY 10R-28L, TW ZS; FAA/CED Duct-bank construction
07/2010-02/2012, RUNWAY 10C-28C - CENTER. RW 28C ALS, Area between TW, S4 and RW 4R-22L, RW STA. 625+45.0 Construction of duct bank and hand-hole system. - FAA construction inspector.
Controlled correctness of QC tests for HMA, PCC, AGG, Steel Member Producers, and Pipe and Precast Concrete Producers, compared the results with specification and special provision, all violation and discrepancy informed RE.
Measured depth, length width, slopes of structures footprints, used surveying level to verify grading elevations.
Generated accurate daily records in field book and inspection forms (IDR, T&M, Traffic Control inspection).
Created Daily Activity Reports. Assisted RE / CM to prepare and schedule Weekly Progress / Book meetings in E-builder. Used E-builder to find necessary documents (such as Pay Item delivery ticket, certification, Pay Estimates, Reports and the like) to maintain Quantity Book and other documentation.
Used surveyor database, GEOPAK and MicroStation to prepare “Record Drawings” documentation and for verification of final measurements.
SPAAN Tech, Inc., IL (7/2014-11/2020),
Tree Planting and Landscaping inspection construction inspector / assistant office manager
04/2018–07/2019; ISTHA, I-90, Tree Planting, MP53.8 to MP53.1;
04/2018–07/2019; ISTHA, I-90 West Bioswale Improvements, Elgin Plaza 9 to IL 53.8, MP 53; Leader of Construction Inspectors,
Repaired of existing Bios-Wales, Various planting of plugs and seeding, Culvert cleaning, Weed Control.
Facilities construction inspection
06/2014–02/2015; ISTHA, I-90 Reconstruction, MP18.5 to MP53.1 Intermediate Power Distributions and Communication (IPDC) Facility Installation; Role - Office Engineer.
Field Inspector on Tollway System
03/2015-04/2017, ISTHA, inventory field inspector, under subcontract to AECOM.
Obtained inventory data of Tollway structures, used land surveying equipment and digital camera with build-in GPS.
Created parent / child records in CarteGraph database.
Confirmed structure locations on Google Earth using KMLCSV and CoordTrans V2.3 software to convert geographic coordinates between different coordinates systems.
Built and organized Excel (*.csv) files for importing data to CarteGraph database.
Maintained CarteGraph databases for Tollway facilities, buildings, support equipment and bridges.