Post Job Free
Sign in

A Dedicated Tech 2

Location:
San Jose, CA
Salary:
28-30
Posted:
November 30, 2024

Contact this candidate

Resume:

Arlene F. Evangelista

****, ******* ***** *** ****, CA. 95116

Phone: 408-***-****

***************@*****.***

OBJECTIVE: Production Assisting

Summary:

A dedicated employee who understands my role and responsibilities, as well as the mission and vision of the company. Hard worker and works well with others to accomplish the company goals and maintain high quality standards.

EXPERIENCE

OLYMPUS SURGICAL TECHNOLOGIES AMERICA

ENDOSCOPE TECH 1: 5325 Hellyer Ave. San Jose, Ca. 95138 04/08/2024-09/06/2024

NS-Docking Process:

BTS: Built to Stock BTO: Built to Orde

SO: Service Order Number FN: Factory Number

NS unit: Insertion Tube B/S: Bending Section

K-Mount unit installation-BCU CCD Cable Braid Installation

Angle Wire Docking Temporary Grip Assemnbly

LG Tube Stuffing A-Lever Installation

Label Attachment Protector Attachment

Tools: Phillips Screw, flier, tube expander, docking holder, BCU on the docking, soldering iron, ruler, heat gun, coil pipes, wire cutter, torgue(9.0cm/0.60k)

Chemicals: Nejilock, KE-45B, alchohol, grease

JOHNSON MATTHEY COMPANY

Manufacturing Component Tech 2: San Jose, CA. 08/12/2018-01/26/2024

Machine Operations: Shape settings: spiral, cutting length, heat furnace, etching, ultrasonic, IPA Isopropyl, hooks, etc.

Hooks: Heat salt pot, microscope inspection

Unique materials: cutting machine, measuring tools (pin gauge), caliper, and ruler.

Packaging & Labeling

Finishing Cell: COMCO: Slurry Blasting: De-rod, CREGANNA, MEDTRONICS

SOLARCITY/TESLA

Process Tech 2 (Module Side): Fremont, CA. 01/16-06/18

Assemble the required detail material to lay up the functional build.

Processed Hot Bar, soldering, flaxing, measuring, inspect for broken cells, wafer/strings, holes, cracks and misalignment before assemble. Module Lay Up is a process to assemble a solar panel and solar tiles.

Certified on automation and manual process.

Lay up parts in accordance with the (SOP) Standard Operating Process. Wetlso-to process clean wafers from (EPC) Electonic Copper Plater, with chemicals such as sulfuric acid and hydrocloric acid.

Western Digital (Agency Kelly Services)

Manufacturing Tech: Fremont, CA. 2010-2015

Dept.- Thin Film Station- Ion Mill Processes Clean Room Area

Wafers Product size 6in. and 8in.

Job Responsibility: Basic workstream

OCR wafer ID Reader, Inspect all wafers before processing, Load up to 12 production wafers, Load the wafers into the peek cassette using the vacuum wand from top to bottom, Barcode cassette, Mitec operations, Monitors, NANO measurement, microscope, Ion mill recipes, SPC procedures, Thin film logsheets.

NDC-Nitinol Devices & Components/Cordis

A Johnson & Johnson Co.

Manufacturing Operator: Fremont, CA. 4/01-11/08

Working for Stent lab: Next Gen SMARTeR, Precise, Large SMART Control, SMART 120/150 and VC Fitter.

Manufacturing processes: Deburr, Tumble,Hone,Expansion, Af tuning, Microblast, Chemical Activation, Electro-Polishing,Visual inspection and Record stent final dimensions using laser micrometer.

Certified Trainer on manufacturing process.

HMT/CHAHAYA OPTRONICS.

Material Handler/Shipping-Receiving: Fremont, CA. 1997/2001

Responsibilities includes:Distributing materials from stock to manufacturing, Enter supply parts number into Data Base. Loading and Unloading Trucks and constant heavy lifting,

Assist in receiving department as well as maintaining my normal responsibilities.

Responsible for all stockroom transactions and maintaining accurate inventory by daily cycle count, activities for stockroom and shipping department to ensure that all shipments are ship on time.

EDUCATION

MILPITAS HIGH SCHOOL



Contact this candidate