Post Job Free
Sign in

Electrical Engineer Project Management

Location:
Bangladesh
Salary:
120000
Posted:
November 30, 2024

Contact this candidate

Resume:

CURRICULUM

VITAE OF

MD ARFAN UDDIN

Electrical Engineer

CONTACT DETAILS:

+880**********

*********@*****.***

Sundarganj, Gaibandha

SKILLS:

Project Management

Solar power plant O&M

Installation and testing of GIS

33/11kV, and 132kV Substation

testing and installation

Power Transformer installation

Microsoft office

AutoCAD 2D,3D

Building wiring

Team management

Electrical Design

Secondary and primary wiring of

substations

BNBC

Programmable logic controller

(PLC)

Communication

LICENSE:

ABC Supervisor License from the

Electricity Licensing Board

(License No: S20230013184)

Energetic, diligent ELCB (Electricity Licensing Certificate Board) ABC-certified senior electrical engineer with 7+ years of professional experience. Eager to provide general and emergency project execution services for substation installation, testing, and commissioning. I accomplished sixteen numbers of 33/11kV, one 400kV bay, thirty bays of 132kV GIS and AIS substations, and eight no three-storied commercial building wiring and air conditioning systems. I executed installation, project management, testing, building wiring, operation, and troubleshooting of s/s in my services.

Senior Electrical Engineer

Rays Power Infra Ltd.

January 2024-Running, Tissta 200MW AC Solar Power Plant, Gaibandha Work responsibilities:

Preventive maintenance of IDT, 132/33kV Switchyard, MV, LV, Relay panel, battery and charger panel.

Troubleshooting of 132/33kV switchyard, IDT, 33kV, 132kV relay, LV and RTCC panel.

Making of DGR, Monthly, quarterly and yearly maintenance reports.

Construction test schedule and coordination with testing team for yearly switchyard testing and analysis of testing reports.

Coordination with different vendors for solar power plant.

Communication with Client and NLDC about transmission parameter.

Conduction testing of PV analyzing, ERT, IR, Open circuit voltage etc. Senior Electrical Engineer

Controlware Engineering Ltd.

June 2020 –December 2023, Monsurabad, Dhaka, Bangladesh A company of supply, installations, testing, and commissioning of 33,132,230,400 kV GIS and AIS substations.

Work responsibilities:

Project Management for GIS and AIS Substation.

Installation of GIS, Transformer, Cable tray, Motor, etc.

Scheme and operation checking of 33,132 and 400kV substation.

Coordination between client and sub-contractors.

Insulation resistance (IR), Contact Resistance Measurement (CRM), Earth Resistance and resistivity, Ratio of CT, VT, and transformer, Vector group, and stability checking of the transformer. Load distribution, cable and circuit breaker selection, etc.

Control voltage checking from 400V AC LT Panel and 110,220V DC panel. Project Engineer (Electrical)

Sterling & Wilson Private Ltd. (India)

December 2017 – March 2020, Bogura, Bangladesh

A company of supply, installations, testing, and commissioning of 33/11 kV substation.

Work responsibilities:

Testing and Maintenance of 33/11 kV substations.

Erections 33/11kV Switchyard, Control relay panel, HT switchgear, Battery, and Battery Charger.

Design and study of 33, 11 and .4 kV distribution and transmission line. CAREER SUMMARY:

EXPERIENCES:

Installation, testing, and commissioning of 132kV GIS Substation of Ashuganj 132kV GIS Substation Project with China National Technical IMP

& EXP Corporation (CNTIC).

Responsibility:

Installed Thirty Bay of 132kV Hitachi GIS and testing of GIS.

Equipped Two Nos 300MVA autotransformer, Two Nos 500kVA Earthing transformer.

Conducted Control wiring for 132kV GIS, autotransformer, and relay panel.

Vacuum, Gas filling and SF6 gas testing for full GIS.

Accomplished the earthing of the substation, and completed four building wiring, and load distribution from the LV panel.

Operation, interlocking, and scheme checking of 132kV GIS.

Supervised the testing of full GIS (Bus bar, PT, CT, CB, DS, ES etc.)

Installation & testing of 400 kV GIS Bay Extension of Ashuganj 400MW Combined Cycle Power Plant (East) with China National Technical IMP & EXP Corporation (CNTIC).

Responsibility:

Installed a 400kV one full bay Siemens GIS.

Control wiring of 400kV Siemens GIS, LCC, and relay panel.

Tested 400kV PT, CT, DS, ES, and bus bar.

Handled the operation of CB, DS, and ES.

Associated high voltage test for full 400kV Bus of GIS.

Installation, testing & commissioning of 8 Nos 33/11kV GIS Substation for Bangladesh Power Development Board (BPDB) with China CEC Engineering Corporation.

Responsibility:

Installed eight Nos 33kV and 11kV GIS panel.

Connected eleven Nos 20/26 MVA transformer and 10 Nos 200kVA auxiliary transformers.

Equipped eight sets of Battery sets (110V), charger, and DC panel.

Supervised Load distribution for LV Panel.

Power Cable laying and termination of 500,300,150,70 Sqmm.

SAS panel connection from 33,11,.4kV panel.

SAS operation checking from PC.

Installation, testing & commissioning of 7 Nos 33/11kV AIS Substation and 7 Nos Control building wiring for Bangladesh Power Development Board

(BPDB) with Sterling & Wilson Private Ltd.

Responsibility:

Installation of 8 Nos 33/11kV AIS substation.

Equipped 10/13.33, 5MVA and 100kVA auxiliary transformer.

Conducted Control cable laying and termination for transformers, VCB, DS, ES, CT, and PT.

Operated and tested of 33/11 kV substation.

EDUCATION:

2012-2016

International Islamic University Chittagong

(IIUC)

B.Sc. in Electrical & Electronics

Engineering

CGPA: 3.005/4

2009-2011

Chittagong Board

H.S.C in Science

GPA: 3.40/5

2009

Chittagong Board

S.S.C in Science

GPA: 4/5

LANGUAGES:

Bangla-C2

English-B2

I do hereby declare that the above information is true and correct to the best of my knowledge.

Yours Faithful,

TRAINING & WORKSHOP:

Completed a training course on

Industrial technology on electrical

engineering and instrumentation

from a training institute for

chemical industries from 19th

November 2016 to 8th December

2016.

Accomplished a course on

industrial automation systems

(PLC&VFD) from Bangladesh

Korean training center from

January 2016 to June 2016.

Attained industrial training on the

manufacturing process and testing

of distribution transformers from

General Electric manufacturing

CO.LTD from 12th March 2016 to

20th March 2016.

Participated workshop on industrial

wiring, VFD, PFI panel, Switchgear,

Motor protection, and Generator

maintenance.

COMPLETED PROJECTS:

DECLARATION:



Contact this candidate