JOSE JOVANI SOTO SR.

**** ******** ****** ********* **, 76015

EMAIL: ***.*****@*****.*** 682-***-****

Experience : 15 years in Construction. 8 year in management

Skanska USA Nov 2023 – July 2024

Superintendent.

Project:

Tarrant County Community College Development (TCCD) – NE Campus

Read & Review project plans and specifications.

Read and review subcontractor contracts (scope of work)

Edited and marked up PDF files using Procore or Blue Beam to assist jobsite personnel.

Oversaw & Coordinated ground up construction of 3 story cast in place building structure (B3)

Oversaw and Coordinated installation along with city inspections of all site utilities, Storm Water, Sanitary & Fire.

Review Daily Hazard Analysis

Maintained SWWP report.

Scheduled daily dumpster swaps.

Perform Crew Reviews

Site safety inspections

Equipment inspections

Assisted EHS with site Orientations English/Spanish.

Directed Self Perform crew to maintain site neat and organized.

Coordinated with subcontractors during daily superintendent meetings to ensure schedule was being followed.

Scheduled Pre-Construction meetings with Contractors scheduled to be onsite 3-6 weeks prior to mobilization to the site and the beginning of scope of work to ensure a smooth transition.

Monitored and tracked material lead times so it would not impact daily site coordination amongst the trades.

Worked along with P. E’s and PMs to track C/O’s, ASI’s along with RFI’s needed to keep schedule on track.

Updated P6 Schedule.

Pro-Core Certification Superintendent.

Assisted in the completion of NWO1 & NWO2 Punch list for buildings 1 & 2.

Completed Project Snowflake (Work that was not done during the initial 1&2 phase’s, work was completed in December of 2023) 24 days straight without a day off.

Excavation/Trench Safety Trained.

Modern Contractors Jan 2023 – July2023 Superintendent .

Project: Great Hearts Prairie view Elementary.

Read and Understand blueprints.

Utilized Procore for site observations, RFI

tracking and daily reports.

Tracked and monitored daily manhours for all trades to ensure schedule would not be impacted.

Facilitate OAC meetings.

Created and updated six-week schedule for all trades onsite.

Coordinated daily site deliveries.

Created punch list and tracked until all work was complete QA/QC

Took daily progression photos of site.

Collaborate with owners, architect, and contractors to determine project needs.

Scheduled all city inspections with the city of Fort Worth.

Roger’s O’Brien Construction April 2022- Dec- ‘22

Assistant Superintendent

Project: Triangle Brick plant in Henrietta Tx.

Concrete pour pre inspections.

Lean Construction Logistics and Job Set-Up.

RFI – Technical Writing Skills.

Schedule and Understanding Sequence

Software – Procore, Microsoft 365,

Safety - OSHA 30.

Submittals (Understanding Specifications)

JE Dunn Construction February 2017 –Jan 2022

Trade Foreman II

Projects :

Frisco Station pre-cast garage. (6 story)

DFW Airport Police Head Quarters. (Two story Tilt Wall)

Microsoft – Las Colinas Tennant improvement.

Weirs plaza.

QT data center.

Supervised all daily activities and coordinated among the trades to ensure safety was our first concern to avoid injuries.

Review daily (JSA) forms

Translated toolbox talks at all Monday morning huddles.

Self-Perform * Any work that was missed in scope* depending on task.

Maintained daily log as well as employee manhours.

Facilitated and translated safety toolbox topics during weekly jobsite safety meetings.

Handled Daily Onsite Safety Orientations (English/Spanish)

Attended/OAC meetings.

Coordinated with owners/architects on site punch list

Used blue beam and CMIC.for documentation.

Peinado Construction Feb 2016 – Feb 2017

Superintendent.

Projects

Dallas Recycle Center (Tilt Wall)

CAT Solar Turbines (Tilt Wall)

1,000,000 sq ft tilt wall facility for UPS.

Created and updated 6-week schedules.

Scheduled subcontractors for start dates and completion of scope of work.

Coordinate Site work to maintain project schedule.

Scheduled City inspections.

Updated and maintained SWWP.

Updated site drawings and verified subcontractors were issued lates updated changes.

Handled safety orientations to new subcontractors and their employees.

Performed and enforced site safety inspections.

Create and maintain follow up with RFI’s when field issues were discovered.

Maintained daily log of weather delays and field conditions.

Reach out to Subcontractors, project managers to maintain project on schedule.

QA/QC Concrete and paving pours

Inspected walls; panel rebar as well as embed to match field used panel books by engineer.

Coordinated with owners/architects on on-site punch list.

EJ Smith March 2011 – Feb 2016.

Superintendent

Project:

Wish Clinic (EJ Smith Joint Venture Rogers O’Brien)

DART (Orange/Blue line) Light Rail expansion in Rowlett Tx.

BNSF Watchman Lookout.

DFW Airport terminal A phase 2 & 3 parking garage.

Anderson surgery center (parkland hospital)

Provided general direction and oversight to the safe performance of work that met required quality standards and the established time and scope of the project schedule.

Assessed and addressed performance issues with job site work crews under Superintendent’s direction and addressed performance issues with subcontractors.

Assisted in developing the site plan including public safety measures; site security; truck routing (inbound and outbound).

Planed and developed logistics for overall personnel and material movement within the site.

Established and maintained regularly scheduled daily and weekly project team meetings as appropriate for the project.

Led and motivated members of the project team to compete all phases of work within the schedule and parameters established.

Built and maintained relationships with inspectors, subcontractors, and suppliers.

Safety/Foreman @ Wish Clinic

Replaced previous safety officer, created, and processed punch line items for GYP Repair & Paint Repairs

Responsible for daily trash removal and ordering canisters to be emptied. Logged Payroll hours.

Handled creation of job duties and delegate tasks to construction workers.

Managed Daily Housekeeping Crew.

Created and monitored schedules for each worker and ensured that he has the physical and mental ability to cope.

Ensured accuracy of work orders prior to handing them out and made sure that time efficiency is considered.

Made sure that work sites are cleaned and cleared of any hazardous materials prior to the beginning of a construction project.

E.J. Smith

Concrete Finisher/Carpenter

Built, erected, and aligns forms for various concrete structures and foundations.

Estimated concrete quantities, appropriated mixes of sand and cement if concrete is hand mixed.

Instructed and directed laborers and/or personally performed duties of cutting and placing reinforcing wire mesh, preparing appropriate sand and cement mixtures, and placing, pouring and rough leveling of concrete.

Fine finished concrete by floating, troweling, edging, and brushing in accordance with specifications.

Utilized hand tools and non-complex small power tools and performs minor maintenance as required.

Welded as needed.

Dart Blue Line (E.J. Smith)

Concrete Finisher/Carpenter

Set up the forms in which concrete was poured to create walkways, walls, pillars, and other structures.

introduced rebar or wire mesh to reinforce the material, use trowels and other tools to spread and smooth concrete, and mold expansion joins and edges.

Monitored the material to ensure it hardens to a durable finish.

Professional Education:

Graduated: Dec. 2003.

Lincoln Technical Institute

Arlington, TX

Academic Education

Graduated 2002

Sam Houston High School

Arlington, TX



Contact this candidate