PRAVEEN SHARMA
Contact: +91-963*******, +91-955*******,
E-Mail: *************@*****.***
JOB OBJECTIVE
Seeking challenging and rewarding assignments in Project construction and management preferably in Refinery, Petrochemical, Fertilizer and Power Sector where I can productively apply the skill that I currently possess towards the progress of the organization and myself being a quick learner and the person with professional attitude believe that I can prove to be an asset for the organization.
PROFILE SUMMARY
A result driven professional with over 14 years 01 Months of experience in Project Management, Resource Planning, Fabrication, Erection & Pre-Commissioning and Handing over to O&M Department.
Currently working with M/s. Linde India Limited as Associate Manager Mechanical.
Possessing through knowledge in Co-ordination with Consultant, Client, Contractors and Other related Agencies for Schedule Completion of Project with time.
Knowledge of PFD, P&ID, GA, ISO’s, layout drawings, preparation of as built drawings.
Deft at Materials Control and Pre-Commissioning of Plant Piping for Process Lines, Utility Lines, Fire Protection System etc.
Capability in overseeing plant activities from conceptualization to execution including stage inspections, scheduling, progress monitoring, site management, vendor management and manpower planning.
Adept in developing project baselines, monitoring and controlling with respect to cost, time over-runs and quality compliance to ensure satisfactory execution of projects.
Extensive Experience in AG & UG Piping Fabrication and Erection inspection, Static and Rotary Equipment Erection and Alignment, UG Coating Inspection, ISO/Mechanical Clearance and Loop Clearance, Hydro Testing, Final Box-up, Site Planning, Supervision of Multi-Disciplinary Construction Activities, Materials Control and Construction Progress Monitoring etc.
Adroit in managing Erection & Commissioning of LLDPE, FGTU(Fuel Gasoline Treating Unit), Reformer, ROGC Plant, 27 m3 Water Treatment Plant, 180 TPH CFBC Boiler.
High degree of Interpersonal Communication Skills, Positive Approach, Combination of Skills, Academic excellence and Superior Personal Attributes.
An excellent planner with good problem solving and people management skills.
Identifying the bottleneck and workout to solve the same.
CORE COMPETENCY
þConstruction Activities Management
þStudy of Isometric P&ID
þFabrication & Erection
þMechanical Clearance and Final Box-up
þErection & Pre-Commissioning
þMaterials Management
þVerifications & Certification of Bills
þMIQA & PSSR Audit
þSite Planning & Supervision
þEquipment Erection
þHydro & Pneumatic Testing
þStrategic Planner
þAnalytical & Problem Solving Skills
þTeam Leadership Skills
PROFESSIONAL EXPERIENCE SCAN
Jan'22 – Till Now M/s. Linde India Limited at HRRL Refinery – Barmer, Rajasthan as Associate Manager – Mechanical
Project Handled: Compressed Air and Cryogenic Nitrogen Plant, Package-3
Role:
Responsible for Monthly and Weekly progress planning for Structure and Piping construction activities with Contractors.
Responsible for approval of Lifting Plans of Static and Rotary Equipments.
Carrying out fabrication, erection activities and alignment of steel structure according to drawings, total material inspection and checking the contractor’s Bills.
Strictly following PTW system.
Responsible for Raising the Format I, II, III and IV and final handover to client.
Responsible for preparation of Flushing and Blowing Plan and complete the Pre-commissioning of Plant.
July'20 – Dec”21 M/s. Engineers India Limited at HMEL (GGSRL) – Bathinda, Punjab as Deputy Manager – Mechanical
Project Handled: 2x400KTPA POLYMER ADDITION (LLDPE/HDPE-SWING)
Role:
Responsible for Monthly and Weekly progress planning and Follow up for Equipment, Structure and Piping construction activities with Contractors.
Fully involvement in Pre-Commissioning of Nitrogen Compressor & Pneumatic Conveying System.
Coordination with vendors for Pneumatic Conveying System, Nitrogen Compressor, VGR Compressor, Regeneration system for Mismatch Piping an Equipment related query to timely completion of Jobs.
The Scope of Unit – 5.5Lakhs IM, 2.4 Lakhs ID and Equipment – 8624 MT
Loop Markup with P&ID, Inspection of Mechanical Clearance and HT of Loops.
Piping Material Management.
Weekly doing the Site Safety Audit and preparation of report.
Aug'19 – July’20 M/s. Offshore Infrastructure Ltd. at MRPL - Mangalore, Karnataka as Sr. Piping Engineer.
Project Handled: FGTU - Fuel Gasoline Treating Unit
Client: EIL & MRPL - Mangalore Refinery
Role:
Responsible for Piping Fabrication, Erection, Site Execution, Spool Management, Maintaining quality job and coordination.
Coordination with Client EIL & MRPL for piping related query to timely completion of Piping Jobs.
AG Piping: - Pipe Erection fit up and alignment, Piping support, Checking and witnessed of Mechanical clearance of loops and box-up of loops and finally handed over to Client after clearing punch points.
Strictly following PTW system.
Piping Material Management.
Weekly doing the Site Safety Audit and preparation of report.
Dec'17 – Aug'19: Onshore Construction Company Pvt. Ltd. HPCL - Mumbai, Maharashtra as Piping Engineer - Project Management.
Project Handled (1): Revamp of HPCL – VPS & DHT
Client: EIL & HPCL Mumbai Refinery
Role:
Responsible for Piping Erection, Spool Management, Maintaining quality job and coordination.
Coordination with Client for Mismatch and piping related query to timely completion of Piping Jobs.
AG Piping: - Pressure Piping, Pipe Erection fit up and alignment, Piping support, Checking and witnessed of Mechanical clearance of loops and box-up of loops and handed to client.
Project Handled (2): Revamp of VGO-HDT
Client: TKIIS & IOCL Gujarat Refinery
Role:
Responsible for Piping Erection, Site Execution, Spool Management, Maintaining quality job and coordination.
Maintaining the documentation record for existing lines dismantling and preparation of new lines erection.
Coordination with Client for Mismatch and piping related query to timely completion of Piping Jobs.
AG Piping: - Pressure Piping, Pipe Erection fit up and alignment, Piping support, Checking and witnessed of Mechanical clearance of loops and box-up of loops and handed to O&M department.
Execution of Tie-In job in existing lines with coordination plant operations department.
Strictly following PTW system for dismantling Existing lines and also starting new activity.
Project Handled (3): Ramagundam Fertilizer and Chemical Limited (RFCL)
Client: Engineers India Limited (EIL)
Role:
Responsible for Piping Fabrication & Erection, Spool Management, Maintaining quality job and coordination with various contractors in Reformer.
Independently completed Fabrication of 24000 ID and Erection of about 48000 IM of Piping.
Coordination with quality, civil and structural team for getting front for Piping Erection.
AG Piping: - Pressure Piping (Riser and Down-comer), Pipe Erection fit up and alignment, Piping support, Checking and Mechanical clearance, Testing (Hydro & Pneumatic) of loops and box-up of loops.
Hydro testing of low pressure and high pressure loops, with pressure ranging from 10 kg/cm To 187 kg/cm in AG piping.
Apr'14 – Sep’17: Reliance Industries Ltd. Jamnagar, Gujarat as Piping Engineer - Project Management
Project Handled: Refinery off Gas Cracker (ROGC) Unit in J-3 Project
Role:
Successfully handing over of ROGC Plant and its Cooling Tower including AG piping erection, Mechanical clearance, Hydro testing and Box-up of loop files to O&M department.
Independently completed Erection of AG piping about 55000 IM out of total Area Scope of 42 Lakhs IM.
Independently completed lowering of UG piping about 124000 IM out of total Area Scope of 9.5 Lakhs IM.
Completed about 40000 IM ISO clearances, Loop clearance & testing and handing over to O&M department.
Responsible for Project planning, Site Execution, Spool Management, Maintaining quality job and coordination with various contractors.
Static and Rotary Equipment Erection of ROGC Unit likes Column, Pumps, Cold-box, Blowers, Compressor, Condenser, turbines, Heat Exchangers, etc.
Responsible for system wise PSSR activity.
Verifying and approving the contractor’s daily / Weekly certification of JMR's / RA bills.
Project Handled: Low Density Poly ethylene (LDPE) unit in J-3 Project
Highlights:
·Completing the testing (Hydro & Pneumatic) of about 2.4 lakh IM piping of CS, SS, Alloy Pipes and Steam Tracing tubes with pressure ranging from 10 kg/cm to 350 kg/cm in AG piping.
Project Handled: Mono-ethylene Glycol (MEG) unit in J-3 Project
Highlights:
·Completing the final box-up of 250 loops.
·Responsible for system wise PSSR activity, MIQA and WTPA Audit.
Jul'10 – Apr'14: M/s. Concast Steel & Power, Jharsuguda, Odisha as Engineer - Project Management
Responsible for Project planning, monitoring, quality job and Coordination with various vendors and contractors.
Managing all IBR lines and formalities
Carrying out fabrication, erection activities and alignment of steel structure according to drawings, total material inspection and checking the contractor’s Bills.
Reviewing all bill of quantity (BOM) like steel & incoming raw material, etc.
Involved in 4000 MT steel fabrication, Erection in Boiler and TG building emphasis indents of structure steel, pipe & raw materials
Project Handled: 70 MW (1x40 MW CFBC & 1x30 MW WHRB) Captive Power Plant Project
Highlights:
Erection of Equipment and Structural Fabricated material of 180 TPH CFBC And 10 35 TPH WHRB.
Successfully commissioning and Hydro-Testing of 180 TPH CFBC Boiler at 199.5Kg/cm2 Pressure.
Successfully completed commissioning of 27m3 Water Treatment Plant.
Efficiently done alignment of 30 MW BHEL make Turbine, Gearbox and Generator
CERTIFICATES
Valuable contribution in Achieving 25 Million Safe Man-hours at ROGC J3 Project.
Valuable contribution in Achieving 1 Million Safe Man-hours at CA & CNP Project at HRRL Barmer.
IT SKILLS
Tools: AutoCAD (2004, 2006 & 2008)
EDUCATION
·MBA in Project Management (Distance Education) from CSET Education Institute, Agra, Sikkim Manipal University
·B.Tech. (Mechanical) from Sachdeva Institute of Technology, Mathura, U.P. Technical University in 2010 with 70.8%
CERTIFICATIONS
·Certification in AutoCAD & CATIA from Agra & Gr. Noida
PERSONAL DETAILS
Fathers Name Mr. Ram Sewak Sharma
Date of Birth: 16th July, 1987
Address: Mr. Ram Sewak Sharma, A-56 Ganesh Nagar near Gosia, Tundla, Firozabad, 283204
Sex Male
Marital Status Married
Languages known Hindi & English
Nationality Indian
Passport M6117048
DECLARATION
I hereby declare that the above-mentioned information is correct up to the best of in believe my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.
Place:
Date: (Praveen Sharma)