Post Job Free
Sign in

On-Site Project Management

Location:
Thornton, CO
Posted:
January 11, 2025

Contact this candidate

Resume:

STEVE SIGURDSON

MECHANICAL ENGINEER

Cell: 719-***-****

**************@****.***

SUMMARY

Thirty three (33) years of Facility Engineering, Construction Engineering, Construction Management, and Project Management experience related to the design, construction, and installation of onshore oil/gas production facilities, offshore oil/gas production platforms, FPSO’s/FSO’s, production and gathering facilities, storage and offloading facilities, LNG facilities, and Tank storage facilities located in the Gulf of Mexico, the Middle East (U.A.E.), the Far East (Malaysia), the Caribbean Islands (Trinidad/Tobago), the Russian Federation (Sakhalin Island), the North Slope of Alaska, and South Pacific (Kwajalein Atoll, RMI.)

Professional experience includes on-site Project Management, remote Project Engineering, on-site Construction Management, on-site Construction Engineering, and remote/on-site Facility Engineering including sub-contract management and oversight, generation of project specific construction estimates, schedules, construction specifications, and fabrication/installation procedures; off-site detailed engineering and design of pipeline transportation systems pursuant to B31.4 and B31.8 requirements; off-site/on-site detailed engineering and design of hydrocarbon process systems pursuant to B31.3 requirements; detailed engineering and design of firewater/deluge systems pursuant to NFPA, ABS, USCG and CFR 1910 requirements; conceptual development from PFD creation through final IFC P&ID development; packaged and modular equipment specification including technical bid evaluation of pipeline pump skids, diesel/turbine driven compressors, diesel driven emergency generator skids, process separation skids, dehydration skids, metering skids, chemical injection skids, HP/IP/LP pressure vessels, process pump packages, firewater pump packages, A.F.F.F. skid packages and fire suppression equipment, survival craft, API 2C cranes, sizing and specification of process safety and process control equipment (e.g. pressure relief valves, process control valves, process instrumentation, etc.); and pipe stress analysis using Caesar II and CAEPIPE modeling software.

EDUCATION

B. S. Mechanical Engineering, 1990

Mississippi State University

ACAD I & II, 1997

Wharton County, TX Junior College

A.S.M.E. Sponsored Pipe Stress Seminar - 16 weeks

A.S.M.E. Sponsored Pump/Seal Seminar - 16 weeks

A.S.M.E. Sponsored Pressure Vessel Seminar - 1 week (40 hr.)

PROFESSIONAL AFFILIATIONS

E.I.T., Texas Registration No.: 25522

PROFESSIONAL EXPERIENCE

AECOM, Inc. - 2/20 to 7/23.

Construction Manager

Projects include:

Denver Water, Accelerated Lead Service Line Replacement (ALSLR): - Responsible for onsite construction management related to the removal and replacement of residential/commercial lead water service lines as mandated by the Environmental Protection Agency including oversight and coordination of onsite subcontractor construction activities, review/approval of subcontractor payment requests, onsite construction support, performing pre-construction constructability reviews, oversight of replacement related customer service complaints and resolution so as to ensure alignment with the yearly construction schedule and replacement requirements.

San Juan Construction Company, Inc. - 10/18 to 11/19.

Project Manager

Projects include:

US Army Garrison Kwajalein Atoll, RMI: - Responsible for onsite project management related to the demolition of existing fuel storage tanks, replacement of demolished fuel storage tanks and infrastructure piping, erection of JP5 Meter and Fuel Logistic/Transfer buildings, construction of project man-camps and office buildings including utility piping, electrical, and communications infrastructure upgrades, procuring and coordinating subcontractor onsite activities, and providing construction engineering support performing pre-construction constructability reviews, conducting USACE mandated preparatory construction meetings, project stakeholder meetings, USACE project progress meetings, generating project progress payment requests, generating project permitting requests, oversight of project equipment/materiel procurement and logistic plans, so as to ensure alignment with the construction schedule.

ConocoPhillips Alaska, Inc. - 5/13 to 9/15.

Construction Engineer

Projects include:

Kuparuk River Unit: - Responsible for off-site pre-construction planning related to the design and construction of multiple field-wide installations, and projects, including performing pre-construction constructability reviews, generating construction execution plans, ensuring engineering design, project funding, federal, state, and municipal (borough) permitting, project equipment/materiel procurement, and logistic plans are aligned with the construction schedule, coordinating subcontractor on-slope activities, and providing construction engineering support.

DCP Midstream, LLC., - 8/12 to 5/13.

Project Engineer/Construction Manager

Projects include:

Sand Hills Pipeline Project: - Responsible for Project Engineering/Construction Management related to the construction of four (4) pump stations comprising a 750 mile NGL pipeline from West Texas to Mont Belvieu, TX, including 3rd party Design Engineering services management, design constructability reviews, 3rd party Vendor design review, Pipeline Installation Contractors review/approval, on-site management of Fabrication/Installation Contractor, and material/logistic tracking necessary to maintain project scope, schedule, and budget.

CH2M Hill, Inc., - 3/11 to 8/12.

Construction Engineer/Lead Asset Engineer

Projects include:

Sakhalin Energy Investment Corp, Inc., (Yuzhno-Sakhalinsk, Russian Federation), Prigorodnoye LNG Plant: - Responsible for Construction Engineering/Construction Management related to the fabrication and installation of equipment/piping and civil works designed to increase the efficiency of the existing effluent treatment system discharging into Aniva Bay, Prigorodnoye, RF including budgetary and schedule management, 3rd party design engineering management, Fabrication/Installation Contractor management, conducting of constructability reviews, Construction Work package reviews, Engineered Lift Plans, and material and logistic tracking necessary to maintain project scope, schedule, and budget.

Sakhalin Energy Investment Corp, Inc., (Yuzhno-Sakhalinsk, Russian Federation), Piltun A Platform: - Responsible for Project Engineering related to ongoing Capital Projects including generation of project documentation necessary to obtain project funding, generation of AFE and supplemental funding requests, budgetary and schedule management, 3rd party design engineering management, fabrication subcontractor management, and offshore construction liaison necessary to maintain project scope, schedule, and budget.

Jacobs Engineering, Inc., - 9/08 to 1/10.

Project Manager/ Project Engineer

Projects include:

Suncor, Energy USA, Inc., (Commerce City, CO): - Responsible for Project Management/Project Engineering of small Capital Projects (>$30 MM) including, generation of project documentation (e.g., Design Basis Memoranda, Project Execution Plans, Project Scope of Work, etc.) necessary for “gated” project funding, generation of AFE requests, budgetary and schedule management, design engineering, 3rd party design engineering management, subcontractor management, and construction liaison necessary to maintain project scope, schedule, and budget.

CH2M Hill- Alaska, Inc., - 4/07 to 8/08.

Project Manager/ Field Mechanical Engineer

Projects include:

British Petroleum, (Prudhoe Bay, AK): - Responsible for onsite engineering support and construction management of federally mandated Field Managed Projects, Central Gathering Facility and Flow Station shutdowns, and Pipeline Maintenance Projects (PMP’s) including generation of Scope of Work packages, Project Schedules, Engineered Lift Plans, constructability reviews, material and logistic tracking, and Work Logic Matrices.

Albert-Garaudy & Associates, Inc., - 3/06 to 4/07.

Construction Manager/Senior Mechanical Engineer

Projects include:

Escambia Operating Inc, LLC, Big Escambia Creek Gas Treating Facility (Atmore, AL): - Responsible for onsite Turnaround coordination activities including generation of Contractor Scope of Work packages, Project Turnaround Schedule, contractor management tracking procedures and regimes, regulatory compliance packages, Vessel Cleaning Procedures, Vessel Inspection Procedures pursuant to API 510 requirements, procurement packages related to plant upgrades and maintenance pursuant to 27 CFR 1910.00 requirements.

Escambia Operating Inc, LLC, Flomaton Gas Treating Facility (Flomaton, AL): - Responsible for generation of Contractor Scope of Work packages, piping and equipment procurement packages and design of process piping systems related to plant upgrades and maintenance.

Escambia Operating Inc, LLC, Flomaton Gas Treating Facility (Flomaton, AL): - Responsible for generation of equipment specification package, piping design package and equipment procurement package related to the replacement of two (2) deep well Salt Water Injection pumps.

ExxonMobil, U.S. Production, South Pass 89 A (Gulf of Mexico): - Responsible for generation of detailed project specific Construction Plans related to the demolition of existing platform structural members, piping, and equipment, installation of replacement platform structural members, installation of interconnecting piping, pipe supports, cable trays and electrical conductors and off-Module equipment, and installation of pre-fabricated 320 ton Generator/Pig Launcher Module, generation of MMS package technical addendums pursuant to re-commissioning of damaged D.O.T. and intra-field pipelines, pipe stress analysis utilizing CAESAR II software, and on-site engineering construction management related to Module installation and ancillary construction activities.

ExxonMobil, U.S. Production, South Pass 89 B (Gulf of Mexico): - Responsible for generation of detailed project specific Construction Plans related to the demolition of existing platform piping, pressure vessels, sub-Cellar Deck structure and compression equipment, installation of replacement piping and equipment, and installation of replacement sub-Cellar Deck, P&ID generation, miscellaneous equipment specification, and on-site construction management related to the reconfiguring of the platform from a manned to an unmanned structure.

River Birch Conservation, River Birch Landfill Gas Recovery Project (Avondale, LA):- Responsible for Front End Engineering & Design (F.E.E.D.) including P&ID generation, mechanical project cost estimation, generation of project specific equipment, and piping specifications, generation and review of equipment Request for Quotation (RFQ) packages for the 10 MMSCFD landfill gas recovery project located in Avondale, Louisiana.

Worley Parsons Trinidad, Ltd., - 5/05 to 12/05.

Construction Manager

Projects include:

BG Trinidad & Tobago, Central Block Production Facilities Expansion (Otoire, Trinidad, West Indies): - Responsible for in-house review of process stream design and plant facility layout, generation of construction management plan, L2 and L3 construction schedule, project specifications, contract scopes of work (SOW’s), constructability reviews, bid package analysis, supervision of sub-contractor selection/award processes and on-site Construction Management including sub-contractor oversight, project cost control mitigation, construction schedule maintenance, and construction engineering related to the installation of the 65 MMSCFD/500 BCPD Carapal Ridge, Central Block, production facility as well as, installation of one (1) 10” sales gas interconnect pipeline and associated P/L metering stations, and one (1) 4” condensate sales pipeline located and operated onshore Ortoire region (St. Mary’s), Trinidad.

SBM-Imodco, Inc., - 3/03 to 4/05.

Senior Construction Engineer

Projects include:

PEMEX, CALM Buoy (Ciudad del Carmen, Campeche, Mexico): - Responsible for on-site Construction Management including project cost control, construction schedule maintenance, and construction engineering in Ciudad del Carmen, Campeche, Mexico for two (2) 12.5 m Cantenary Anchor Leg Mooring (CALM) buoys to be installed in the Bay of Campeche, Mexico.

Husky Oil, White Rose (Newfoundland, Canada): - Responsible for “fast-track”, on-site Project Management/Construction Supervision of one (1) 84” x 103’-0” OAL, 100-ton replacement offshore mooring pile for the White Rose Project to be installed offshore Canada.

TotalFinaElf, E&P, USA, Inc., Matterhorn TLP (Gulf of Mexico): - Responsible for on-site supervision of contractual warranty repair work on the 33,000 BOPD/100 MMSCFD tension leg platform installed and operated in the Mississippi Canon field – Block 243 located in the Gulf of Mexico.

Exxon/Mobil, Yoho FSO: - Responsible for construction engineering including constructability and engineering reviews prior to commencement of fabrication, project inspection of process valves, piping, pumps, etc., coordination of spare parts inspection and expediting for the FSO Yoho with 1 MM bbl storage capacity to be installed and operated offshore Nigeria.

Teekay Shipping Corporation/Unocal Thailand Ltd., Thailand Oil Development, Phase 2 (Johor, Malaysia): - Responsible for constructability and engineering reviews of SBM, SBM-Imodco, and fabrication site (Malaysia Shipping & Engineering, Inc.) construction drawings, review of vendor shop drawings and equipment specifications, materials of construction review for all packaged and modular equipment, and of proprietary SBM swivel stacks and turret bearing designs, on-site project management/construction engineering (MSE Shipyard – 81700 Pasir Gudang, Johor, Malaysia) and oversight related to material testing/inspection/logistic activities for the 45,000 BOPD/55,000 BOCD FSO to be installed and operated in the Plamuk field, Gulf of Thailand.

Malaysia Independent Shipping Corporation, Inc., Single Point Turret (Johor, Malaysia): - Responsible for constructability and engineering reviews of SBM, SBM-Imodco, and fabrication site (Malaysia Shipping & Engineering, Inc.) construction drawings, review of vendor shop drawings and equipment specifications, materials of construction review for all packaged and modular equipment, and of proprietary SBM swivel stacks and turret bearing designs, on-site project management/construction engineering (MSE Shipyard – 81700 Pasir Gudang, Johor, Malaysia) and oversight related to material testing/inspection/logistic activities for the 13,679 BOPD/35 MMSCFD FPSO to be installed and operated in the Penera and Lukut fields, offshore Malaysia.

Chevron Angola, Inc., Kuito 2A: - Responsible for on-site inspection of fabricated process equipment packages, modules and appurtenances, and constructability and engineering review of proposed fab-site modifications to existing structural and piping designs for the 90,000 BOPD/210 MMSCFD FPSO installed and operated offshore Angola.

Alaska Anvil, Inc., - 4/02 to 10/02.

Senior Facilities Engineer

Projects include:

Alyeska Pipeline Service Company, Valdez Marine Terminal (Valdez, AK): - Responsible for design package review and modification of Tank 94, Valdez Tank Maintenance Project (1998-2002), project drawings and specifications to ensure successful completion of the Tank 93 maintenance project including issuance of project specific specifications, engineering design and constructability reviews, and material substitution and coordination activities for the facilities located at the Port of Valdez, AK..

Forest Oil – Osprey/Kustatan Production Facility (Anchorage, AK): - Responsible for P&ID and project specification generation, specification of process equipment, coordination of fast-track early oil construction activities, design of inter-facility pipeline pigging system, onshore/offshore chemical injection skids, onshore/offshore open and closed drain systems, coordination of outside mechanical/acoustical reciprocating compressor analysis, pipe stress analysis, and construction management for the 35,000 BOPD/10 MMSCFD offshore production platform and remote separation facility installed and operated in the Cook Inlet, Alaska.

Paragon Engineering Services. Inc., - 6/01 to 3/02.

Senior Facilities Engineer

Projects include:

TotalFinaElf, E&P, USA, Inc., Matterhorn TLP (Gulf of Mexico): - Responsible for re-engineering of platform P&ID’s, engineering design of platform firewater/deluge system including firewater pump sizing per NFPA 20 and API 14 G guidelines, zone selection, line sizing and material selection, technical bid evaluation and re-engineering of process packaged equipment skids, re-design of conceptual process piping systems, review and generation of equipment specifications and process equipment RFQ packages on the 33,000 BOPD/100 MMSCFD tension leg platform installed and operated in the Gulf of Mexico.

E.D.C, Inc., Cheng Dao Xi Field Development (South China Sea): - Responsible for bid evaluation of process equipment, process engineering design calculations, supplementary P&ID development, pipe support design, and pressure vessel design calculation review for the 11,800 BOPD/2.1 MMSCFD offshore platform installed and operated in Bohai Bay, offshore Peoples Republic of China.

Houston/Nana, J.V. - 7/00 to 6/01.

Senior Project Engineer

Projects include:

Alyeska Pipeline Service Company, Valdez Marine Terminal (Valdez, AK): - Responsible for engineering/project management oversight during construction activities related to D.O.T. mandated A.P.I. 653 tank maintenance projects for the Trans Alaskan Pipeline System (Valdez Marine Terminal), including contractor side project management of construction activities, project scheduling, manpower loading, preparation of R.O.M. and Control Estimates for mechanical, process piping, structural, and civil construction/maintenance projects, on-site engineering and design, engineering package review, material specification and procurement for the various asset related (oil storage/transportation, power generation/distribution and tankage) facilities installed and operated at the Port of Valdez, AK.

VECO Construction, Inc. - 9/98 to 6/99.

Senior Construction Engineer

Projects include:

ARCO Alaska, Inc., MIX (Anchorage, AK): - Responsible for supervision during piping systems construction activities, generation of mechanical, structural, and piping contract change order estimates resulting from additional work/changes in work scope, material take-off, witnessing of piping system hydrotesting and mechanical/piping custody transfer activities, and generation of piping related lift plans during the construction of the 2700 ton, 3.25 MMMSCFD compressor module.

British Petroleum, Inc. (Prudhoe Bay, AK): - Responsible for mechanical/piping scope of work estimation, generation of piping fabrication drawings (spool drawings) and review of mechanical P&ID’s, facility plot plans, and piping isometrics required to ensure the constructability of the Northstar module.

Anvil Corporation, Inc. - 11/97 to 9/98.

Senior Mechanical Engineer

Projects include:

ARCO Alaksa, Inc., Kuparuk River Unit Drillsites (Deadhorse, AK): - Responsible for P&ID generation, mechanical equipment specification, piping system and pipe support design, pipe stress analysis, and material take-off related to field in-fill expansion projects throughout the Kuparuk, West Sak, Tarn, and Alpine North Slope production fields.

ARCO Alaska, Inc, Kuparuk River Unit (Deadhorse, AK): - Responsible for P&ID generation, material take-off, shipping pump piping system and pipe support design, and pipeline design including pipe stress analysis, line loss calculations, and slug load analysis relating to the installation of a nine (9) mile pipeline between CPF-2 and CPF-1, the installation of four (4) shipping pumps at CPF-1, and the installation of four (4) meter runs at Alyeska’s Pump Station 1 to increase daily oil production capacity to 550 MBPOD.

ARCO Cherry Point: - Responsible for pipe stress analysis, piping system and pipe support design, material selection and specification, and mechanical equipment selection and specification relating to the refinery’s Crude Fractionation Improvement project.

BKW Eagleton, Inc. - 4/97 to 10/97.

Senior Principal Engineer

Projects include:

Mobil Pipeline Company, Inc., Hearne, TX Tank Facility: - Responsible for P&ID generation, mechanical equipment specification, instrumentation selection and specification required for process control, piping system and pipe support design, material take-off, and directional drill design to facilitate the installation of 3” and 4” liquid meter tubes to existing meter station, and the installation of 6”, 8”, 10” and 12” pipelines required to direct and transport processed liquid hydrocarbons between adjacent tank farms.

King Wilkinson (Saudi Arabia) Ltd., Oger-Tekfen: - Responsible for detailed piping and pipe support design review, including review of Caesar II piping system models used to calculate induced pipe stress within the system, with particular attention to modes of pipeline failure on 325,000 BOPD transportation pipeline. In addition, responsible for recommendation of design modifications required to correct existing failure modes and to ensure future viability of pipeline.

Union Texas Pakistan, Laghari Gas Facility: - Responsible for P&ID and Assembly Drawing generation, pressure vessel modification specification generation, design calculation and construction drawing review, technical bid analysis, and preliminary instrumentation selection and specification required to install a sand jetting system on an existing Freewater Knockout vessel.

Union Texas Pakistan, Tangri Gas Facility: - Responsible for P&ID generation, pressure vessel specification, design calculation, and construction drawing review, pressure vessel and compressor package technical bid analysis, preliminary instrumentation selection and specification, equipment arrangement, material take-off, piping system design, and pipe stress analysis on compressor installation designed to increase plant throughput by 20 MMSCFD.

Union Texas Pakistan, Turk, Golarchi, and Bukhari Gas Facilities: - Acting Mechanical Engineer for Hazards and Operability (HAZOP) analysis sessions pursuant to 29 CFR 1910 requirements. Responsible for generation of (HAZOP) manuals, drawings, and site specific recommendations required to ensure safe and profitable operation of above mentioned facilities.

Enercon Engineering, Inc. - 1/97 to 4/97.

Senior Mechanical Engineer

Projects include:

Enron Oil and Gas, East Cameron 118A (Gulf of Mexico)): - Responsible for generation of P&ID’s, equipment arrangement drawings, process and safety equipment specification, instrumentation selection and specification, generator bid package analysis, flare system backpressure analysis, and piping system design.

Norcen Explorer, Inc., Eugene Island 142 (Gulf of Mexico): - Responsible for providing on-site construction management for installation of 2200 bhp compressor installation, including demolition of existing equipment, and piping, installation of structural steel cooler support platform addition, compressor loadout, installation, and hook-up.

C.J. Schneider Engineering, Inc. - 3/96 to 8/96.

Senior Mechanical Engineer

Projects include:

Nestle Food Company, Inc., (Omaha, NE): - Responsible for specification and selection of meat rendering equipment including meat dryer, vapor exhaust scrubber, DAF slurry and tallow pumps, and by-product conveyance equipment required to produce secondary protein products form discarded meat scraps.

A.G. Processing, Inc., (Crete, NE): - Responsible for installation of hydrogen sulfide storage tank and secondary containment system including revision of existing SPCC and Response Plan pursuant to federal regulations 40 CFR 112, 33 CFR 154, and 33 USC 1321, Sect. 331.

A.G. Processing, Inc., (St. Joseph, MO): - Responsible for generation of oil/hazardous material spill training regimens pursuant to federal regulations 33 USC 1321, Sect. 331, 33 CFR 154, and 29 CFR 1910.120.

The Dial Corporation, Inc., (Omaha, NE): - Responsible for detailed engineering regarding the relocation activities of six (6) soap manufacturing lines including cooling water system line sizing, vacuum and instrument air line sizing, perfume and slurry line sizing, piping and electrical conduit routing and support design, process heat tracing selection and specification, area lighting requirement calculations, and electrical equipment specification, material take-off, and mechanical construction specification generation.

CBS Engineering, Inc. - 8/95 to 3/96.

Mechanical Engineer

Projects include:

Vastar Resources, Inc.: - Responsible for conducting backpressure relief and sizing calculations, system piping modification recommendations, and selection and specification of flame arresting equipment required to increase facility gas throughput form 10 MMSCFD to 70 MMSCFD.

IPC, Malaysia Ltd.: - Responsible for conducting cost estimates, process equipment sizing including wellhead manifolds, pressure vessels, process pumps, process piping, etc., equipment arrangement drawings for 1500 BOPD/40 MMSCFD production platform.

Global Offshore International, Inc., Kole Complimentaire: - Responsible for design and selection and specification of platform deluge and chemical injection systems, and selection and specification of process control instrumentation.

Exxon Company, USA, Galveston 209 A/B (Gulf of Mexico): - Responsible for selection and specification of process and firefighting equipment, generation of hydrotest specifications and drawings, vessel modification calculations and drawings, conducting platform weight, C.G., and feasibility studies regarding the modification and refurbishment of an existing production platform, and preliminary design of 16 mile subsea transportation pipeline including line sizing, trenching/laying specification, and negative buoyancy calculations.

Enron Oil and Gas Company, Ltd., Pelican: - Responsible for system design of oil recovery separator including vessel drawing and design calculation review, P&ID generation, valve selection and specification, structural and mechanical material take-off, existing piping plan drawing modification review, and analysis of existing subsea pipeline, process vessel and process piping line sizing to determine the feasibility of increasing daily production capability from 100 MMSCFD to 210 MMSCFD.

A.G.Morgan & Associates, Inc. - 9/94 to 8/95.

Mechanical Project Engineer

Projects include:

Shell Offshore, Inc., Ram Powell TLP (Gulf of Mexico).: - Responsible for generation of detailed naval, process, mechanical, and electrical system training manuals for utilization during initial personnel training and as operations manuals for the 60,000 BOPD/200 MMSCFD tension leg platform.

Linder & Associates, Inc. - 2/94 to 8/94.

Mechanical Engineer

Projects include:

Texaco USA, E&P, West Delta 49 (Gulf of Mexico): - Responsible for process piping and gas relief system design, selection and specification of process equipment and instrumentation, field survey and on-site construction management for 10,000 Bbl. offshore tank battery installation.

Texaco USA, E&P, Dog Lake Tank Battery: - Responsible for evaluation of existing pneumatic shutdown safety systems and generation of SAFE charts, detailed analysis of existing vent relief system and recommended modifications required to meet API RP-14E guidelines.

LaRoche Chemicals, St. Rose Facility (St. Rose, LA): - Responsible for selection and specification of 1000 scfm screw type compressor for HF vapor recovery system, design of cryogenic bath cooler including process control design, selection and specification of control instrumentation, detailed vessel design, and P&ID generation.

Port of New Orleans, Riverfront Gaming Facility (New Orleans, LA): - Responsible for design of water distribution system to provide firefighting, potable, and washdown water capability including line sizing, detailed support design, selection and specification of equipment, generation of construction specification and cost estimation for the Riverfront Casino Gaming Project.

Project Associates, Inc., - 8/93 to 2/94.

Mechanical Engineer

Projects include:

Greenhill Exploration, Inc., (Gulf of Mexico): - Responsible for engineering design of production and riser tie-in piping and supports, equipment procurement, on-site offshore construction management of platform, piping, and subsea pipeline installation, including electrical, instrumentation, and SCADA hook-up activities.

Exxon Company, USA, South Pass 35 A/B/C/D/E (Gulf of Mexico): - Responsible for field survey activities and generation of “as built” P&ID’s.

McDermott International, Inc., - 9/92 to 7/93.

Construction Engineer

Projects include:

Amoco Netherlands, Well Protector Platforms 826 A/B/C/D (Jebel Ali, United Arab Emirates): - Responsible for generation and maintenance of hydrotest certification packages including establishing testing boundaries and testing regimens, field supervision of hydrotest and instrument calibration activities as acting company representative, coordination of construction activities to ensure material traceability, material and quality control pursuant to DNV and Lloyd’s of London certification requirements.

Elf, Odudu, (Jebel Ali, United Arab Emirates): - Responsible for generation and maintenance of hydrotest certification packages including establishing testing boundaries and testing regimens, field supervision of hydrotest and



Contact this candidate