Post Job Free
Sign in

Level Ii Welding Inspector

Location:
Banda Aceh City, Aceh, Indonesia
Salary:
3.000 USD
Posted:
January 08, 2025

Contact this candidate

Resume:

ERWANDI

Phone / Mobile : +62-822-****-****

E-mail : *************@*****.**.**

Qualification : Welding Inspector CSWIP 3.1,RI PCN Level II,

UT ASNT Level II, MT/PT ASNT Level II.

Curriculum Vitae

Personnel Details

Name : ERWANDI, ST

Place/Date of Birth : Banda Aceh / September 16th,1968

Height/Weight/Blood : 165 cm / 60 / A+

Education / Degree : Graduated from Syiah Kuala University in Banda Aceh 1994, Department of

Mechanical Engineering, Majoring in Energy Conversion

Marital Status : Married

Nationality : Indonesian

Address : -. Jl. Soekarno – Hatta No. 7 Gp. Meunasah Manyet (23371),Great Aceh-Indonesia.

-. Kop. New Holliday Blok F No. 09-10, Jodoh Batam (13400), Indonesia

Phone : +62-822********

+62-852********

Pass Port No : E 0841279 Expire 6 Oct 2027

E – Mail : *************@*****.**.**

*******.*@*****.***

Work Experience : 1996 – Present

Skype : erwandi_majid

Summary Experience

Total experience more than 17 years, and have about 15 years in Inspection & Quality Control in Oil and Gas / Petrochemical Project – EPC Company (Onshore / Offshore) project. Scope of work in Structural / Mechanical and Piping gas station likes inspection line check of piping system, review P & ID, facilities acceptance line check inspection. Other scope as supervision develops and reviewed procedure for quality management system (QMS) NDE procedure, painting-coating procedure, material inspection and review mill certificate, WPS. Familiar with QA /QC document system and traceability record.

Professional Training Attended

Senior Welding Inspector CSWIP 3.2 (Attendant) conducted by TWI (The Welding Institute) Cooperated with PT. DUJ Batam-Indonesia (Sept 20th – Sept 24th 2010)

Welding Inspector CSWIP 3.1 (Certification Scheme for Welding & Inspection Personnel) Issued by TWI Certification Ltd - UK, Certificate No. 333706/02, Expired date March 26th 2028

Welding Inspector, Issued by Institute for Research and Development of Material and Technical Product Industries (B4T) Bandung, Certificate No.0403.12.49.1103. (January – April 2003)

Radiographic Interpreter PCN Level II, Issue by BINDT,

PCN Number: 322487, Certificate Number: T014S3622774, Expire date June 22th 2019

ASNT SNT-TC 1A level II Radiographic Interpreter, conducted by PT. SLV Metropolitan Indonesia, Certificate No.0004365/RI/SLV/IX/23, Expire date October 04th, 2028

ASNT SNT-TC 1A level II Ultrasonic Testing, conducted by dB School of NDT Batam,

Certificate No: UT-R21137, Expire date December 09th 2026

ASNT SNT-TC 1A Level II Magnetic Particle Testing, conducted by dB School of NDT Batam,

Certificate No: MT-R21167, Expire date December 12th 2026

ASNT SNT-TC 1A Level ii Liquid Penetrant Testing, conducted by dB School of NDT Batam,

Certificate No: PT-R21167, Expire date December 12th 2026

Blasting and Painting Inspection (In-House Training) Conducted by Mujianto Ali (NACE Level III #6858)

Pipe Stress Analysis (Caesar II) held by Ap-greid Oil & Gas Design Course (Augustus 9th-31st 2008).

Standum Body Maker and Schneder Filter, Issued by Jeddah Beverage Can Making co.Ltd (October 2001)

Safety Training Attended

BOSIET (Safety Induction, Sea Survival, Helicopter Safety and HUET Including EBS, TEMPSC Familiarization, Fire Fighting and Self Rescue, Emergency First Aid) OPITO Vantage No : 1082080, Conducted by M&O INDONESIA, Certificate No. 000 101 402, Expire Date November 26th 2014.

Internal Auditor Safety Training OHSAS 18001: 2007, issue by TUV Rheinland,

Certificate Registration No. 130*******/15 (April 26th – April 28th 2010)

Fundamental Safe Work Practice conducted by Safety Tripatra Fluor Consortium (November 3th 2008)

HES Orientation conducted by Safety Tripatra Fluor Consortium (November 4th 2008)

Professional Experience

Petrosea :

Project : Free Port Manyar Refinery Project

Job Description : Prepare schedule preservation Mechanical Equipment, Electrical & Instrument,

Structural and Piping.

Prepare Log Sheet for Preservation

Monitoring Preservation Activities

Inspection incoming Material (FRP Tank, Pump}

Inspect Pump Installation: Padding Elevation, Center Line, Leveling, Sott Foot

Pre-Alignment and Final Alignment.

Inspection Static Equipment Installation: Padding Elevation, Center Line, Nozzle

Nozzle Orientation, Plumness.

Position : Lead Pump QA/QC Preservation

Duration : 15 March 2024 – Present

Worley S.E.A : On Be Half Of Pertamina ( PMC )

Project : EPC RDMP RU-V Pertamina Balikpapan Project

Job Description : Witness Welder Test

Review WPS

Inspection Pipe Material

Inspection Fit/Up and Visual Welding

Visual Inspection Fit/Up Shell Plate Tank

Visual Welding Vertical/Horizontal Shell Plate Tank

Surveillance Inspection Tank Erection Peaking and Banding.

Surveillance Inspection Tank bottom leak test.

Inspection Fit/Up and Visual check Piping at Convection Fire Heater

Inspection Fit/Up and Visual Welding 1 first Regenerator to 2nd Regenerator.

Inspection Embedded Plate and Anchor Bolt Position at GTG/HRSG, Boiler,

Inspection Dimensional, Verticality/Plumbness Steel Structural, Stack Boiler Platform

HRSG, Witness bolt tightening

Check Clearance Gas Turbine Diffuser

Inspection Padding Elevation, Center Line and Plumbness and Grouting of Static

Equipment:

Fire Heater, Stripper, Splitter, Column, Exchanger, Air Fan Cooler, Regenerator.

Inspection Internal Tray of Column.

Check Elevation padding plate, Center Line and Levelness Pump.

Witness Pre-Alignment Pump

Surveillance Preservation Equipment, Monitor Nitrogen Pressure.

Monitoring Preservation Equipment

Issue PMAR (Positive Monitoring Action Report), Issue NCR.

Review Document at ACONEX.

Position : Stationary Equipment Inspector/Rotating ISB and OSBL

Duration : 2nd July 2020 – 30 November 2022

CSTS (Chiyoda, Saipem, Tripatra and SAE):

Project : BP Tangguh LNG Expansion Project Train 3.

Job Description : Inspection Visual and Dimensional of Roof Plate, Bottom Plate, Annular Plate,

Top Angle and Shell Plate of Tank

Inspection of Anchor Bolt (Center Diameter, Projection, Pit to Pit) of Static,

Package and Rotating Equipment. (Boiler Stack, F.D Fan Boiler, Acid Gas Absorber, Acid Gas Stripper, Acid Flash Drum, ect )

Inspection Padding Elevation for Static, Packed and Rotating Equipment (Boiler

Stack, F.D Fan Boiler, Acid Gas Absorber, Acid Gas Stripper, Acid Flash Drum, etc.)

Inspection Verticality / Bolt Tightening Static Equipment (Acid Gas Stripper)

Inspection Assembly and Installation Air Cooler Condenser Package:

Review WPS, Welder Certificate, Electrode and Welding Machine Certificate.

Inspection Welding Consumable.

Inspection Welding Machine Function Test.

Monitoring Welding Activity, Before, During and after Welding.

Witness Bolt Tightening Air Cooler Upper Structure and Super Structure.

Position : QC Mechanical / Welding Inspector

Duration : 11 February 2019 – 21 October 2019

Wartsila :

Project : Kraken FPSO Power Generation Module ( North Sea ), PT. Wasco Engineering

Batam Yard

Job Description : Inspection Pad Eyes, Mono Rail and Over Head Crane.

Witness Load Test for Pad Eyes and Monorail

Inspection Exhaust Stack (WHRU, Steam Drum, Bellow, Exhaust Damper, Silencer for Mechanical Completion.

Review MDR for Mechanical, Structural.

Position : Sr. QC Inspector

Duration : 17 December 2015 – 14 October 2016

Air Energi :

Project : Exxon Mobile Cepu Ltd, EPC 1 Banyu Urip Project

Job Description : Monitoring and witness of fit-up, welding, visual inspection and dimensional

Inspection. Random check of welding parameters, consumable.

Line Check, Witness Hydrostatic Test, Witness PWHT

Review Daily Welding Report

Flange Inspection

Position : QC Piping Inspector

Duration : 6 June 2015 – 30 November 2015

Kellogg Joint Venture Gorgon (KJVG):

Project : Chevron Australia-LNG Jetty and Marine Structure (Gorgon Project-Barrow Island)

Contraction LNG Jetty- Superstructure Loading Platform East and West Deck,

Pontoon 1, 2, 3 at Saipem Indonesia Karimun Branch.

Job Description : Monitoring and witness of fit-up, welding, visual inspection and dimensional

Inspection. Random check of welding parameters, consumable.

Witness Hydrotest for fuel line and potable water line

Review welder certificate

Review fit-up/visual report

Position : Structural Welding Inspector Representing of Client (KJVG)

Duration : 1 November 2013 – 20 December 2013

Kellogg Joint Venture Gorgon (KJVG):

Project : Chevron Australia- LNG Jetty and Marine Structure (Gorgon Project - Barrow Island)

Construction Super Structure Jetty Head, Marine Operation Structure, Expansion

Looping Structure, Mooring and Berthing Dolphin Structure, Road Way Structure

At PT. Hanjung Indonesia.

Job Description : Monitoring and witness of fit-up, welding, heating rectification, visual inspection

and dimensional Inspection. Random check of welding parameters: consumable

Volt, ampere, travel speed inter-pass temperature etc.

Witness Welder Test

Witness PQR

Review UT Report

Review MDR

Position : Structural Welding Inspector representing of Client (KJVG)

Duration : 18 January 2011 – 30 June 2013

PT. Global Process Systems

Project : Dragon Tortoise Gas Compressor (Booster Compressor Module)

Job Description : Inspection Inter Stage Cooler, Discharge Cooler, Inlet Scrubber, Inter Stage

Scrubber, Discharge Scrubber, Fuel Gas Filter Separator, Fuel Gas Super-Heater

And Piping Bulk Material.

Review Vendor Document, including:

Vendor Procedure

WPS / PQR, Welder Certificate, I T P, NDE Procedure

Welding Traceability, Dimensional and NDE Clearance Report

Certificate (Material, Calibration etc.)

Review Radiography Film

Witness Dimensional Inspection

Fit Up and Visual Inspection of Weld

Witness Hydrostatic Test

Witness FAT for Inter Stage Cooler and Discharge Cooler

Witness Hydro Static Test and Fusion Test for Control Valve, Actuator Valve

Mechanical Completion

Review MDR

Position : QC Mechanical / Surveillance Inspector Scrubber (Petra Fabricators SDN BHD),

Air Cooler (S&W Heat Exchangers Pte Ltd, Filter Separator (Peerless Mfg. Co),

Super Heater (Exheat Pte. Ltd)

Duration : 7th December 2009 – 27th September 2010

Tripatra Fluor Consortium

Project : Sumatra Light North (Chevron Area)

Jobs Description : Fit Up and Visual Inspection of Weld

Line check Flow Line

Witness Hydrostatic Test

Review WPQ/PQR & Welder Certificate

Review Welding Traceability Record

Position : QC Piping Inspector

Duration : 1st November 2009 – 1st December 2009

Germanischer Lloyd Nusantara

Project : Certification and Approval PQR/WPS Air Separator for Siemens

Jobs Description : WPS/PQR and Welder Certification

Verification of Material

Witness WPS / PQR

Witness Welder Performance Test

Position : QC Inspector (freelancer)

Duration : 13th August 2008 – 29th August 2008

Nippon Steel Engineering Co. Ltd

Project : NSC – PGN South Sumatera West Java (SSWJ) Pipe Line CP – 4

Jobs Description : Review vendor & subcontractor document, including:

Quality Plan

WPS/PQR

Welder Certificate

Certificate (Material, Inspection / test, calibration, etc.)

Procedure, Datasheet, Drawing, etc.

Welding Traceability, NDE report.

Manufacture Data Record (MDR)

Perform Visual, Dimensional, Material, and Panting Inspection

Welding Inspection of Piping Installation

Witness Hydrostatic Test

Review Radiography Film

Witness FAT and SAT for Metering and Regulating System

Witness SAT for UPS

Completion of QA/QC Documentation work for CP – 04

Position : QC Engineer

Duration : 1st May 2007 – 31st July 2008

PT. IKPT (Inti Karya Persada Teknik)

Project : Onshore Processing Facility and Sales Gas Pipeline

(Amerada Hess, Indonesia – Pangkah Limited)

Jobs Description : Resident Inspector at PT. Alphacone Valfindo (Valve Manufacture)

Review Vendor Document, including:

WPS / PQR, ITP, Drawing and Procedure.

Material Certificate, Painting report

Manufacture Data Report (MDR)

Perform Visual / Dimensional Painting Inspection for:

Gate, Globe, Check, Butterfly, Wafer Check and Ball Valve

Witness Hydrostatic Test for:

Gate, Globe, Check, Butterfly, Wafer Check and Ball Valve

Issue Inspection Release Notice (IRN)

Position : QC Inspector

Duration : 1st April 2006 – 30th April 2007

PT. IKPT (Inti Karya Persada Teknik)

Project : Kujang 1 B, Fertilizer Co.Ltd. Cikampek, West Java

Jobs Description : Welding Inspection on Piping Installation

Witness Welder Performance Test

Review Radiography Film

Line checked of Piping Installation

Prepare NDE Clearance for Test Package

Witness Hydrostatic / Pneumatic Test of Piping Installation

Done Post Test of Piping Installation

Witness Center Line of Belt Conveyor Frame

Witness Tightening Bolt for Belt Conveyor Frame

Witness Alignment Motor and Pump

Prepared Inspection Document for Turn Over to Client

Position : QC Inspector Piping / Mechanical

Duration : 4th October 2004 – 31st March 2006

PT. IKPT (Inti Karya Persada Teknik)

Project : Sumbagsel Gas Development Project (PPGS) Package II & III

Jobs Description : Review vendor & subcontractor documents, including:

Quality Plant

Procedure, Datasheet, Drawing, etc.

Position : QC Engineer for Had Office Development

Duration : 22nd June 2004 – 3rd October 2004

Jeddah Beverage Can Making Co. Ltd

Project : N/A

Jobs Description : Body Maker Maintenance (Monthly PM, Quarter PM, Annual PM)

Position : Maintainer

Duration : 1st October 2001 – 1st October 2002

Continental Can of Saudi Arabia Co. Ltd

Project : N/A

Jobs Description : Washer Maintenance (Monthly PM, Quarter PM, Annual PM )

Position : Maintainer

Duration : 1st November 1999 – 1st October 2001

PT. Hanjung Korea Heavy Industry

Project : PT. Cibinong Cement Plant

Jobs Description : Anchor bolts checked for location, elevation,

Alignment of Part of transportation checked, bolt and nuts tightened

Checked Driver Installed and Alignment and position.

Checked Alignment Pump and Motor.

Position : Mechanical Engineer

Duration : 21st April 1997 – 3rd May 1997

PT. Trakindo Utama

Project : Free Port Mc. Mooran / Kelien Equator Mining

Jobs Description : Prepare Work Shop Drawing

Support All Facility

Make Maintenance Contract

Position : Service Analyst Trainee

Duration : 4th March 1996 – 3rd March 1997

Job Training

Company : Mobil Oil Indonesia Inc. Lhok Sukon. North Aceh Indonesia.

Subject : Gas Tubine

Duration : September 1992 – October 1992

Note :

Reference:

Name : John Young

Position : Lead QA/QC KJV Gorgon Project

Email : ***@*********.**.**

Phone Number : +44 (0-780*******

Name : Kevin Madden

Position : QA/QC Manager Global Process Systems

Email : **************@*******.***

Phone Number : +62-812-****-****

Name : Michael Grimley

Position : QA/QC Coordinator Global Process Systems

Email : *******.*******@*****.***

Phone Number : +62-813********

Name : Katsuya Tanaka

Position : Project Manager Nippon Steel Construction, SSWJ CP – 4 Project

Email : ******.*******@***-***.**.**

Phone Number : +813********

Name : Endar Koestarjadi

Position : QA/QC Manager IKPT, Kujang 1B Project

Email : *****.***********@****.***

Phone Number : +628********



Contact this candidate