Post Job Free

Resume

Sign in

Survey Engineer Civil Engineering

Location:
Al Dafna, Qatar
Salary:
16500
Posted:
September 24, 2023

Contact this candidate

Resume:

Jayanta Mandal

B.E CIVIL ENGINEER

CHIEF SURVEYOR

Phone: +974-********

E-mail: adzwoz@r.postjobfree.com

Qatar Driving license: Valid

Languages Known: English, Hindi, Bengali

Notice Period: One month

CAREER OBJECTIVE

An accomplished Chief Surveyor with 25 years of experience in the Construction Industry and Oil and Gas as a Survey Engineer. Experience in structural design, project management, site coordination, and engineering. Seeking a senior-level assignment in engineering, civil, road, highway, INFRA, GIS survey, Tunneling, 3D surveys, laser scanning survey, photogrammetric survey, hydrographical surveys, and micro tunnelling works. International experience in Qatar, UAE, and Oman. Skilled in various surveying equipment and IT software. Strong, soft skills in hardworking, focus, good people skills and team management. EDUCATIONAL QUALIFICATION

B. Tech in Civil Engineering, Maulana Abul Kalam Azad University of Technology 2019.

Diploma in Survey Engineering 1997 (3 Years), West Bengal Survey Institute,

Matriculation-W.B.B.S.E. Higher Secondary- W.B.B.S.E, 1993 TECHINICAL KNOWLEDGE & SURVEY SOFTWARE USED

AutoCAD

Civil 3D

Micro Station

Terra Model

12D

LD

3D max

List CAD

LFM

Inovex

Cyclone

IBIS

Auto plan

MS Office

EQUIPMENT MANAGED:

Automatic Leveling Instrument, digital level, all kind of Theodolites, All kind Total Station

Electronic Distance Meter (E.D.M), Laser Aligner, Plane Table, Compass

G.P.S (R.T.K, & D.G.P.S) S.L.R Camera for videogrammetry survey, IBIS

Laser Scanner for three dimensional surveys (C10, C20, and Z&F)

And other Instrument for GIS survey (RD1000, GPR Leica) Bathymetry

Echo sounder

WORK EXPERIENCE:

Sl.

No.

Span of

Work

Name of Company Project

Involved

Work Assignment

1 July 1997-

June 1998

M/S Larsen & Turbo

E.C.C. Construction

Group Haldia

Land Surveyor

Haldia

Petrochemical

West Bengal

Setting out bldg. and

superstructures, pile cap, pipe rack,

vertical checking of vessel and pipe

rack.

2 July 1998-

August

1999

M/S Mitsubishi Japan

Assistant Survey

Engineer.

I.O.C.L. Haldia

West Bengal

Control point pining. Setting out for

bldg. Road Cable trench, pipe rack,

oil tank etc. Setting out and level

marking for Golf Course.

3 August-

1999-

July 2000

M/S Larsen and Turbo

Ltd. E.C.C.

Construction Group

Kandia

Survey Engineer.

Cross Country

Pipeline

Project

(V.K.P.L.)

Gujrat

Setting out the pipeline with Road

Cross Nalla Cross and River Cross,

vertical plane-setting out sag bend

and over bend and trench making

under the river.

4 August

2000-

May 2002

M/S Skanska

Cementation India Ltd.

Chennai

Survey Engineer.

Chennai Petro

Co. Ltd.

(C.P.C.L.)

Tamil Nadu

Control point lining by Ts, setting

out pile point, pipe rack, pile cap

etc. Vertical checking vessel and

pipe rack and bolt lining for

conveyor structure.

5 June 2002-

August

2003

M/S Skanska

Cementation India Ltd.

Khandala

Survey Engineer.

Tata hydro

Power Project

Maharashtra

Control point lining on top of hill by

TS and GPS, setting out the

alignment of vertical and horizontal

tunnel, marking for blasting,

control point shifting earth surface

to inside of tunnel with levels,

setting out of superstructures for

turbine.

6

August

2003-

Feb 2004

M/S Skanska

Cementation India Ltd.

Survey Engineer.

U D Dam

Project

Rajasthan

Control point lining by Ts, setting

out the alignment of vertical and

horizontal, Position on dam surface

and detail survey of catchment

area.

7

March

2004-

April 2005

A.P.T.C. Oman

Road and Highway

Surveyor

Road Project in

Oman Center line–marking by T.S. vertical

and horizontal curve setting out,

coordinate shifting, level transfer,

Muscat to

Sohar Highway

(6Lane)

road marking, detailing for contour

map.

8 May 2005-

Dec 2007

Al Hamra Construction

Co. (RAK Ceramics)

Ras Al Khaimah U.A.E.

Senior Surveyor

Real Estate

Development

Project

Ras AL

Khaimah

Work involved in lining the

horizontal and vertical control

points, setting out the roads, bldg.,

bridges, and piles, earth work

survey, like sub-base road-base and

asphalt

9 Dec-2007-

July-2015

Consolidated Gulf Co.

WLL, Qatar

Sr Survey Engineer

Qatar

petroleum

NGL plant.

Onshore:

3D Survey,

Laser

scanning,

Video

graphical

survey. IBIS

Qatar

petroleum

Production

stations II, III,

IV and Halull.

Offshore:

3D Survey,

Laser

scanning,

Video

graphical

survey. IBIS

Work involved, Managing the

survey & scanning team,

coordinate with client &

subcontractor.

Arranging material required

Developing drawings.

10 Sep-2015-

Dec 2017

QDVC, Qatar

Sr Survey Engineer

NOH 2.

60 KM Road

Project With

12 Bridge

Work involved, Managing the 6-

survey team, Coordinate with client

& subcontractor.

Preparing Survey report

11 Dec 2017-

present

QBC

Package three

Chief Surveyor

Roads and

Infrastructure

in Doha

Industrial Area

– Package 03

20km Micro tunneling (3000mm to

400mm) with 80 Shaft & 42 km of

road and infrastructure Work

involved, Managing the 10 -survey

team, Coordinate with client &

subcontractor. Preparing Survey

report

KEY RESPONSIBILITIES MANAGED:

Managed and executed all kind of surveys and setting out work.

Managed and supervised site civil engineering works in a project section as a section engineer.

Supervised health, safety, and environment aspects of the jobs as a Health and Safety Officer.

Conducted the preliminary topography survey of the sites, set out primary control and creating local grid for setting out.

Managed the surface co-ordination survey / triangulation survey for excavation and constructions of tunnel, road, pipeline, and railway jobs and monitored the horizontal and vertical alignment for the same.

Monitored record and drawing controls, raised NCR and technical queries.

Prepared as-built drawings by using AutoCAD software and as per the client requirements.

Co-ordinated with clients and architects, subcontractors, and senior management for smooth execution of the projects.

Maintained records of delays and claims along with QS and commercial team.



Contact this candidate