Page *
MOHAMMAD MUSTAFA HAIDARY
MEP Manager, Senior Mechanical Engineer
Airports, Hotels, High rise buildings,Palaces, Hospitals, Universities, Commercial complexes and Residential units,Schools, Infrastructure
(Sewer, Storm water, domestic water, irrigation network) . Nationality : Syrian
Date of Birth : Jan2nd, 1983
Address : RIYADH, KSA
Tel. (Saudi) : +966-********* (mob)
E-mail : ****.*******@*****.***
_Linkedin URL: linkedin.com/in/mohammad-haidary-2b144b48 Education : Bachelor of Science in Mechanical Engineering, Aleppo University, Syria 2007.
Area of Experience:
Project Management.
Construction management.
Value Engineering.
Design& Supervision.
Construction and Maintenance.
Pricing & Tendering.
Project Planning.
Quality Control and aAssurance.
Testing and Commissioning.
Site safety management.
EXPERIENCE:
Albawani co. Saudi Arabia 2 Years PM
Saudi Bin Laden Group Saudi Arabia 10 Years PM
Advanced Vision Saudi Arabia 2.5 Years CM
Alarrab Co. Saudi Arabia 1 Years CM
Page 2
KEY SKILLS
Responsible for ensuring the execution and coordination of all the construction engineering services for the mechanical & electrical works, overseeing the direction and administration of the contractors and their compliance to the quality assurance program, cost control and schedule commitments.
Directly responsible for the project management, and overseeing the site supervision and the testing and commissioning of mechanical & electrical engineering systems for diverse type of projects, particularly Airports,Hotels, High rise buildings,Palaces, Hospitals, Universities, Commercial complexes and Residential units, Infrastructure
(Sewer, storm water, domestic water, irrigation network, Schools, RO& STP plant. Have been actively engaged on projects from the initial design concept phase and up to final handover of the project to the client.
RESPONSIBILITIES: Included leading the mechanical & electrical teams through the management and administration of design phases, tender documents and tender evaluation, site supervision, testing, commissioning and handing over of the installed electrical & mechanical engineering systems, including building automation and management systems.
Project duties also included project management of all mechanical services, including the operation and maintenance management and training of the client’s staff on the operation of the mechanical & electrical systems.
EXPERIENCE:
I have Designed, Procured, Supervised and Tested the installed of various Mechanical
& Electrical equipment’s/systems that includes the following: Mechanical Systems: Air cooled chillers, Chilled water network, Chilled water pumps, F.C.U. A.H.U. System, Supply fans, EX fans, Pressurization fans, Ducting, Fire Fighting system, Fire pumps Sprinkler network, FM200, Plumping System,Baggage Handling System (BHS), Water Supply network,Drainage network, Transfer Pumps, Booster pumps, Lifting pumps, Circulating pumps, water tanks, Sauna & Steam system, Swimming Pools, wave pool, lazy river,lift stations, Gas tanks, LPG system, Irrigation system, Sanitary fixtures, STP system, RO system, wells etc… Electrical Systems: RMU, M.V Panels, Transformers, Electrical installation (Internal and External), Switchgears (MDB, SMDB, MCC…), M.V& LV power Cables, Building Management System & CCMS System, Addressable Fire Alarm System, Internal & External decorative light fixture, Diesel Generators, Lightning protection system, Lifts, Escalators, Underground utilities.
Infrastructure MEP services: Pre-insulated black steel pipes fpr chiller system size pipe up to 1200mm dia, GRE pipes for fire fighting system & gray water & Potable water size pipes up to 1000mm dia, GRP pipes for storm & foul water size of pipes up to 1300mm, Page 3
Ductile iron pipes for firefighting system, Cast iron pipes for waste water drainage system, HDPE pipes for Fire fighting & irrigation & domestic water, Reinforced concrete pipes for storm water, Medium Voltage cables 33KV& 13.8 KV, Low voltage cables up to 630mm2, Data and telephone network, Liber optic cables, Street lighting, Mechanical and Electrical Manholes, Utilitu tunnel. TBC’s School Project (60 Schools) $ 1200 M
Company : Albawani – Jeddah, Saudi Arabia
Period : Sep 2021 – on wards
Position : Sr. Mechanical Engineer
Construction Manager: Khatib & Alami
Sub-contractor Company : Hashem, Inshaat, Green field Main project elements include:
Main Building
Multi porpose hall
Gaurd house
Gate
Water Tank, Holding Tank
Pump room
External Networks.
King Abdul-Aziz International Airport Development $ 2700 M Company : Saudi Binladin Group – Jeddah, Saudi Arabia Period : October2011 – Aug 2021
Position : MEP Coordinator
Client : General Authority of Civil Aviation
Construction Manager: Dar Al-Handasah
MEP Sub-contractor Co. Advanced Vision, Icad, CCC, Orascom, Vision Network, Inma Main project elements include:
Passenger Terminal Complex, 670,000 sq m floor area, a state-of-the-art facility spread over a spectacular twin crescent footprint
46 contact gates, 94 boarding bridges, including double deck A380 access
Class-leading lounges, airside hotel, catering and retail facilities
Internal Automated People Mover linking the passenger processors and the international hub
Transportation Centre with integrated rail station, for seamless travel connections
Sophisticated Baggage Handling System, over 60 km of belts
State-of-the-art Air Traffic Control Technology with Landmark Control Tower over 136m high
Page 4
Taxiways, roads, tunnels, utilities networks, support facilities on a scale to match the main buildings
Fuel tank farm and hydrant network
Plant nursery and garden centre to serve the airport and the broader community
Radio Buildings (4)
Data Center (2)
Fire Fighting building
Crisis Management
Meteorological Observation Building
Utility Tunnel
Hotel
APM Automated People Movement maintenance building King Saud Bin AbdAlaziz University for Medical Health $ 1480 M Company : ADVANCED VISION – RIYADH, SAUDI ARABIA
Period : June01, 2009– Sept 2011
Position : MEP Sr.Engineer
Client : National Guard Health Affairs
Consultant : Dar Al-Handasah
Major Projects handled
158 Villas.
STP
Female Collages (Medical, Nursing)
Underground Utilities
Utilities Building
Company : ALARAB CONSTRUCTION CO. YANBU, SAUDI ARABIA Period : APRIL 02, 2008 - May 2009
Position : Site Engineer
Client : MADA INDUSTRIAL GROUP
Major Projects handled
Pre-Cast Factory SR 250M
Water Proof Factory SR 300M
Factory : ALFRAT FOR TRACTORS INDUSTRY, ALEPPO, SYRIA. Period : June 11, 2006 – Feb 30, 2008
Position : Quality Engineer