Post Job Free

Resume

Sign in

Electrical Engineer Power Plant

Location:
Faisalabad, Punjab, Pakistan
Posted:
September 24, 2023

Contact this candidate

Resume:

HAMZA RASHID

ELECTRICAL ENGINEER, PEC REG NO. ELECT/74802

Bhalwal. Punjab, Pakistan

+923*********

adzw7y@r.postjobfree.com

Proactive individual proficient in industrial electrical & instrument control systems. Seeking a respectable position with a progressive organization to utilize 4 years of professional engineering experience in developing support to company personnel as well as to subcontractors to ensure that the project will comply with all mandated engineering specifications and design.

PROFIE SUMMARY

Engineer provides technical direction to Design, Erection, Operation & Maintenance of the Power Plant. it is necessity to understand SLDs, PFDs, P&IDs, Hydrolic Diagrams, civil drawing etc..

Installation and operation of Bagasse Fired moving grade Boiler 60 ton / hr, 110 bar, 525 c.

Installation and operation of AEG german High pressure (HP) Steam Turbine (back pressure) 11.3MW, 10000rpm, 110Bar, 525 c and Low pressure (LP) Steam Turbine (condensing mode) 3.1MW, 5925rpm, 135 c.

Electrical Power & Control: Installation, Operation and Maintenance of 1250KVA cummins Ignition Diesel Engines for baggasse fired Power Plant boiler startup also commisioning of DSC controller for DG control.

Cable Tray Fabrication, lying and dressing along root properly.

LV, MV & HV Generation, transmission (Overhead & under ground), Distribution & protection control along Bus bar continuity check.

Installation of XLPE armored HT cable for Transmission and do proper termination kit for high tension vovolta.

Installation, maintenance & operation of AEG 18000KVA, 5.25 KV, IC B, slip Ring Generator along with water cooling system.

Installation and operation of Direct exciting AVR and MVR panel for volt up or excitation of 18000 KVA AEG Slip ring generator, can control by AGC-4 controller also communicate through transducers (UV, OV, OC, OF, UF, PF, etc)

Switchgear protection through BBC & DELAB DP-34.

Installation and operation of NGR earth fault protection & differential protection of Generator.

Installation and operation of power factor controller and improve generator Load.

Installation and operation of all types of starters, Soft starters, VFDs i.e ABB, Siemens, INVT, NEL & winners. For Remote control, Consult manufacturer’s manual to wire with Controller, PLC & Scada.

Installation and operation of China GRE 12500KVA ONAF Transformer 5.5KV/11KV with OLTC (MR) For the synchronization with old power house 10MW.

installation and operation of 1600KVA ONAN, 5.5KV/400V transforms for Diesel Generator, boiler auxiliary supply, cooling tower and injection pump stations.

Installation and operation of 505 woodward microprocessor electronic controller for HP steam turbine 110 bar, 525 c and also for LP Steam Turbine (at pressure mode 1.5bar) 3.1MW, 5925rpm, 135 c for hydrolic actuator control.

Installation and operation of RICO-WERK 55KV TR controller for the ESP of 60 ton Boiler.

Installation and operation of Toshiba VCBs with DEEsys over Load protection relays.

Operation and maintenance of PMG Generator turbine set (Peter brotherhood 3MW) GEC Rugby England with master trip unit protection and sync panel.

Mill house & Boiler house Interlocking & safe control.

Overhead Transmission, Distribution, Protection and control of Smart Grid design.

Installation, Operation and maintenance of SF6 Switch Gear (Breakers), HT(VCB) & LT (OCB, ACB) Breakers and controls.

Load Sharing and management of Power Stations (3MW LT with 4MW HT).

Synchronization of Diesel Generator 500KVA with Steam Turbine Generators (3MW, 4MW)

Load Sharing and management of Power Station.

Chemical Treatment : High pressure Boiler chemical treatment to generate magnetize layer because of avoid corrosion.

Solar Plant : Installation and operation of 260KW solar plant (cs6w-545m5 canadian plates) on grid system at jsml along with hawawei inverter (Sun2000-60KTL), communicate with DG controller to protect Reverse power. Analyse and examine through Fusion Solar App.

Water Treatment: installation and operation of RO plants 36 m3/h, 30 m3/h along Ultra filtration, multimedia filter 50 m3/h with EDI and degesifier system ( required TDS 10-20 ppm, PH > 9).

Turbine section: Installation of oil assembly line of 11.3 MW back pressure & 3.1 MW condensing turbines for rigid and flexible coupling lubrication & turbine hydrolic actuator as per drawing. Check all safeties i.e solenoid trip, over speed trip & drain oil tripping unit.

Installation and operation of I (mA) to H actuator for governing control of turbine.

Involve with overhaul and maintenance of steam turbine i.e throttle valve, thrust pad, gear bearing, rotor maintenance etc.

Installation of surface condenser of 900 cubic meter to condensate steam.

Installation & operation of Vaccum pump and condensate multistage pumps with condenser for condensing Low pressure turbine.

Installation, operation and maintenance of cooling tower along with 1800 cubic meter pumps to maintain DT =10 c.

Instrument work : Involved with installation of different types of instruments for master control i.e RTDs & Thermo-couple along with TT, Orifice plate for measurement Line flow, Level transmitter, pressure transmitter, pressure switch, proximity sensors, magnetic pickup units etc.

Expert to understand all types of control and power SLDs, PIDs, hydrolic system diagrams as well as civil diagrams.

Experiance

1.Electrical Engr at JAUHARABAD (JSML), JAUHARABAD, PAKISTAN

Oct 2017 to Nov 30 2022

2. Site Engr in Kingdom of Saudia Arabia to present

RESPONSIBILITIES:

Supervision of all pre-commissioning and commissioning testing of all electrical equipment’s like generator, motors, VFDs, Soft Starters, switchgears, transformers, instruments, cables etc. according to relevant codes and standards.

Estimate and assign the resources such as manpower, materials, equipment’s, tools required for all electrical and related works prior to execution.

Interpret construction drawings and study the contract documents, BOQs, applicable standards and specifications prior to execution of any jobs.

Responsible to plan the execution of all electrical related works and to co-ordinate the works with mechanical and civil groups.

Responsible to submit site daily progress reports, inspection requests, estimates and all applicable monitoring reports on regular basis as required.

Responsible for the safety of all electrical groups, personnel of the project by ensuring that the project execution will be done according to all applicable HSE standards.

Troubleshooting Breakdown maintenance, Preventive maintenance, Periodic maintenance TBM (Time Based Management), Predictive maintenance of SCD (Safety critical devices).

EDUCATION

BSc ELECTRICAL ENGINEERING, CET, University of Sargodha, PAKISTAN OCT 2017

Coursework was consisting of Electrical and Electronics Subjects:

Power Plant Engineering (Boiler, Turbine, Generator)

Power Generation, Transmission, Distribution and Protection

Power Electronics

Electro mechanical systems

Engineering Economics

Instrumentation control

SKILLS

Induatrial instrumentation & Automation

Task management

MS Office

Communication skills



Contact this candidate