Miguel De Los Santos
Corpus Christi, TX 78414
Cell: 361-***-****
Email: adzvlk@r.postjobfree.com
Highlights of Qualifications:
Excellent communication and writing skills
Trouble shooting and complex problem-solving aptitude
Skilled in conducting quality control of materials, craftsmen and work performed
Excellent management and organizational skills
Experience of various industrial piping processes for projects
Professional judgment and decision-making skills
Strong background in Math & Pipe Fabrication
Perform and execute project activity in a timely manner while being cost efficient
Analyzing Information, Estimating, Bidding, Planning, Reporting Research Results, Data Center Experience, Strategic Planning, Attention to Detail
Professional Experience:
Pipe Superintendent/Construction Manager
Fabrication of pipe spools; Fabrication of Carbon Steel; Stainless Steel; Alloy 20 (Super stainless steel); Inconel; Hastelloy & Monel pipe spools. Hydro-testing; Installation of Pipe Spools; Blueprint reading.
Managed and coordinated Pipe packages, NDE (Hydro-Tests, X-Rays, etc.) Heat stress, document, and process Pipe packages, and coordinated with Third Party QC and Final walk downs.
Supervised everyday activities for installation and fabrication of pipe.
Supervised a variation of (120 employees); welders, general labors, pipefitters, foremen, and general foremen.
Scheduled various activities for workers and assisted in delivery of appropriate materials and equipment.
Ensured compliance with all safety regulations and mitigate all risks.
Evaluated all pipe specifications for projects and ensured compliance to installation process.
Planned, scheduled, and performed all required engineering functions.
Monitored all phases of project from job implementation to completion of piping Fabrication/Installation.
Prepared progress reports for projects and assisted in resolving all issues efficiently.
Interpreted all mechanical and piping drawings for projects.
Consulted with clients to define objectives and develop scopes.
Planner/Estimator
Created projects utilizing P6, assigned resources, leveled manpower, scheduled projects based on critical path. Set base lines, updated, and modified schedules. Distributed daily updated printed schedules. Walked down packages, estimated man hours and manpower to complete packages. Built packages, created BOMs and submitted to have material ordered. Submitted estimates to client for approval. Tracked and logged delays. Tracked, estimated, stepped out, and submitted RFI for approval. Ordered material, requested, and delivered PO’s to suppliers. Worked with vendors to assure quality material for all projects.
Prepares work to be estimated by gathering proposals, blueprints, specifications, and related documents.
Identifies labor, material, and time requirements by studying proposals, blueprints, specifications, and related documents.
Computes costs by analyzing labor, material, and time requirements.
Resolves discrepancies by collecting and analyzing information.
Presents prepared estimate by assembling and displaying numerical and descriptive information.
Prepares special reports by collecting, analyzing, and summarizing information and trends.
Maintains cost database by entering and backing up data.
Maintains technical knowledge by attending educational workshops and reviewing technical publications.
Contributes to team effort by accomplishing related results as needed.
Planned scheduled maintenance outages as part of preventive maintenance program.
Employment History:
01/22- Present Brown & Root Planner/Asst T/A Manager Bishop, TX
10/21 – 12/21 Worley Planner
Citgo Refinery Corpus Christi, TX
03/21 – 10/21 B & E Resources Superintendent Ingleside, TX
Chemours Chemical Plant
02/18- 3/21 Ohmstede Industrial Services Pipe Superintendent/
Planner/Estimator Corpus Christi, TX
09/17- 12/17 Altair Strickland Pemex Plant
Pipe Superintendent Tampico, Mexico
08/15-08/17 Brock/Jacobs Celanese Plant
Pipe Dept. Superintendent Bishop, TX
7/15 – 08/15 Bay Ltd. Valero Plant- General Foreman Corpus Christi, TX
09/14 – 07/15 Zachary Construction Citgo Refinery - Superintendent Corpus Christi, TX
07/13 - 09/14 Kellogg Brown & Root DuPont Chemical Plant
Superintendent Ingleside, TX
05/12 – 07/13 PMI Superintendent Corpus Christi, TX
01//12 – 05/12 Audobon Engineering Conoco Phillips
Construction Manager/Field Engineer Mont. Belvieu, TX
1/11 – 01/12 Saulsbury Industries Southcross Energy
Construction Manager/Field Engineer Odessa, TX
09/11- 11/11 Bay Ltd. Valero Plant-General Foreman Three Rivers, TX
07/11 – 09/11 J.V. Piping DCP Energy- General Foreman Bishop, TX
03/11 – 05/11 PWC Shop Supervisor Corpus Christi, TX
01/11 – 04/11 H&S Fabricators Valero Plant – General Foreman Corpus Christi, TX
04/10 – 08/10 Zachary Construction Citgo West Plant- General Foreman Corpus Christi, TX
01/10 – 03/10 JV Piping Hovensa Refinery St. Croix,
General Foreman U.S. Virgin Islands
11/09 - 01/10 Bay Ltd. Berry Fabrication Yard
Superintendent Corpus Christi, TX
02/09 – 11/09 Quell Industrial Kiewitt – Superintendent Ingleside, TX
Certifications/Professional Achievements:
NCCER Piping Instructor
NCCER Supervisor
NCCER Certified Plus Pipefitter
NCCER Certified Plus Boilermaker
TWIC card (expires July 28, 2023)
30 hour OSHA Certification
Attended Safety Leadership Programs
Attended Maintenance and Safety Seminars
2002-2003 Achieved VPP Award at Flint Hills Resources (Low Sulfur Gasoline Project-J. E.) over 1 million safe man hours
2004-2005 Achieved VPP Award at Flint Hills Resources (Low Sulfur Diesel Project-J. E.) over 1 million safe man hours
1998- 1999 Coordinator of S.A.P. system at H.B. Zachry for Citgo Refinery
1997-1998 Zero Accident Team at Bechtel-Becon
1997-1998 S.T.E.P. (Safety Task Employer Process)
Observation Team at Bechtel Becon
Over 35 years of Pipefitting/Fabrication/Supervision experience