Alaa Alattabi

Email: adzvjn@r.postjobfree.com, Cell: 913-***-****

Authorization to work in USA: Green Card holder

Education and Qualifications

BSc University of Technology (Baghdad) 1998 - 2001

Electromechanical engineering - Subjects: electrical engineering, power generation, power transmission, power distribution, and electronic power

Technology Institute 1995 - 1997

Subjects: power generation, power transmission, power distribution and electrical wiring.

Work Experience

*low voltage tech Jan 2019 to present KS & MO USA

Installation and commissioning of internet, video and voice

*PROJECT Estimation Engineer Nov 2018 to Nov 2019 IGCC Ramallah, Basra

Engaged as Lead Estimation Engineer/Scope of Work Engineer for preparing & reviewing Method Statements, Work Specific Quality Control Plans, as per specifications of contract document, analyze BOQ of tenders and contact suppliers with responsibility, Instrument/electrical works for site survey and overseeing the Oil & Gas Field Projects with local engineers, Power Plant 6.6kV overhead power lines, and underground lines, Switch gear and Instrument devices’ installations on Tanks. Duties included coordinating with the engineers, BP Client, and BGC (end user) management to achieve laborer hours and budget of Gas & Oil Field Projects. Load study. My estimations were built according to NECA, BS, IEEE, NEC and IEC Standards

*Commissioning Electrical Manager Jun 2017 to April 2018 Dar Al kenos, Baghdad

Rehabilitate underground 11 KV of Siemens distribution network at Jamila’s districts, review drawing, test insulation of MV cables, test distribution transformers, and replace the pillars & electrical meters. Improve existing networks by adding new feeders and transformers. Weekly meeting with the staff of Ministry of Electricity. Increase capacity of load after removing illegal excesses on the electrical network. Provide input to other engineers’ reports, process technical info, quality, time schedule, and budget.

*Sr. Commissioning Engineer Sep 2014 to May 2016 UMI United Marine International Iraq

Install 33 KV Transmission lines Install and commissioning ABB 2 MVA 33/0.416 KV Kiosk with switch gear. Install and programming ABB Soft-Starters up to 3000 Ampere. Install and starting up ETec Floating Pumps up to 480 H.P. Run power cables into revere by using floating cable’s trays. Install a concrete anchor on the banks of the river to fix the floating pumps. Manager with responsibility for managing and overseeing QA/QC for the Iraq Ministry of water source following the completion of construction projects. Introduce training for operation ABB soft-starters as well as ETec Floating Pumps to the staff Ministry of water source.

*Sr. Electrical Engineer Jun 2016 to May 2017 Nour al-Mishkat Iraq

Fabricate, assemble and install alternator gathering water pump to the Diesel Engines of Cummins • Design Reviews and preparation and revision of Project Management Plans • Manage the administration, monitoring and budgetary control of the projects • Ensure that all quality, safety and technical matters pertaining to the projects are addressed promptly in accordance with the specifications, standards and procedures • Coordinate and chair meetings with Ministry of water source senior management and engineers to ensure Iraq Ministry of water source participation and ownership • Completed technical evaluations • Attended Factory Acceptance Tests (FATs) and coordinated training for local engineers. • Compare with previous designs, advise on appropriate reference or initiate new design. • Provide input to other engineers’ reports, process technical info, quality, time schedule, and budget. • Give technical support to our local engineers, supervise and support their projects by updating information.

*Sr. Electrical Engineer Apr 2008 to Aug 2014 U. S. Army Corps of Engineer Iraq

Install Two Gas turbine GE Frame’9, 2 x 125 MW at Qudas Power Plant. Maintain twin Gas turbine GE LM6000, 10 x 40 MW at Mussaib Power Plant. C.V Page 4. Install two Mobile substation 2 x 10 MVA with lines at BIAP. Install diesel generators Caterpillar up to 1500 KVA at Iraqi Court Houses. Install Fuel toping at Mussaib Power Plant. • Procurement Materials for projects: 1) GE Spare Parts at Mussaib Power Plant. 2) GE Spare Parts at Mullah Abdullah Power Plant.

3) Firefighting Spare Parts at Mussaib Power Plant. 4) Mobile Substations up to 16 MVA.

Commissioning Engineer for reliability test, supervising and overseeing inspection of Operation e 2x40 MW GE LM6000 at Al Qudas Power Plant.

*Project Engineer Dec 2007 to Apr. 2008 CH2MHILL Taji military base Baghdad

Review and approve contractors’ electrical materials of Iraqi Army Manufacture for industrial machines for assembly Tank. • Load Study for industry buildings. • Install LV switch gear, Transformers and C.Bs. • Erect industry machines

*Electrical Test Engineer Oct. 2006 to Nov. 2007 Rams Al Hadara Baghdad

Electrical T e s t Engineer/Project Engineer, responsible for the Test, Commissioning, Reliability test, supervising and overseeing inspection of projects for power plant for installing 8 x 25 MW GE Frame’5 • Insulation test for ABB Power Transformer, Alternator, Motors and Cables • Check parameters of equipment of switch yard such as CTs, CVTs, C.Bs and disconnected switches. • Continuity test for wiring of control. • Check the sequence of MV switch- Gear Siemens.

*Estimation Engineer May. 2004 to Dec. 2006 IBTI Co Baghdad

Quantity Survey, Man Hours Estimation, Load Study and Assess Electrical Project such as Power Plant, Sub Station, HV Transmission Lines, MV Switch gears and LV of Buildings. Takeoff and breakdown Bid for construct substations 132/33 KV. Takeoff and breakdown Bid for construct substations 33/11 KV. Takeoff and breakdown Bid for run Overhead transmission lines 400, 132 and 33 KV. Takeoff and breakdown Bid for laying underground power cables XPLE 132, 33 and 11 KV. Takeoff and breakdown Bid for construct power banks of diesel generators 11 and 0.416 K.

*Application Engineer Sept. 2003 to Apr. 2004 Caterpillar Iraq

Install and Starting-up, Commissioning and Restarting-up Diesel Generators up to 5 MW. • Install ATSs, DBs and C.Bs • Install and commissioning Synchronize panels • Run Power Cables. • Install and commissioning power transformers.

TRAINING AND CERTIFICATION

• 2003 Starting-up Diesel Generators ( Caterpillar) Baghdad, Iraq • 2005 • 2007 BOQ/ Cost analyze ( local Contractor) Test Switch-Yard & Switch-Gear ( local Contractor) Baghdad, Iraq • 2008-2014 First Aid and Site Safety courses every a year (USACE) Baghdad, Iraq • 2010-2012 Programs Management (USACE) Baghdad, Iraq • 2010 Transformers Testing (Electroputere S.A) Manufacture S.A manufacture) Craiova, Romania • 2014 Soft- Starters Commissioning Floating Pumps ( ETec) ETEC SA, Colombia • 2016 Assembly electrical parts diesel generator (Cummins) Baghdad, Iraq • 2018 Communication networks (Viasat) Denver, Colorado • 2018 Communication Wiring ( Comcast) Denver, Colorado

References:

Edward P. Hutson Jr. / Civil Engineer, adzvjn@r.postjobfree.com 816- 529 - 2348

Keith Burden/ Installation Manager, Hickerson Installation Inc. adzvjn@r.postjobfree.com 816-***-****

William R. Maher / Sr. Construction Manager Water Business Group adzvjn@r.postjobfree.com 203- 628 -5449

Jerry Leffel / USACE Con-Rep (QA/QC Safety) adzvjn@r.postjobfree.com adzvjn@r.postjobfree.com