Post Job Free

Resume

Sign in

High School Truck Driver

Location:
Las Pinas, Philippines
Posted:
September 20, 2023

Contact this candidate

Resume:

VILLAMOR, ROMER T.

OCCUPATION : ELECTRICIAN TECH./ RIGGER TECH.

AGE : 39

BIRTHDAY : 11/10.1983

ADDRESS : ** **** ** **** ******* BULACAN, PHILIPPINES

CIVIL STATUS : MARRIED

CONTACT NUMBER: 092********/092********

DRIVER’S LICENSE : C07-15-011741 (PRO A,A1,B1,B2)

YEARS OF EXPERIENCE : 6YEARS OFW / 10 YRS LOCAL

OTHER SKILLS : ELECTRICAL TECH./ LINEMAN /RIGGER TECH.

SUMMARY OF QUALIFICATIONS:

HIGH SCHOOL : BISLIG CITY NATIONAL HIGH SCHOOL

YEAR GRADUATED : 1994/1995

VOCATIONAL SCHOOL : NAME OF VOCATIONAL SCHOOL

VOCATIONAL COURSE : VOCATIONAL COURSE

YEAR GRADUATED : YEAR

COLLEGE : UNIVERSITY OF SOUTHEASTERN PHILLPPINES

DEGREE : B.S.E.E.

YEAR GRADUATED : 2014/2016 (LEVEL)

EMPLOYER : ERICSSON PHILLIPPINES

PROJECT/JOBSITE : SMART TELECOM

POSITION : TEAM LEAD, RIGGER DRIVER

PERIOD : 08 2019/ 02 2022

JOB RESPONSIBILITIES:

INSTALLATION OF ANTHENNA, RRU,RBS, RECTIFIER( ELTEK, ERICSSON)

CABLE LAYING OF POWER CABLE FROM TOP OF TOWER TO RBS SIDE

TROUBLESHOT MINOR AND MAJOR ALARM IN SITE SMART TOWER

CONFIGERATION, COMMISIONING INTEGRATION UPON REQUEST OF SMART TELECOM CLIENT

HOISTING ALL MATERIALS NEEDED @ SITE USING EQUIPMENT,FROM GROUN TO TOP OF TOWER

TERMANITION OF ELECTRICAL POWER CABLE ( AC / DC )

CONNECTION OF ALL RADIO BAND SUCH AS 2G,3G,4G AND 5G TECHNOLOGY

TOOLS AND MATERIALS USED:

EMPLOYER : PROTEK TELECOM

PROJECT/JOBSITE : MARILAO BULACAN

POSITION : DRIVER TECH.

PERIOD : 06 2015 -08 2019

JOB RESPONSIBILITIES:

INSTALLATION OF INTERNET USER OF PLDT FIBER OPTIC CABLE

CABLE LAYING OF FIBER OPTIC CABLE FROM LCP TO SUBSCRIBER

INTEGRATION OF MODEM OF CLIENT WITH THE SUPPORT OF PLDT TECH.

DOCUMENTATION OFF ALL MATERIALS TO BE NEEDED WITH JOB ORDER CAME FROM PLDT OFFICE

TOOLS AND MATERIALS USED:

:

EMPLOYER : POWER PAN KINGDOM COMPANY

PROJECT/JOBSITE : SAUDI

POSITION : LINE MAN TECH.

PERIOD : 10 2011 TO 2015

JOB RESPONSIBILITIES:

INSTALLATION OF TRANSFORMER,PANEL BOARD, OF DISTRIBUTION LINE

CABLE LAYING OF OVER HEAD WIRE AND UNDER GROUND CABLE MEDIUM VOLTAGE

TERMINATION OF PANEL POWER TAPPING OF OVER HEAD CABLE USING PROPER EQIUPMENT

INSTALLATION OF METER BASE AND TAPING AT SERVICE DROP.

CHECKING VOLTAGE AND TROUBLESHOOT USING VARIUS EQIUPMENT

JOINTER OF MEDIUM VOLTAGE CABLE ( UNDER GROUND, OVER HEAD CABLE)

TOOLS AND MATERIALS USED:

EMPLOYER : MUTLAQ INDUSTRIAL GROUP

PROJECT/JOBSITE : SAUDI REYADH

POSITION : BUILDING WIRING ELECTRICAL

PERIOD : 2008 TO 2011

JOB RESPONSIBILITIES:

BUILDING WIRENG INSTALLATION OF MEDIUM AND HIGH RISE BUILDING

CABLE LAYING

CABLE TRACING

CABLE TESTING USING EQUIPMENT

TERMANITION MAIN PANEL AND SUB PANEL

FEXTURE OF LIGTHTING

TAGGING OF CABLE

HEAVY MACHINERIES HANDLED:

EMPLOYER :

PROJECT/JOBSITE :

POSITION :

PERIOD : MMM-YYYY to MMM-YYYY

JOB RESPONSIBILITIES:

HEAVY MACHINERIES HANDLED:

EMPLOYER :

PROJECT/JOBSITE :

POSITION :

PERIOD : MMM-YYYY to MMM-YYYY

JOB RESPONSIBILITIES:

HEAVY MACHINERIES HANDLED:

TRAININGS/SEMINARS:

TOPIC/COURSE TITLE

DATE TAKEN

TESDA MALOLOS

NC2 ELECTRICAL

08 2019 TO 2025

WHA TOWER TECH

WORK@ HIEGHT FOR CLIMBING TOWER

2020 TO 2023

NUMBER

TYPE

ISSUING AUTHORITY

Validity

EDUCATIONAL ATTAINMENT

WORK EXPERIENCES

TRAININGS & SEMINARS

LICENSES & PROFIENCY QUALIFICATIONS



Contact this candidate