Post Job Free

Resume

Sign in

Project Manager Resident Engineer

Location:
Bellmore, NY
Posted:
September 19, 2023

Contact this candidate

Resume:

MOHAMMAD HAQUE

E-MAIL: adzte5@r.postjobfree.com

CELL # 917-***-****

**** ****** *****, ********, ** 11710

OBJECTIVE: To work with reputable organization as a Professional Engineer, to achieve objective

by become successful person in life and play my positive role in the development

of the company's growth and success

EDUCATION: Master in Construction Management-New Jersey Institute of Technology

BS in Civil Engineering, NED University, Pakistan

Professional Engineering License, (PE license ) -In Process

Familiar/Working on NYSDOT project management Site Manager software design by

AASHTO, used in USA by different state and other countries in the world

Familiar and working knowledge of Primavera Project Management/P6 and Primavera

Contract Management/Expedition, Microsoft Office, AutoCAD and

Structural Design/Analysis Software

EXPERIENCE:

03/01/22_ Present Replacement of Overhead Sign Structures at 26 Locations in Nassau and

Suffolk Counties

Gedeon Engineering

EIC-Michael Leen

Assistant Resident Engineer/Assistant Project Manager

As an Assistant Project Manager to oversight all the field activities.

Main Task are to collect shop drawings, reviewed the shop drawings, to make sure the drawings are prepared as per contract requirement, and all the applicable code were followed. After the review and comments, forward all the shop drawings to concerned agencies for review and approval. All the approved shop drawings are returned to the contractor for use in the field installation. Also kept shop drawing logs and update regularly.

Review the structural stability of the sign structure and make sure that during construction structural standards were followed.

Review with inspectors that the MPT drawings were followed during road closings.

Safety is the most important task to follow, during all the construction activities. Randomly check the project safety.

Review Site Safety Plans, before submitting for approval review and comments.

Prepare all the relevant project logs and update regularly until the project is completed.

Coordinate with all the relevant agencies and provide updated status of the project.

Review and log all the subcontractor’s information, regarding use of subcontractor items and monitor payments to subcontractor.

Review and log all the project permits, make sure that the contractor provides updated permits for office records.

Reviewed and counter checked all the high strength bolts connections from the standard drawings, to make sure that the right size and strength bolts will be sued for all the connections.

Updated material logs for every location on the project and checked material quantities are correct for each location.

Check the item list for all the material that will be used. Compare the items material certificate with standard specifications. Make sure all the material followed the standard code required as per ASTM requirements.

Review CPM and weekly schedules. Notify the contractor if any changes are required.

Review contractor monthly payments. Compare the payment quantities with inspector’s reports. Check all the material requirements to be certified.

Prepare project progress meeting agenda. Take notes for minutes of meetings. Prepare and distribute minutes to all the attendees. Make changes if there are any comments.

Attend weekly safety meetings at contractor yard.

Review and comments all the RFI’s submitted by contractor. After review and comments, forward to concerned agencies for review and comments.

Review contractor weekly payroll reports. Compare the rates with Prevailing wages and make sure that rates are paid by the standard.

Prepare project quantities estimates to make sure that all the quantities that will be used are included in the project quantity estimates. Prepare all the overrun quantities estimate, to make sure that all the overrun items will be paid by using current underrun items and not to overrun project cost.

06/2019_03/01/22 Concrete Pavement Repairs on NY Rte 106_Town of Hemsptead

Infra Tech Engineering

EIC- Simon Kourounis

Assistant Resident Engineer/Assist Project Manager

As Assistant Resident Engineer/Assistant Project Manager, prepare project schedule activities based on project drawings and specification.

Review construction plans and material requirements and estimate all the major item quantities that will be required during construction.

Review project safety plans, review safety requirement during construction.

Review Weekly/Bi-weekly project schedules.

Prepare project quantity estimates and list of material required.

Review sub-contractor work activities and coordinate sub-contractor requirement as per contract.

Review contractor daily and weekly safety meetings and manage project safety record.

Review sub-contractor ‘s agreements, and prepare project review and coordination log.

As a Assistant Resident Engineer/Assistant Project Manager, responsible to familiar with the Contract Specification and Drawings as well as Standard Specs and enforce during as defined and make sure during construction work performed as required of standard spec and project drawings/specs, including all the relevant codes applicable for the project.

Ensure quality control throughout the project duration and coordinate disposition of all the non-conformances to the contract requirement.

Coordinate and attend project progress meetings, prepare meeting agenda and draft meeting minutes and distribute to the attendees.

Review RFI provided by contractor, verified with contract drawings/specification, submit to designer/NYSDOT for approval.

Reviewed Inspector’s Report verified contract items and calculation and also verified that the repairs are as per approved shop drawings.

Generate Contractor Payment also verified payment quantities, certified all the material requirement.

Created Change Order for overrun/ under-run project items as well as perform cost analysis/cost breakdown for the items as required.

I am involved in all the project related activities and coordinate with all the related agencies and personnel of NYSDOT.

Review/Manage project correspondence and keep track of all documents.

Use MURK(NYSDOT) Manual for record keeping and quantities estimates.

Presently work on close out the project, which include check all the under/overrun items, print out clean out change order list of items, create cleanout change order, put all the project correspondence on the state provided external P drive and make boxes and tag them, to drop off at NYSDOT Region Office. Also help EIC to close the project.

4/2017_6/2019 D&B Engineers

SAND349F2_Resurfacing Roadway/ Installation of Ped Ramps

SAND350FM_Resurfacing of Roadway/Installation of Ped Ramps

City Wide Project Locations

EIC_ Zong Jiang

Resident Engineer/Project Manager

Supervise both projects, SAND349F2 is FHWA Funded and SAND350FM FEMA Funded

As Assistant Resident Engineer/Assistant Project Manager, prepare project schedule activities based on project drawings and specification.

Layout construction plans and material requirements and estimate all the major item quantities will be required during construction.

Prepare and layout project safety plans, review safety requirement during construction.

Prepare Weekly/Bi-weekly project schedules.

Prepare project quantity estimates and list of material required.

Review sub-contractor work activities and coordinate sub-contractor requirement as per contract.

In coordinated with NYCDDC FHWA compliance group to make sure all requirement required as FHWA/FEMA/NYSDOT/NYCDOT/NYCDDC are considered during the construction and all the compliance are enforced

SAND349F2 is FHWA funded, one of the compliance/requirements is monitored on EBO, and make sure that contractor is entering all the required information in the system as required by FHWA/NYCDDC

SAND350FM during the procurement of project keep in touch with NYCDOT/Hagerty Consultant to make sure that FEMA related requirement are considered, also filled the FSRT Tracking sheets required for FEMA funded projects.

Attending all the meetings related to both the project at NYCDDC Office and updated all the pertinent agencies with the both the project progress, pace of the construction, provide cost breakdown of projects, funds used/funds remain.

Before the start of construction process of both project with representative of NYCDOT, field survey all the project location and updated the list of location will be constructed and also provide update of the locations are part of both project but were constructed by other project and need to delete from these projects.

During the construction phase, assigned inspection teams on multiple project activities and monitor them on a Daily basis.

Review/check payment quantities, prepare spreadsheets to keep track of all the project items.

Conduct monthly progress meetings, prepare agendas, and prepare minutes and distribute.

Prepare and process contractor payments as per NYCDDC provided system.

Review project correspondence and provide information as required.

Generate Resident Engineer Dairy and updated on daily basis.

Prepare and process change order.

Coordinated with auditor and provided information required as requested.

One of the FHWA requirements is to get an approved independent testing laboratory for soil/asphalt compaction testing. I received quotations from different laboratories/finalized with EIC, coordinate/assigned locations for testing and cooperate with field staff during the process of testing, and review testing results.

Review project CPM/Monthly/Biweekly schedules and coordinate with contractor for implementation of construction schedule during construction process.

10/2015-4/2017 Hardesty and Hanover

FEMA_ Rehabilitation Project_ Belle Harbor, NY

Nature of Project_ Rehabilitation of Roadwork Installation of New Main Pipe.

Rockaway, Queens

EIC_ Norbu Sering

ASSISTANT RESIDENT ENGINEER

As a Project Engineer responsible to familiar with the Contract Specification and Drawings as well as Standard Specs and enforce during as defined and make sure during construction work performed as required

Ensure quality control throughout the project duration and coordinate disposition of all the non-conformances to the contract requirement.

Coordinate and attend project progress meetings, prepare meeting agenda and draft meeting minutes and distribute to the attendees.

Review project CPM/ monthly /biweekly schedule and keep track of the project cycle.

Review RFI provided by contractor, verified with contract drawings/specification, submit to designer/NYCDOT and NYCDDC for approval.

Reviewed Inspector’s Report verified contract items and calculation and also verified that the repairs are as per approved shop drawings.

Generate Contractor Payment also verified payment quantities, certified all the material requirement.

Created Change Order for overrun/ under-run project items as well as perform cost analysis/cost breakdown for the items as required.

I am involved in all the project related activities and coordinate with all the related agencies and personnel of NYSDOT/NYCDDC/NYCDEP.

Review/Manage project correspondence and keep track of all documents.

Familiar with NYCDOT specification/ NYCDEP Water and Sewer Specification and NYCDDC Contract Specification

5/2013-10/2015 Afridi Associates, NYC

Robert Moses Parkway Bridge, NY

Estimated Cost of Project: $ 18 Million

Nature of Project: The existing bridge required Structural Steel Repair/ New Steel

Painting/New Asphalt Overlay

EIC_ Robert Lurice

3/2012- 9/2012

Tappan Zee Bridge-Test Pile Demonstration Program

New Tappan Zee Bridge -NYC

Estimated Cost: $18 million

Nature of Work: The project was designed by NYS Department of Transportation, to

test 7 piles of different sizes to perform multiple loading test, for Design Built future.

bridge construction project

EIC_ Stan Drozenski

6/2009 -9/2012 GEB Engineers, P.C (NYC)

Gowanus Expressway Structural Steel Repairs, NYC

EIC_ Robert Rodriguez

Estimated Cost: $21 million

Nature of Work: This project involved repair of Structural Steel Member

ASSITENT RESIDENT ENGINEER

As a Project Engineer responsible to familiar with the Contract Specification and Drawings as well as Standard Specs and enforce during as defined and make sure during construction work performed as required

Ensure quality control throughout the project duration and coordinate disposition of all the non-conformances to the contract requirement.

Coordinate and attend project progress meetings, prepare meeting agenda and draft meeting minutes and distribute to the attendees.

Review project CPM/ monthly /biweekly schedule and keep track of the project cycle.

Review RFI provided by contractor, verified with contract drawings/specification, submit to designer/NYSDOT for approval.

Reviewed Inspector’s Report verified contract items and calculation and also verified that the repairs are as per approved shop drawings.

Generate Contractor Payment also verified payment quantities, certified all the material requirement.

Created Change Order for overrun/ under-run project items as well as perform cost analysis/cost breakdown for the items as required.

I am involved in all the project related activities and coordinate with all the related agencies and personnel of NYSDOT.

Review/Manage project correspondence and keep track of all documents.

Use MURK(NYSDOT) Manual for record keeping and quantities estimates. Pre

9/2012- 5/2013. GEB Engineers P.C, NYC

Installation of Pedestrian Ramps, Borough of Queens, NYC

NYCDDC, HWP2012Q

Estimated Cost: $ 5 Million

Nature of Work: In NYC built handicap people sidewalk concrete ramps

Resident Engineer

As Resident Engineer, managing the team consist of Office Engineer/Field Inspector, assigned day to day task and monitor performance and rectify/point out any deficiencies and guide them to handle.

Review Inspector Daily Reports, check payment quantities verified with specs and contract/shop drawings.

Make project site visits, verify construction activities, check MPT, direct contractor if found any deficiencies.

Review RFI's, and forward to NYCDDC for review and direction.

Review submittals to make sure that submitted as per specs requirement forward to NYC Department of Design and Construction for approval.

Conduct project progress meetings, prepare minutes and distribute minutes to participants.

Maintain Resident Engineer's daily dairy.

I have excellent communication and written skills that help to delegate work to my team members and give them clarity about the work expected from them.

I am highly proficient in understanding and interpreting the legal terms and conditions mentioned in contracts of the project.

Capable of using mathematical and statistical tools to provide the guidelines for the follow up of the project.

Send monthly/weekly reports to NYCDDC

9/2008-6/2009 Liro Group, NYC

Rehabilitation of 181st Street Retaining Wall/Installation of

Water-Main on Riverside Drive -Manhattan

Estimated Cost: Amount $ 15 Million

Nature of Work: Rehabilitation of the existing wall, by reinforcing steel rebars

1/2002-12/2003 KC Engineering, PC, NYC

NYCDDC/NYCDOT Installation of Pedestrian Ramps-Bronx

Estimated Cost:$ 14 Million

Nature of Work: Installation handicap people concrete ramp\

Office Engineer

Perform responsibilities of Office Engineer and assist Resident Engineer in different office related tasks.

The nature of the project was reinforcing the existing retaining wall, by installing rebar by drilling into the retaining wall with fill with high strength grout.

The project also involved replacing existing 12” existing water main with new 12” ductile iron pipes and installing gate valves, including replacing existing fire hydrant and provide new taping connection to the existing buildings.

Manage all the office work, such as reviewing inspector's daily reports, all the correspondence related to project.

Keep track of all the payment quantities and make assure that payment quantities don’t exceed the bid quantities.

Participate in Progress/Contract related meetings, take notes and generate minutes and distribute them to the concerned agencies.

Coordinate with contractor on a daily basis regarding schedules and other required submittals.

Forward and follow up all documents with NYCDDC and keep track of all the submittals and approvals.

Create and record all the change orders.

Review Contract/Shop drawings and inform concert authorities regarding any discrepancies.

Use MURK manual for record keeping and quantities estimate.

2/2003-9/2008 Haider Engineering, P.C, NYC

Throghs Neck Bridge- Repair of Existing Structural Steel,

Estimated Cost: $ 38 Million

Nature of work: The project work includes the replacement of existing catwalk under

the bridge, repair Structural Steel Members and Painting of the Bridge

Office Engineer

Responsible for all office related matters and assist Resident Engineer in different office tasks.

Review Inspector's Daily Work Reports and prepare report log and keep track.

Review contractor daily MPT schedule and forward it to MTA for records.

Communicate with MTA on different project related matters.

Prepare monthly and weekly reports and submit them to MTA for review.

Review project related correspondence and keep track.

Review contract and shop drawings and forward comments if any to concerned persons.

Attend Monthly/Progress meetings, take notes prepare minutes and distribute.

Coordinate with Designer on unforeseen field conditions.

NYSDOT-Replacement of Existing Bridges

Hillside/ Jamaica Avenue, NYC

Estimated Cost: $ 40 Million

Nature of Work: Replacement of existing Bridges at above location

Senior Inspector

Review structural steel shop drawings and involved in installation of all the steel on both the bridges.

Prepare spreadsheet of all the structural steel quantities and compare with shop drawings quantities before making any payments.

Involved in Bored-in piles installation operation and reviewed loading drawings and installation process.

Reviews shop drawings of rebars and checks in the field of all the rebars.

Check all the form work before concrete installation.

Involved in all the backfilling operations, review compaction reports.

Check Air/Slump and involved in all the concrete pouring operation.

Review MPT daily, write MPT reports and coordinate with concerned agencies.

7/1996-1/2002 Storch Engineers, NYC

NYSDOT-Inspection, Design and Construction Supervision

Several Arterial Bridges over LIE and GCP

Design Engineer

Attend project related meetings with NYSDOT/NYCDOT and Community Boards and used meeting information to prepare contract repair drawings.

Review field inspection reports and used required information during the design of contract drawings.

Prepared all the repairs drawings as per contract requirement and forwarded them to the region.

Coordinate with Region 11 and keep track of all the correspondence.

Keep in touch with the region during the whole design phase and make sure that all the information is incorporated.

Prepare all the special specs and get approved from the region.

Prepare all the quantities estimate for bidding.

2/1988-6/1996 Weidlinger Associates, NYC

NYS Thruway Authority-Tappen Zee Bridge

Assistant Team Leader

Review shop drawings of structural steel installation and involved in installation of different structural steel repairs.

Prepare inspection reports and structural steel quantities.

Supervise installation of cantilever beam and repair of bridge joints.

NYCDOT-Arterial Bridge in Brooklyn/

Van Wyck Expressway/Gowannus Expressway

(Biennial Inspection)

Assistant Team Leader

Involved in preparation of inspection forms of above bridges.

Involved in Biennial inspection of the bridges.

Involved in preparation of inspection report.

Check load rating of the different bridge items.

Compile all the inspection data and field notes and photographs.

Create and manage different logs and keep track of all the information.

NYCDOT-Williamsburg Bridge (Bieannial Inspection)

Assistant Team Leader

Performed field inspection of suspended/side span and approaches according to NYSDOT standards of non-redundant primary, fatigue prone and fracture critical members.

Involved in preparation of inspection forms of different bridge items.

Involved in all the field inspection operations.

Involved in preparation of inspection report.

Compile all the inspection data and field notes and photographs.

Check load rating of different bridge inspection items.

Analyzed the shear capacity of the primary members having considerable section loss and involved in design of different structural repairs.



Contact this candidate