RAMON VELASCO

** ***** ******** **. ********** AR.72058

Phone: 765-***-**** cell, 765-***-**** home

E-mail: adzrxh@r.postjobfree.com

OBJECTIVE:

To obtain a challenging position in Quality Assurance, Coating Inspection, Quality Control and/or Nondestructive Testing where my skills, education, and talents will be utilized and challenged with the opportunity for advancement. A hard worker willing to do what it takes to get the job done safely by all Customer's explicit testing requirements and complex needs of any given part or equipment to be inspected in accordance to all applicable procedures and reference standard codes. Thereby, assuring complete inspection integrity and most important 100% customer satisfaction and always willing to travel in/out USA, short/long term, on/off shore.

CERTIFICATIONS:

NDT Level II ET, PT, MT, RT, VT, UT - (angle beam & longitudinal wave),

LI LFET (Low Frequency Electromagnetic Testing) Level I IR, NACE CIP LI

OQ’S: NCCER, Veriforce and Midwestern Associates

Inspection for Damage

Inspect Navigable Waterway Crossings

Qqqq q 5 Vents and Seals

Backfilling

Perform Leakage Survey

Installation of Steel Pipe

Conduct Pressure Test

Abnormal Operating Conditions

Characteristics of Natural

Underground Clearances

KNT 192-1411 Inspection

Line Markers

Installation of Steel Pipe – Repair of Imperfections or Damage

Outside Gas Leakage Investigation, Pinpointing, and Grading

Locating Pipelines

Protection during Disturbance of Segment Support

Miter Joints

KNT 192-2403 Nondestructive Testing of Welds

Coating Maintenance

Corrosion Monitoring – Atmospheric, External, and Internal

Soil Resistively Testing

Pipe-to-Soil Testing

KNT 192-2402 Visual Inspection of Welds

KNT 192-2401 Welding

Prevention of Accidental Ignition

Inspect Surface Conditions of Right of Way, Perform Leak Survey

Application and Repair of External Coatings

Inspect Internal Pipe Surfaces

Prevention of Atmospheric Corrosion

SPC Special Coatings SP-2888, SCP-4888, SPC-2831, Denso, Clock Spring and Power-Crete

EMPLOYMENT HISTORY:

RINA - Calagary,Canada Supervisor: M. G. Burkholder Dec. 2022 –March-2023

QA/QC Lead Inspector – VT Performed as a 3rd party Vendor Surveillance inspector/ Observerfor Pembina.

Visual inspections, dimension control, were performed during the fabrication of 61,879m of 273.1mm” OD X.6.0mm” WT 359 Gr Cat II FBE and 10,530m of .406.4mm” OD X 10.30mm WT 359Gr Cat. II M5C .FBE and ARO .

Performed as Auditor (coating and Steel mill monitoring Formation, NDE, pressure testing, and final dimensional inspection frequency welded pipe. Inspection was performed and overseen on all fabrication process of pipe, starting with rolling welding, expanded & hydro, NDE examinations & final bench, quality & footage production, as well as, quality weld. Report elaboration, documentation and pipe tracking revision was performed. All these inspections were performed under CSA Z245.1-18 and customer specifications Edition and AWS/NACE guidelines and references. Also, responsible for verifying the accuracy of material specifications being used in production was recorded according to heat/pipe number at each stage of production. All fabrication and inspections of this project took place at the Wels pun HFW Pipe facility in Little Rock, AR.

MTB QUALITY CONSULTANTS - Baytown, TX Supervisor: M. Briles May 2007 –Date

QA Inspector – VT Performed as a 3rd party Vendor Surveillance inspector for Northern Natural Gas

On FBE and Power-Crete Coating on various pipe orders All these inspections were performed under. Performed as Pipe Coating Surveillance inspection for TransCanada Energy under codes and guidelines of/NACE and this assignment took place at Midwest Pipe Coating Inc. Schererville, IN.

ACES GLOBAL QUALITY SERVICES Houston, TX Supervisor: S.Agate March 2019 to Seprt-2020

Performed as a 3rd party Vendor Surveillance inspector for E T C .Visual inspections, dimension control, were performed during the fabrication of 24” X .535” WT Gr.X70M PSL2,FBE Steel mill monitoring Formation, NDE, pressure testing, and final dimensional inspection frequency welded pipe. Inspection was performed and overseen on all fabrication process of pipe, starting with rolling welding, expanded & hydro, NDE examinations & final bench, quality & footage production, as well as, quality weld. Report elaboration, documentation and pipe tracking revision was performed. All these inspections were performed under API-5L 46th Edition and AWS guidelines and references. Also, responsible for verifying the accuracy of material specifications being used in production was recorded according to heat/pipe number at each stage of production. All fabrication and inspections of this project took place at the Stupp pipe corp. HFW Pipe facility in Baton Rouge, LA..

MTB QUALITY CONSULTANTS - Baytown, TX Supervisor: M. Briles Mar 2019 - Apr 2019

QA Inspector – VT Performed as a 3rd party Vendor Surveillance inspector for Northern Natural Gas,TransCanada

On FBE and Power-Crete Coating on various pipe orders All these inspections were performed under. Performed Pipe Coating Surveillance inspection for Revanco Piping under codes and guidelines of/NACE and this assignment took place at Durabond Pipe Coating Steelton,PA

N.V 5 –Houston, TX Supervisor: M. Valenzuela Dec. 2017 to April-2018

Performed as 3rd party Utility/Coating inspector, Working with Enviromental Crew Assurring safety and quality of protection of natural wetlands such as dewatering structures, silt Fence, Safety fence during the construction of 11 miles of 36” O.D X .74” X70 FBE 16 mil API 5L NEXUS gas transmission pipeline “ spread 4“ Southern east Michigan.

N.V 5 –Houston, TX Supervisor: M. Valenzuela June. 2017 to Nov. 2017

Provided as a 3rd Party Quality Assurance surveillance inspector.provided for a 26” Ultra horizontal filter separator replacement, pressure vessel including piping As well as an expediter. Inspection visits consisted on Welding,Coating and dimension inspection and verification according to API-1104, Specification Document review such as Engineering drawings, up to latest Revision,Material Tests Reports (MTR’s) NDE,review asing well as witness the entire process Film Interpretation and personnel certification review such as, AWS/CWI, NACE ASNT-TC-1A, and Operator Qualifications OQ’s,according to all guidelines from Spectra/ Enbridge Natural Gas, and welder’s Compliance Reports. During the Fabrication on welding shop as well as and on-site replacement at LS Power Meter station modification installation in Wallingford,CT

QIC/ RINA Inspection –Tomball, TX Supervisor: R.Cainn Feb. 2017 to March .2017

Provided as a third party surveillance inspector for FMC/Shell overseeing and witnessing NDE(VT UT,MTand PT pre and post Loading testing inspection during the fabrication of various Electrical Distribution Modules and components such as Lower and top sections and locking pins all documentation such as personnel certificates as well as Material test reports,welding procedures, ITP review and certificate of compliance all these modules were fabricated Ginzink in Holland,MI. accordance to NACE AWS,ASNT-TC -1A,

Delta Energy Services –Houston, TX Supervisor: P. Krautner May. 2016 to Oct.2016

Provided as a third party surveillance inspector. As well as an expediter. Inspection visits consisted on dimension inspection and verification according to specification and last revision of engineering drawings, following Inspection Test Plan (ITP), Final visual inspection on Quality welds as well as coating applied, electrical testing, Document review such as MTR; s engineering drawings, personnel certification review as need it: AWS, ASNT, NACE Testing equipment certificates as well as calibration up to date, tags and nameplates with appropriate serial numbers and equipment specification and use limitations witness issuing equipment release Factory Acceptance testing (FAT) and packing prior to shipping .Also Performed as 3rd party inspector,QA on several cable drums 157,226 ft of various types of cable such as Instrumrntation,, Communication 8C FO 62.5/125UM - BLW BEF101217 Belden 8 OM1 INDOOR/OUTDOOR RISER LOOSE TUBE CABLE Each drum contained various footage from 4,630’ to 5,562’, a total of 57,226’. Fiber Optic, 24C FO 9/125UM - B9W892 Belden Fiber Express Double Jacket-Steel Corrugated Armor Cable, 24-Fiber, OS2 OFCR,1-7 fibers type (MM62.5/125-OM1) Group 10 different colors

& Communication Cable Representing Rexel IPG c/o Gexpro at Beldem in Richmond, IN .for the Paco Coal Fired Power Plant Project

QIC/ RINA Inspection –Tomball, TX Supervisor: T. Acker March. 2016 to Jul.2016

Provided as a third party surveillance inspector. And expediter Inspection visits consisted on witness Hydro- testing, PMI, Dimension verification and Document review such as Inspection Test Plan, Engineering drawings, Material tests reports, welding and NDE, reports, Marking and shipping according to specifications as well as customer agreements on purchase order of Liquid drain traps all these inspections took place at vendors facility at Armstrong International.

Microalloying INC.Houston, TX. D.LaRose May-2015 to July 2015

QA/QC 3rd party NDE Inspector – UT Performed as a 3rd party Vendor Surveillance inspector for EPCO Visual inspections, dimension control, were performed during the fabrication of 381,500 ft of 12” OD X.250” WT Gr.X65M PSL2 FBE and 7,000 ft .8” OD X 375” WT X65M GR. PLS2 ARO Performed as night shift Lead Auditor (coating and Steel mill monitoring Formation, NDE, pressure testing, and final dimensional inspection frequency welded pipe. Inspection was performed and overseen on all fabrication process of pipe, starting with rolling welding, expanded & hydro, NDE examinations & final bench, quality & footage production, as well as, quality weld. Report elaboration, documentation and pipe tracking revision was performed. All these inspections were performed under API-5L 45th Edition and AWS guidelines and references. Also, responsible for verifying the accuracy of material specifications being used in production was recorded according to heat/pipe number at each stage of production. All fabrication and inspections of this project took place at the Wels pun HFW Pipe facility in Little Rock, AR.

WOYTT Industries - Houston, T Supervisor: D. Woytt Mar.2015 – May 2015

QA/QC Lead Inspector – VT Performed as a 3rd party Vendor Surveillance inspector for TransCanada Visual inspections, dimension control, were performed during the fabrication of 133,500 ft of 20” OD X.250” WT Gr.X65M PSL2 FBE and 2,000 ft .20” OD X 375” WT X65M GR. PLS2 ARO Performed as night shift Lead Auditor (coating and Steel mill monitoring Formation, NDE, pressure testing, and final dimensional inspection frequency welded pipe. Inspection was performed and overseen on all fabrication process of pipe, starting with rolling welding, expanded & hydro, NDE examinations & final bench, quality & footage production, as well as, quality weld. Report elaboration, documentation and pipe tracking revision was performed. All these inspections were performed under API-5L 45th Edition and AWS guidelines and references. Also, responsible for verifying the accuracy of material specifications being used in production was recorded according to heat/pipe number at each stage of production. All fabrication and inspections of this project took place at the Wels pun HFW Pipe facility in Little Rock, AR.

CTSI/NDE Global -, Houston TX Supervisor: J. Battles Jul. 2014 to Aug.2014

QA Inspector – VT Performed as a 3rd party Vendor inspector assurance for Chevron on new fabrication of Sub -sea micro-components, inspection duties performed consisted of dimension verification, Document review, and NDE witness performance (VT, PT) in accordance with ABS, ASNT, ASTM guidelines inspection took place at Apollo Precision Machining Inc. South Bend, IN.

GLENTECH INTERNATIONAL -, Houston, TX Sup. D: Little March – 2014-Apr-2014

QA/QC Lead Inspector VT Performed as a 3rd party Vendor Surveillance inspector for Net Mexico Gas visual inspections, dimension control, monitored lab test such as Moisture Permeation, Cathodic Disbandment, Coating Test, Cross Section Porosity, Interface Porosity, Interface contamination, Bend test, revision and calibration monitoring over all equipment such as Acid Wash, Coater, Blaster, etc. on pipe 42” X ..650 wt X70 grade visual and final bench inspection was performed during the FBE coating All surveillance was performed under API-5L, AWS and NACE, SSPC guidelines and references. All fabrication and inspections of this project took place at Welspun Coating facility. Little Rock, AR

BLACKHAWK ENGINEERING Casey, IL. Supervisor: J. Self Oct-2012 to March-2014

QA -Inspector- Supervising Rehabilitation Projects and New construction, corrosion monitoring on various Pipelines transporting different oil products locations for Marathon Oil Pipeline Through the states of IN, KY and IL monitoring Field Testing for pipeline integrity Microbiologically Influenced Corrosion Bacteria NDT personnel, coating and welding inspection. Mitigation of corrosion of pipelines Direct Examinations and revision as well as Sleeve welding and coating Repairs. Performing l as safety monitor from for Construction and NDE personnel. Researched and acquired the test equipment necessary to complete the project. All examinations were performed according to NCEER, NACE, AWS & D.O.T. Codes and procedures.

PETERSEN ENGINIEERING – Indianapolis, IN. Supervisor: A. Stainer March-2012 to Sept- 2012

QA -Inspector- Supervising Rehabilitation Projects as well as corrosion monitoring on various Pipelines transporting different oil products locations for Marathon Oil Pipeline Through the states of IN, KY and IL monitoring Field Testing for pipeline integrity Microbiologically Influenced Corrosion Bacteria NDT personnel, coating and welding inspection.

Mitigation of corrosion of pipelines and components such as Valves and pumps flanges etc…Direct Examinations and revision on integrity, such as Sleeve welding and coating Repairs, New construction inspection of component and equipment replacement including Quality assurance and witnessing hydro testing, torc bolting, on pipeline as well as pump and compressor stations

Probating daily safety meetings as well as safety monitor for Construction and NDE personnel. Researched and acquired the test equipment necessary to complete the project. All examinations were performed according to

API-1104, API/ANSI -610 NCEER, NACE, AWS & D.O.T. Codes and procedures.

DSME / Poowoon Engineering Ltd- S. Korea Supervisor Y. Ryu March 2012 May-.2012

QA Inspector – VT Performed as a third party Vendor inspector assurance for Chevron Big Foot ETLP Project on new fabrication of Sub –sea offshore Electrical Panels, and components inspection performed consisted of working performance assurance F.A.T. and punch lists, Document review, and witness al testing in accordance with ABS, UL, ASTM as well as ISO guidelines and procedures, several inspection visits took place at Vendor’s facility Armtek, Inc., Located in Columbus, OH.

Microalloying - Houston, TX Supervisor: D. Larose Jan 2012 – March-2012

QA/QC Inspector – VT Performed as a 3rd party Vendor Surveillance inspector for . Visual inspections, dimension control, were performed during the fabrication of 12” Inspection was performed and overseen on all fabrication hydro, NDE examinations & All these inspections were performed under API-5L and AWS guidelines and references. Also, responsible for verifying the accuracy of material specifications being used in production was recorded according to heat/pipe number at each stage of production. All fabrication and inspections of this project took place at the CSI facility in Fontana,CA.

JRJ Energy- Stanwood, MI. Supervisor: D.Hartman Sept 2011-Dec-2011

Chief Inspector- Provided as a Quality Assurance Coating Inspector for Dominion Gas Compressor stations and

City Gates all around southern Michigan. Monitoring and assuring quality of above ground coating as monitoring accurate inspection on existing FBE coating and good handle of pipe and verification of Quality Control, reporting and results All examinations were performed according to codes and guidelines of Consumers Energy, NACE and D.O.T.

WELLSCO- Houston, TX- Supervisor: J. Louk July 2011-Sept 2011

Q/A Inspector NACE CIP 1 - Provided as a Quality Assurance Coating Inspector for Dominion Gas Transmission During a new 8-mile Construction 12” size pipeline in Weston, WV. Monitoring and assuring quality coating SSPC SP-2888, SSPC SP-10 as well as monitoring accurate holiday inspection on existing FBE coating and good handle of pipe and verification of Quality Control, reporting and results, all examinations were performed according to codes and guidelines of Dominion Procedures API-1104, NACE-SPC D.O.T.

DTS - Blairsville, PA Supervisor: R. Barnes Mar. 2011 – To May-2011

QC Inspector – Performed NDE (UT, PT, MT & VT) Provided inspector services for Allegheny Energy on high energy piping and other various components, such as valves, DA storage tanks following the coating guidelines of ASME B31.1, Section VIII and AWS D.11 during two outages at Fort Martin and Harrison plants within the state of West Virginia.

SMARTPIPE - Calgary, Canada Supervisor: M. Hill Jul 2010 - Oct 2010

Level II NDE Technician – Performing Corrosion inspection on pipeline in accordance with NACE guidelines and specifications for Williams Gas transmission

GL GROUP - Houston, TX Supervisor: K. Brodd Nov 2009 - Jul 2010

QA/QC Lead Inspector – VT Performed as a 3rd party Vendor Surveillance inspector for El Paso. Visual inspections, dimension control, were performed during the fabrication of 42” Spiral welded pipe. Inspection was performed and overseen on all fabrication process of pipe, starting with rolling welding, expanded & hydro, NDE examinations & final bench, quality & footage production, as well as, quality weld. Report elaboration, documentation and drawing revision were performed. All these inspections were performed under API-5L and AWS guidelines and references. Also, responsible for verifying the accuracy of material specifications being used in production was recorded according to heat/pipe number at each stage of production. All fabrication and inspections of this project took place at the Welspun Pipe facility in Little Rock, AR.

KEMA SERVICES - Schenectady, NY Supervisor: A. Deburn Oct 2009 - Nov 2009

QC Inspector – Performed NDE (UT, PT, MT & VT) inspection on various components on turbine and generator components such as HP and IP rotors, diaphragms bearings, valves, etc. Assisted and performed borosonic inspection during various outages at power facilities at different locations.

JT ENTERPRISES - Baytown, TX Supervisor: B.Kaminski Aug 2009 - Sep 2009

QA/QC Lead Inspector VT Performed as a 3rd party Vendor Surveillance inspector for Conoco Phillips visual inspections, dimension control, monitored lab test such as Moisture Permeation, Cathodic Disbondment, Coating Test, Cross Section Porosity, Interface Porosity, Interface contamination, Bend test, revision and calibration monitoring over all equipment such as Acid Wash, Coater, Blaster, etc.10 X .365 and 10” pipe .250 were performed during the FBE coated ”pipe as well as PowerCrete coating All surveillance was performed under API-5L, AWS and NACE, SSPC guidelines and references. All fabrication and inspections of this project took place at Midwest Pipe Coating Inc. Schererville, IN.

MTB - Baytown, TX Supervisor: M. Briles Feb 2009 - Aug 2009

QA/QC Inspector – VT Performed as a 3rd party Vendor Surveillance inspector for Northern Natural Gas Co. Visual inspections, dimension control, were performed during the fabrication of numerous 30” Such as & 36” x 0.357”, 0.375”, 0.425”, 80 ft double jointed inspection was performed and overseen on all fabrication process of pipe, starting with rolling welding, expanded and hydro, NDE examinations and final bench, paint, coating and loading, quality and footage production as well as quality weld: report elaboration, documentation and drawing revision were performed. All these inspections were performed under ASME, API-5L, AWS and NACE, SSPC guidelines and references. All fabrication and inspections of this project took place at American Pipe, Birmingham, AL. Performed Pipe Coating Surveillance inspection for Revanco Piping under codes and guidelines of SSPC-SP-10/NACE and this assignment took place at Midwest Pipe Coating Inc. Schererville, IN.

ABINGTON GROUP Portsmouth,NH. Sup. B. Goulet Jun.2008 to Feb.2009

QC Inspector/Purchasing asst. Completed business recaps with direction from the buyer. Completed advertising prep sheets, obtained samples, attended advertising turn-ins and proofing. Ensured timely delivery of materials and equipment vital for start up and communicated issues to construction lead team.

Analyzed performance and made recommendations to maximize future performance. Assisted in preparation for pre-market analysis. Identified and shopped competition. Communicated issues to 3rd party vendor’s surveillance using the appropriate communication channels. Interacted effectively with vendors and internal colleagues to achieve project’s materials needs met. Aided all technical departments with all procurement needs, logistics, contractor services etc

QA/QC Inspector – VT Performed as inspector. Visual inspections, Quality control on delivered materials

Such as heat numbers, welding supplies, coating batches, welding was performed during the fabrication of numerous sizes from 2” to 30” Paint coating and Loading as well as sandblast profiles, quality and footage production as well as quality weld, dimension, coating report elaboration (ITS) Inspection test plan packages, NCR reports documentation, tracing materials verification and drawing revision were performed. All this inspection was performed under D.O.T. ASME, AWS D1.1 API-1104, and 610 NACE, SSPC and civil codes Guidelines and references. All fabrication and inspections of this project took place at Fabrication and Paint shops at ABINGTON GROUP Portsmouth NH. And Brookfield, Milford, CT. And Dover NY. On site, 3 compressions natural gas transmission station for Iroquois Gas as client

PETERSEN ENGINIEERING - IN & OH Supervisor: T. Kolb Aug 2007 - Jan 2008

QA/QC and Utility OQ Inspector- Supervising excavation for a live gas line (Transmission line) different locations for Vectren Energy, monitoring Field Testing for Microbiologically Influenced Corrosion Bacteria Casing Removal, ECDA and ICDA, Critical Angle and Pipeline Inclination Angle, NDT personnel, coating inspection, as well as laboratory testing for soil samples. Mitigation of corrosion of pipelines within D regulated ROW's. Working knowledge of 49CFR192 and 195 Data Collection for Integrity Management Direct Examinations revisions. Probating daily safety meetings to Excavation crew and NDE personnel. Researched and acquired the test equipment necessary to complete the project. All examinations were performed according to API-1104, 610 NACE, SSPC, AWS & D.O.T. Codes and procedures.

MTB - Baytown, TX Supervisor: S. Camargo Apr 2007 - Jul 2007

QA/QC Inspector – VT Performed as a 3rd party Vendor Surveillance inspector for Northern Natural Gas Co. Visual inspections, Finger Board (Monkey board), dimension control, were performed during the fabrication of numerous 30” Such as & 36” x 0.357”, 0.375” 0.425”, 80 ft double jointed inspection was performed and overseen on all fabrication process of pipe, starting with rolling Welding, Expended and Hydro, NDE examinations and final bench Paint coating and Loading, quality and footage production as well as quality weld: report elaboration, documentation and drawing revision were performed. All this inspection was performed under ASME, API-5L, AWS and NACE, SSPC guidelines and references. All fabrication and inspections of this project took place at Durabond Pipe mill at Steelton, PA.

E & I - Kapolei, HI Supervisor: R. Hill Sep 2006 - Dec 2006

Level II Technician – Performed UT inspection on OT 31 & 13 pipelines 100% A- scan examination for Corrosion Erosion all examinations were performed under D.O.T. Guidelines and acceptance criteria. Worked as a contractor for ACUREN, Inc. at North Slope BP Exploration facilities in Prudhoe Bay, AK.

TESTEX - Pittsburgh, PA Supervisor: J. Stevens Jan 2006 - Jun 2006

Level II Technician - UT, VT, and (LFET) Low Frequency Electromagnetic Testing inspections performed on storage tanks good sites. All inspections were performed in accordance to API-653. Inspections were performed at various sites around Perryton and Canadian, TX for BP America.

THE WASHINGTON GROUP - Princeton, NJ Supervisor: G. Peters Sep 2005 - Oct 2005

QC Inspector – PT, MT, & VT – Mechanical - Performed visual inspections, surveillance, and weld quality inspection performed on boiler tubes and turbine piping. All inspections were performed under codes and guidelines of AWS D1.1 during the outage at PPL, Brunner Island, PA.

MESSIER BUGATTI TRACER - Milwaukee, WI Supervisor: M. Buckley Sep 2004 - Feb 2005

Level II Technician ET, PT, VT, & MT - 90% of time performed as a Eddy Current surface technician, performing ET inspection on various types of airplane wheels as well as brake components and cases most of them made of Aluminum and Magnesium as well as titanium with pencil probe and turntable. Eddy Current equipment NORTEC 19 e II, NORTEC 24 and MK IV wheel scan. All inspections were performed according to FAA, CMM guidelines, code and regulations.

FTS - Ponca City, OK Supervisor: G. Legros Oct 2004 - Nov 2004

Level II NDT Inspector UTT, PT, & MT - Performed examinations on piping and various types of equipment during the turnaround on the #2 Crude units, as well as, the #2 Reformer at Conoco Phillips Oil Refinery in Ponca City, OK.

ECA INTERNATIONAL - Madrid, Spain Supervisor: C. Fernández Aug 2003 - Jan 2004

QA/QC Inspector – VT Performed as a third party inspector. Visual inspections, Finger Board (Monkey board), dimension control, was performed during the fabrication of numerous internal parts of columns such as trays, plates, down comers etc., as well as, cat walk, quality weld, valve calibration on trays, report elaboration, documentation and drawing revision was performed. All this inspection was performed under ASME, AWS and NACE guidelines and references. All fabrication and inspections of this project took place at Sulzer Chemtech for La Pampilla Refinery, El Callao, Peru.

JACOBS ENGINEERING – US Virgin Islands Supervisor: T. Andrewpont Oct 2000 - May 2001

Level II Technician - UTT, PT, MT, VT Maintenance including API-570 inspection performing on stream inspection all over the plant, sketching and reading P&ID’s. Inspections performed on site at Hovensa Oil Refinery, including, turnarounds at the FCC, 5 Crude, 4 Crude and various other units. All inspections were performed under API-570, 653,510 and CWI guidelines.

LONGVIEW INSPECTION – Pascagoula, MS Supervisor: P. Casper Apr 1999 - Dec 1999

Level II Technician - UT, PT, VT inspection on piping, pressure vessels and reactors in service as well as new equipment. All inspections were performed according with the codes and guidelines of API - 570, as well as reading P&ID’s and isometric field sketching during on stream inspection at Elfato Chem., Carrollton, KY. Also, provided as a LV II Technician MT & assist on UT shear wave inspections on weld quality in accordance with AWS and CWI guidelines during the construction of a Mobil Oil platform at HALTER-MARINE, Gulfport, MS.

SCANEX, INC. - Moreno Valley, CA Supervisor: T. Alier Sep 1997 - Dec 1998

Level I Technician – ET tube inspection on, heat exchangers on power plants and chillers in commercial buildings. Also, performed Level II UT, VT and IR inspections.

CONAM INSPECTION - Glendale Heights, IL Supervisor: M. Zeller Mar 1998 - Oct 1998

Level II NDT UT, PT MT, & VT - Performed CWI and API-570 work, only assisting, guiding and working inspecting pipe flanges and weld condition on the field with a Mobil Oil Chemical Engineer During the turnaround in the ALKY Unit at Joliet IL. Level II NDT UTT, PT, & MT - Performing UT Raleigh waves inspection in a numerous airplane motor rings, and provided in outages at Muscatine power plant Muscatine IA and CITGO refinery in Lemont, IL.

SGS, INC. - Houston, TX Supervisor: B. Hardy May 1997 - Jun 1997

Level II Technician - UT, PT, MT, VT performed inspections on high energy piping, turbines, vessels and boiler tubes. Services provided to APS Fossil Plant, Four Corners, NM.

INSPECTION SPECIALIST, INC. - Houston, TX Supervisor: H. Stephens Apr 1996 - Aug 1996

Level II Technician - UT performed on site at NCRA, in accordance with PIPE + and API - 570 codes and guidelines. Performed inspections as well as reviewing and redrawing all of the entire existing piping system. All inspections were performed in service on all units at NCRA, McPherson, KS.

ISMS, INC. - Houston, TX Supervisor: L. Fagan Mar 1996 - Apr 1996

Level II Technician - UT, MT, PT performed examinations on piping and various types of equipment during the turnaround on the ALKY unit at Chevron U.S.A. Oil Refinery, Salt Lake City, UT.

EDUCATION

January-2018 Enbridge Enviromental and Safety

March-2012- PPS NCCER OQ’ Pipeline Training Liquid Petroleum Natural Gas

September -2010 NACE CIP LI Inspector NACE

August-2010 Veriforce OQ’ Pipeline Training (Natural Gas

July 2007- Energy U (Midwestern Energy Assoc).: OQ’ Pipeline Train ing (Natural Gas)

September 2006 - D.O.T.: Corrosion Erosion D.O.T. UT Program

March 2006 - TesTex: Low Frequency Electromagnetic Testing (LFET)

May 2005 - Code West: API-



Contact this candidate