Post Job Free

Resume

Sign in

Truck Driver General Supervisor

Location:
Accra, Greater Accra, Ghana
Posted:
September 16, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONAL DETAILS

Telephone - 024*******

Date of Birth - 03/02/64

Nationality - Ghanaian

Marital Status - Married

Languages Spoken - English, Akwapim, Twi, Asanti, Dagbani, Hausa

PROFILE

Diligent, Confident, Self-motivated, Implementing to Specification & Effective Administrative Control System.

SKILLS

· Earthworks - Excavation, Fill, Sub-Base & Base

· Asphalting

· Surfacing

· Kerbing

· Drainage works

· Residential construction

CAREER OBJECTIVE

Remain a result oriented personal with maximum input team work to impact positively on the company’s primary aim.

INSTITUTION S YEAR QUALIFICATION

Sakasaka Experimental School - 1968 – 1974

Tamale Secondary School - 1974 – 1981 GCE ‘O’ ‘A’ Level Nyankpala Agric College - 1982 – 1985 Diploma Crop Science Name - Abraham Ofei

CONSTRUCTION EXPERIENCE

1. Ussuya Ghana Limited : 2013 to date

Position: Project Supervisor

· Organizing and managing daily activities on site.

· Liaising with consultants, sub-contractors, surveyors, quantity surveyors, supervisors and the general workforce on the project.

· Maintaining the use of specified materials to achieve perfection.

· Acts as technical advisor on site for works, and improves the experience of workers and operatives.

· Communicates with project manager, consultants and their representatives

(quantity surveyors, surveyors, engineers, and architects) for positive results, including attending regular meetings to maintain constant information of work progress.

· Planning works and efficiently organizing plant and site f acilities in order to exact specifications and agreed deadlines.

· Maintaining quality control, health and safety on site. PROJECTS UNDERTAKING

· Asphaltic overlay of Heli-pad at police headquarters – Accra

· Asphaltic overlay of University of Ghana Roads, Legon – Accra

· Earthworks, priming and asphalting of car parks – University of Ghana, Legon – Accra.

· Shai Hills Military Camp Earthworks Asphalting.

· Asphaltic overlay on couple of roads within Accra Metropolis. Ø North industrial road

Ø Abeka Junction – Abeka Lapaz road

Ø Ring road central

Ø Presidents locality – Nima

Ø Vice President locality – Kanda

Ø Kaneshie Market area

Ø Stabilizing Swampy section of roads

Ø Placing sub-Base & Base at Specified sections etc. Ø Portions of East Legon roads.

· Asphaltic overlay at Manhean Roads – Tema

· Supervised roads within Trinity College: Treated soft spots, laying Base, priming and asphalting – Accra.

· Supervised 20km patching of potholes Earthworks, placement of Asphalt and Asphaltic overlay – Kassei to Ada

· Ho Supervised clearing of trees, shrub and top soil off the shoulders of road.

· Supervised filling sub-Base, Base, primer seal, first and second seals in ninety days.

· Filling of over 20kms of Ho – Adidome and University of Health and Allied Sciences (UHAS) Roads to Minimum Height of not less than 800mm.

2. Justmoh Construction Limited - March 2012 – March 2013 Millennium Development Agency (MIDA)

· Construction of nursery block and place of convenience – Kwahu Mpraeso

· Construction of six classroom block and place of convenience – Kwahu Ntomem.

3. Murphy Construction Ltd. - September 2009 – 2011 August. General Supervisor

· Supervised over 15km of virgin roads - filling, sub-Base, Base Asphalting and Swampy sections stabilized.

4. Golden Star Ltd., Wassa – Akyempim - May 2008 – March 2009 Position: General Supervisor - Earthworks

5. Taysec Construction Ltd. - March 2006 – March 2008 General Supervisor

Project: Kwame Nkrumah Circle – Neoplan Achimota.

General road works – kerbs, drains & culverts, earthworks, Asphalting 6. Oswal Investments Limited / R.M SOTEG - August 2002 – January, 2005 a. Project: Tractor & Equipment

Position: Sub – Contractor – Earthworks, Primer Seal, Seal, Placing guard rail & Flag poles.

b. R.M SOTEG – Anwieso (Assin Foso)

Technical Supervisor: Culverts & Earthworks, Purchasing & Clearing – Planning & organization of works.

7. Bilfinger + Berger – May 2000 – June 2002

Position: General Supervisor

Project: Ho Township 4.4km

Responsibilities:

Ø U drains & cover slabs

Ø Culverts

Ø Kerbs

Ø Traffic signalization

Ø Earthworks

Ø Pre coating & seal

8. Bilfinger + Berger – February 1996 – May 2000

Position: General Supervisor

Project: Urban II Transport Project (Metro Roads Accra) Ø Asphaltic extension – Kotoka Int. Airport Runway (60m) Ø Asphalting airside – Domestic Terminal

Ø Car park construction

Ø Road KLM office – by pass Tetteh Quashie interchange Ø Apron repairs

9. SONITRA – October 1993 – February. 1996

Position: Senior Supervisor

Project: Asphalting Accra roads – Kawukudi – Ridge hospital, Sub-Base, Base.

Ø Asphalting Nyamekye – Kokompe Road

10. Kotoka International Airport Rehabilitation

Project: Kotoka International Airport. - December. 1991 – May, 1993

Position: Forman

Rehabilitation of runway – Asphalting

11. Taylor Woodrow International – November 1985 – October. 1987 Project: Bontanga Irrigation Project. Tamale

v Driver / Operator

v Building Dam

REFEREES

Mr. Sampson Twum

Tel: 020*******

Mr. Gabriel Tsikata

Tel: 020*******

Hon. Seth Kwame Acheampong

Tel: 024*******



Contact this candidate