CURRICULUM VITAE
PERSONAL DETAILS
Telephone - 024*******
Date of Birth - 03/02/64
Nationality - Ghanaian
Marital Status - Married
Languages Spoken - English, Akwapim, Twi, Asanti, Dagbani, Hausa
PROFILE
Diligent, Confident, Self-motivated, Implementing to Specification & Effective Administrative Control System.
SKILLS
· Earthworks - Excavation, Fill, Sub-Base & Base
· Asphalting
· Surfacing
· Kerbing
· Drainage works
· Residential construction
CAREER OBJECTIVE
Remain a result oriented personal with maximum input team work to impact positively on the company’s primary aim.
INSTITUTION S YEAR QUALIFICATION
Sakasaka Experimental School - 1968 – 1974
Tamale Secondary School - 1974 – 1981 GCE ‘O’ ‘A’ Level Nyankpala Agric College - 1982 – 1985 Diploma Crop Science Name - Abraham Ofei
CONSTRUCTION EXPERIENCE
1. Ussuya Ghana Limited : 2013 to date
Position: Project Supervisor
· Organizing and managing daily activities on site.
· Liaising with consultants, sub-contractors, surveyors, quantity surveyors, supervisors and the general workforce on the project.
· Maintaining the use of specified materials to achieve perfection.
· Acts as technical advisor on site for works, and improves the experience of workers and operatives.
· Communicates with project manager, consultants and their representatives
(quantity surveyors, surveyors, engineers, and architects) for positive results, including attending regular meetings to maintain constant information of work progress.
· Planning works and efficiently organizing plant and site f acilities in order to exact specifications and agreed deadlines.
· Maintaining quality control, health and safety on site. PROJECTS UNDERTAKING
· Asphaltic overlay of Heli-pad at police headquarters – Accra
· Asphaltic overlay of University of Ghana Roads, Legon – Accra
· Earthworks, priming and asphalting of car parks – University of Ghana, Legon – Accra.
· Shai Hills Military Camp Earthworks Asphalting.
· Asphaltic overlay on couple of roads within Accra Metropolis. Ø North industrial road
Ø Abeka Junction – Abeka Lapaz road
Ø Ring road central
Ø Presidents locality – Nima
Ø Vice President locality – Kanda
Ø Kaneshie Market area
Ø Stabilizing Swampy section of roads
Ø Placing sub-Base & Base at Specified sections etc. Ø Portions of East Legon roads.
· Asphaltic overlay at Manhean Roads – Tema
· Supervised roads within Trinity College: Treated soft spots, laying Base, priming and asphalting – Accra.
· Supervised 20km patching of potholes Earthworks, placement of Asphalt and Asphaltic overlay – Kassei to Ada
· Ho Supervised clearing of trees, shrub and top soil off the shoulders of road.
· Supervised filling sub-Base, Base, primer seal, first and second seals in ninety days.
· Filling of over 20kms of Ho – Adidome and University of Health and Allied Sciences (UHAS) Roads to Minimum Height of not less than 800mm.
2. Justmoh Construction Limited - March 2012 – March 2013 Millennium Development Agency (MIDA)
· Construction of nursery block and place of convenience – Kwahu Mpraeso
· Construction of six classroom block and place of convenience – Kwahu Ntomem.
3. Murphy Construction Ltd. - September 2009 – 2011 August. General Supervisor
· Supervised over 15km of virgin roads - filling, sub-Base, Base Asphalting and Swampy sections stabilized.
4. Golden Star Ltd., Wassa – Akyempim - May 2008 – March 2009 Position: General Supervisor - Earthworks
5. Taysec Construction Ltd. - March 2006 – March 2008 General Supervisor
Project: Kwame Nkrumah Circle – Neoplan Achimota.
General road works – kerbs, drains & culverts, earthworks, Asphalting 6. Oswal Investments Limited / R.M SOTEG - August 2002 – January, 2005 a. Project: Tractor & Equipment
Position: Sub – Contractor – Earthworks, Primer Seal, Seal, Placing guard rail & Flag poles.
b. R.M SOTEG – Anwieso (Assin Foso)
Technical Supervisor: Culverts & Earthworks, Purchasing & Clearing – Planning & organization of works.
7. Bilfinger + Berger – May 2000 – June 2002
Position: General Supervisor
Project: Ho Township 4.4km
Responsibilities:
Ø U drains & cover slabs
Ø Culverts
Ø Kerbs
Ø Traffic signalization
Ø Earthworks
Ø Pre coating & seal
8. Bilfinger + Berger – February 1996 – May 2000
Position: General Supervisor
Project: Urban II Transport Project (Metro Roads Accra) Ø Asphaltic extension – Kotoka Int. Airport Runway (60m) Ø Asphalting airside – Domestic Terminal
Ø Car park construction
Ø Road KLM office – by pass Tetteh Quashie interchange Ø Apron repairs
9. SONITRA – October 1993 – February. 1996
Position: Senior Supervisor
Project: Asphalting Accra roads – Kawukudi – Ridge hospital, Sub-Base, Base.
Ø Asphalting Nyamekye – Kokompe Road
10. Kotoka International Airport Rehabilitation
Project: Kotoka International Airport. - December. 1991 – May, 1993
Position: Forman
Rehabilitation of runway – Asphalting
11. Taylor Woodrow International – November 1985 – October. 1987 Project: Bontanga Irrigation Project. Tamale
v Driver / Operator
v Building Dam
REFEREES
Mr. Sampson Twum
Tel: 020*******
Mr. Gabriel Tsikata
Tel: 020*******
Hon. Seth Kwame Acheampong
Tel: 024*******