Post Job Free

Resume

Sign in

Site Engineer Manager

Location:
Yangon, Myanmar
Salary:
Negotiate
Posted:
September 11, 2023

Contact this candidate

Resume:

YAR THEIN OO

( Civil Engineer )

Mobile : 95-988*******

WhatsApp : 65- 81772450 / 81362809

E-Mail : adzmv6@r.postjobfree.com

Address : **, * *****, ********* ******,

Bahan City, Yangon .

P E R S O N A L P A R T I C U L A R S

Date of Birth : 21 Nov 1979

Current pass : S Pass

Marital Status : Married

Race : Myanmar ( Buddhist )

Gender : Male

Web: linkedin.com/in/yar-thein-oo-a2b97b20b

Experience : ( 20 years over) Singapore, Malaysia,

Myanmar

Expected salary : (Negotiate) 3500 $

Notice Period : Immediately

Career Objective

20+ years experienced Engineer with expertise in MRT Project, Building Projects, HDB upgrading, Reclamation & Roads in Site execution and approval, Construction Engineering, Planning, Site Coordination, Client and Technical Correspondence. Proven experience in execution and supervision of Buildings, Reclamation, MRT Bole piles, Ware House and Factory Building works. Capable to handle multiple projects within set budget and time frame. And effectively prioritize job responsibilities. A motivated and team leader who possess keen eye for details together with professional skills like analytical, planning, organizing, site supervision, technical correspondence, time management and communication. Well experienced with managing projects as QP(S) representative. I would like to seek exposure in a firm where my talents can be strengthened and extended. The position I am pursuing is one that will utilize, my analytical skills and keep me constantly challenged whilst developing my competence and confidence.

Having experience with comprehensive knowledge in engineering & construction of high-rise buildings including Maintenance, various Architectural finishing works, RC and Structural Steel works, Reclamation and Infrastructure works are Finishing of successful completion in Mega Projects at Malaysia, Myanmar and Singapore.

Attend coordination meeting with Client’s, Authorities, subcontractors to daily progress meeting and arrange for the workforce and machinery.

Inspection and monitoring daily site activities to ensure the quality of work in compliance with contract requirements and Authorities. Moreover, Timely feedback to QPS and Resident site management when necessary.

Supervise project efforts of subcontractors, supervisors and skilled workers to comply with project plan and specifications and good construction practices to achieve the quality of work.

Manage the large workforce; exercise quality control on several construction activities

Coordinate with different teams for proper procurement and delivery of engineering materials.

Responsibility for the overall supervision of structural and finishing works at the project are in order to meet requires quality, schedule, and costs. Prepare progress report and project schedule as well as plan estimates for the project. Well to know experiences with multicultural peoples such as (Chinese, Japanese, Malaysian, Thailand, Bangladesh, India & Philippine) and strongly political knowledge background.

Well experience of surpassing though under pressure, tight schedule and critical conditions environments.

Suitable for the Night shift, day and night rotate shift, long times working environment.

Coordination between C&S, Design department, Qs department and Mechanical and Electrical departments for design and build projects including regulatory requirements.

Language Proficiency:

Language

Speaking

Writing

Myanmar

Mother Tongue

Mother Tongue

English

Good

Good

Malay

Fair

Fair

EDUCATION/QUALIFICATION ACHIEVED

Diploma in Civil Engineering (Civil)

Government Technical Institute (Myanmar )

ATTENDED THE FOLLOWING SELF IMPROVEMENT COURSES

Certificate in building Construction Supervisors Safety Course (BCSS) ( Singapore )

Contractors Association Ltd (SCAL) Academy. Feb 2009 ( Singapore )

Certificate in Safety & Health Management System (SHMS) Course Safety and Advisory Services Pte Ltd. Dec 2009 ( Singapore )

Certificate in Safety Instruction Course (Manhole) foe Supervisors Absolute Kinetics Consultancy Pte ltd. Mar 2009 ( Singapore )

Certificate of Auto CAD 2006 (Myanmar)

Microsoft windows application Course 2007 ( Myanmar )

Certificate for Civil Engineering from Lian Hup Engineering Works ( Malaysia )

Certificate of Employment from Penta – Ocean Construction Co; Ltd ( Singapore )

OTHER’s QUALIFICATION

Registered Engineer, (RE – Construction: 02190, MEC, Myanmar)

Civil Engineer, (CE – Construction: 010593, MES, Myanmar)

Registered Engineer, (RE – Construction: 1005, YCDC, Myanmar)

Member, Federation of Myanmar Engineering Societies

Myanmar Class 3 Driving Licence

Society of Myanmar Civil Engineers, Singapore (Member)

Computer Skills

Microsoft Office, Excel, Word

Auto CAD

Total Years of Working Experience = 22 Years (Singapore, Malaysia, Myanmar)

2022 – 2023 ( 1 year ) - Sin Herb Development Pte Ltd (Site Engineer)

2016 - 2021 ( 5 years ) - ( Great Crown & Grow Co ; Ltd ) Government Projects in Myanmar (Director)

2013 - 2015 ( 3 years ) - HT Prime Consulting Pte Ltd ( Site Engineer )

2012 - 2013 ( 2 years ) - China Railway 11 Bureau Group Corp ( Site Engineer )

2010 - 2012 ( 2 years ) - Raymond Construction ( Site Engineer )

2007 - 2010 ( 3 years ) - Penta – Ocean Construction Co Ltd ( Technical Officer )

2003 - 2006 ( 3 years ) - Lain Hup Engineering Works Sdn Bhd ( Supervisor )

2001 – 2003 ( 2 years ) - Myanmar Government Construction ( Site Supervisor )

July 2022 – July 2023 : Site Engineer

SIN HERB DEVELOPMENT PTE LTD

(CHINA RAILWAY TUNNEL GROUP) (Under Sub con)

Contract C885 - Prince Edward Road MRT Circle Line

80, Shenton Way (Singapore)

Responsibilities

Daily tool box meeting with all worker (especially myanmar workers) for Site Safety talk & new workers SIC Briefing translate with Myanmar language.

Preparation of daily Site inspection plan report to Manager, Main con & QPS.

Before rebar’s inspection check approved drawing & arranged inspection time.

Supervision of Rebar works such as (Columns, Skin wall, internal wall, Platform slabs, Non load bearing walls, Opening slabs, Staircases, Sum pits, etc. ) .

Missing starter rebar arrange the drilling depth check, clean the holes after planting rebar with (REO 502 use) & pull out test ( calibration certificate ) check with RTO.

Check to ensure that the ( Rebars size, space,shear links ) rebars are lapped with the cast-in post installed starter bar / connected to the cast in couplers to ensure that they are properly screwed or locked. Openings area need to proper check because extra trimmer bars have. Wall connection area (T, L) need to check the approved drawing.

After rebar’s inspection done formworks supervisor arranged for closing & if formworks close done (PE issue COS & RTO) inspection check.

Check the cleanliness of formwork, support, concrete cover ( Formworks & bar chair design by PE ) and must be cleaning the ( rush,oil,grease,paint,mud or any other )

Check the Concrete casting works for (design mix, batching plant, car travelling time, slump test, mould check. Ensure concrete is compacted using vibrator shall be thoroughly worked into all parts of the formworks between around the rebars.

After casting refer to method statement by QP (temperature, curing compound, and appropriate times to dismantle the formworks.)

Record work daily and attend the daily meeting and discuss for progress to achieve target.

This project is under LTA so take care more for workers safety.

June 2016 – Dec 2021 : Director

GREAT CROWN & GROW Co; Ltd

Government Tender Projects (Minister of Construction, Education & Health) Road & Building

(Myanmar)

Responsibilities

Daily meeting with Site Managers and Engineers.

Check the daily reports and all other documentations as required for the project and report from engineers.

Oversee the project operations department from pre-qualification, tendering to completion including but not limited to quality, safety, cost and budget management

Identify pre-tender and project risks and developing appropriate mitigation strategies, recommends policy and procedure improvements.

Lead and provide strategic and professional guidance to all personnel on matters relating to the project performance and compliance, contractual obligations and statutory requirements.

Ensure full compliance with all company policies and procedures, including but not limited to ethics and business practice.

Conversant with local construction codes, rules and regulations.

Demonstrate leadership, take ownership of projects handled and all related works including deployment of project team members.

Responsible for building rapport and liaise effectively with clients, consultants, subcontractors and relevant authorities.

Report project progress including revenue, cost, potential risk, and etc. to Head Office Management on timely manner.

June 2013 – May 2014 : Site Engineer

HT PRIME CONSULTING PTE LTD

KLA Tencor Building

4 Serangoon North Ave 5

(Singapore)

Responsibilities

Daily tool box meeting with all sub cons and permits word sign for them.

Preparing of daily reports and all other documentations as required for the project and report to Manager.

Inspection forms preparation & Site Inspection with RTO.

Supervision of steel structure works such as alignment, levelling for beams, columns, Walls, slabs, roof & other external structure works.

Supervision of Architecture works such as Fire Rated Partition wall, Glass & Aluminium Panels, Metal Cladding, Columns box up, Vermiculite Spray, Celling, Toilet, Tiles … etc.

Supervision of M & E works such as Sprinkler alarm pipes, AHU, Chiller water pipes, Air-con ducting … etc.

Liaison with sub-contractors and suppliers & Ad-hoc assignments.

Feb 2012-May 2013 : Site Engineer

CHINA RAILWAY 11 BUREAU GROUP CORPORATION

Contract 1686 (Station EW32 & Viaducts for Tuas West Extension)

(Singapore)

Responsibilities

Daily tool box meeting with all sub cons and permits word sign for them.

Inspection Request Form preparation for Bore piles, RC piles, Sheet Piles, Pile Cast, Drain Structure works and other works to RE.

Check the survey setting out and locate services with cable detector digging trial trench. All the underground services must be clean first.

Check the Soil Investigation Record, NCE, Rebar Case Lifting (point, rest bar, hook), checklist form the Sub-cons.

When Inspection (Consultant RTO, sub-cons & me) go & check the boring point, trial trench, Bored pile record, polymer record, concreting record.

Supervision of structure works such as rebar, formwork, alignment, levelling for beams columns, slabs & other external structure works.

Contact with the Sub-cons & Suppliers for delivery order at the site necessary. (Concrete, Rebar, etc.…)

Requisition form for delivery orders, site office stationery orders, and etc. preparation and send email to main office.

Record work daily and attend the daily meeting and discuss for progress to achieve target.

Verification of sub-contractors work done and reporting of daily progress to Site Manager.

Jul 2011- Dec 2012 : Site Engineer

ISO-TEAMS CORPORATION PTE LTD

(RAYMOND CONSTRUCTION)

Neighbourhoods Renewal Programmer

(Blk 402 to 417) Bukit Batok West Ave 4/7.

(Singapore)

Responsibilities

Ever working days morning we discusses with site Manager about the site condition. Assist the site manager works.

Set daily tool box meeting and ensure all the sub-contractors and workers.

Supervision of structural work such as rebar, formwork, alignment, levelling for beams, columns, slabs & other external structure works.

Inspection form preparation for structure and other works.

When Inspections (RTO, sub-cons & me) go & check the work places.

Contact with the Vendors, Sub-cons & Suppliers for delivery order at the site necessary. (Concrete, Brick, Rebar, Sand, Stone, etc.…)

Requisition form for delivery orders, site office stationery orders, etc.… preparation and sent email to main office.

Progress Reports, Vendor quotation, VO works, Sub-cons claims measure check and preparation at the site after that sent to HQ.

Preparation of detail engineering package which includes configuration drawings, calculations, procedure documents and bill of material, cost estimation and tender/ cost evaluation and progress reporting.

Check and inspect to get good finishing and proper work done (such as; brick work, plastering work, waterproofing work, topping work, tilling work and painting work.

Record work dairy and attend the daily meeting and discuss for progress to achieve target.

Verification of sub-contractor’s work done and Reporting of daily progress to Site Manager.

July 2007-Jun 2011 : Technical officer

PENTA –OCEAN Construction Co Ltd.

Parsi Panjang Terminal Phases 3 & 4

(Singapore)

Responsibilities

Assist the respective site Manager in daily dredging and reclamation in monitoring activities.

Geo Band, Reclamation & Dredging works.

Dredger material barges arrangement and Tag boats control the site.

Materials sample take and records with consultant RTO.

In change to all dredgers workings condition & report to section Manager.

Monitoring progress and report to Site manager and discuss for weekly schedule.

Understand hourly current and tidal list for analysis of dumping materials to locate on designated area positioning by GPS.

Planning for working interval time and for finishing at target times.

Set daily tool box meeting and ensure a;; the sub-contractors and worker to obey marine safety rules,risk assessment,risk assuming, risk analysis, preventive measure, control measure and others safety requirements and arrange machinery requirements.

Sand back filling for surcharge purpose and Dynamic

Compaction, Vibro compaction, CPT & Level compaction for Nuclear Density test.

Site inspection test preparation, request to consultant engineer and check the site.

Check underground service drawing and identify the cables.

Supervision and inspection of substructure such as micro pile and spun pile.

Installation Rebar & from work by design and schedule according to approved for construction drawing.

Check position of starter bars as per drawing design prior to cast plié- caps for installation of precast concrete column.

May 2003-May 2006 : Supervisor

Lain Hup Engineering Works Sdn Bhd.

Sungi Buloh Warehouse

(Malaysia)

Responsibilities

Supervision of structural work such as rebar, formwork, alignment, levelling for beams, columns, slabs & other external structure works.

Supervision of concreting and maintaining finishing level, curing and cube record.

Handed Architectural works such as brickworks, partition wall, water proofing, plastering works, laying of tiles, installing of doors and windows.

Fixed or installation work of timber scaffolding, steel scaffolding, dismantling works, form work to be fixed or installed properly for alignment and level according to drawing.

Jan 2001 - April 2003 : Site Supervisor

Myanmar Government Construction 1 Storey Factory

(Myanmar)

Responsibilities

Record work dairy and attend the daily meeting and discuss for progress to achieve target.

Installing steel structure, reinforcement, form works & concrete casting.

Requisition form for delivery orders, site office stationery orders, etc. preparation and send email to main office.

Check and inspect to get good finishing and proper work done (such as; brick work, plastering work, waterproofing work toping work, tilling work and painting work.

Supervision of structural work such as rebar, formwork, alignment, levelling beams, slabs & other external structure works.



Contact this candidate