Post Job Free

Resume

Sign in

Sr. Civil Engineer

Location:
Imus, Cavite, Philippines
Salary:
Negotiable
Posted:
September 12, 2023

Contact this candidate

Resume:

dmcv/file, Page * of **

DANNY L. MARQUEZ

CIVIL ENGINEER

Phase 1 Block 26 Lot 13 & 14 Sta.Rosa Hills Subd.

Brgy. Puting Kahoy (4118) Silang Cavite

PHILIPPINES

Mobile: +63-945-***-**** (Philippines)

Landline: +63-46-487-**** (Philippines)

Email Address: adzm46@r.postjobfree.com

adzm46@r.postjobfree.com

A Filipino Civil Engineer with more than 27 years’ exposure in Engineering & Construction specialized in direct Project execution, project monitoring & inspections, project tendering, quantification's, knowledgeable in safety engineering with QA/QC knowledge, specialized in civil horizontal & vertical projects, specialized in Railway Construction SGR (Track alignment works). A team leader and Strong multi-task with exceptional skill in functioning well in a high-pressure work environment. CORE QUALIFICATIONS

Adept in QA/QC Works, documentations, Inspections & preparations of construction methodologies.

Specialized in Railway, Track Alignment works, Civil Infrastructure & embankment works. Knowledge of the Oracle (ERP) system.

Construction Project Management and Supervision (Railway, Buildings & Civil Infrastructure). Adept in computer Software application MS Office (Word, Excel, and Power point) Manual rendering & detailing of working drawings.

Driving skill with professional license. (KSA & Philippines) A Safety Practitioner (Occupational Health & Safety) Drafting, adept in design, material quantification, estimates & material take-offs. Adept in Surveying Works for Quantification's.

Direct Project Execution.

Knowledgeable in Procurement System (Oracle) & ERP System Knowledgeable in preparation of Railway Method of Statement including Rail welding works. SUMMARY OF SPECIALIZATION

CAREER OBJECTIVES

Secure a responsible career opportunity to fully utilize my training and skills, while making a significant contribution to the success of the company, & to find a challenging position where I can grow both personally and professionally. Detail-oriented and committed to providing high-quality structures that comply with Health Environmental & Safety measures. PROFESSIONAL DEVELOPMENT

Qualifications

Certified Civil Engineer– DUBAI MUNICIPALITY, UAE-Passed w/ License No. 574079 (January 04, 2006)

Certified Saudi Aramco Permit Receiver (ID No. 8036067) Cert. No. 108,501

dmcv/file, Page 2 of 11

Affiliation / Organization Philippine Institute of Civil Engineers, Inc., Lucena City Chapter.

Member of Safety Practitioner (DOLE Phils.)

Member in Association of Dubai Sr. Civil Engineers

Alumni Member of BETA SIGMA FRATERNITY (KSA Assembly) Seminars/Training Courses Mandatory 8-Hours OSH Seminar for Workers Oracle E-Business Suite R12 Supply Chain & EPR System Construction of Safety and Health Course

Contractors Safety Program

First Aide Training Course

QA Management Course

Construction of Methods and Equipment

Highway Design & Construction

A CSR Project Orientation

Occupational Safety and Health Summit.

Basic Fire Fighting.

Basic Occupational Safety & Health Training Course. Advanced Course in Loss Control Management.

Industrial Fire & Safety Training

Quality Management System Training (ISO 9001-2015) Advancement in Railway Track Methodology.

BEMPLOYMENT PROFILE

Period Covered

Company

Address

Position Held.

Category

Project

Category

Duties &

Responsibilities

August 25, 2022 – February 8, 2023

GREAT ZONE ENTERPRISE

201 Kennon Road Camp 7 Baguio City

PROJECT MANAGER

General Contracting

SMDC CALM -Residences Project CSA (4 -Storey Mid-Rise Condominium Project) Brgy. Pulong Sta. Cruz; Sta. Rosa Laguna

General Contracting

Owns the development life cycle and is responsible for managing technical risks throughout the project, just to ensure the quality standard as per on ISO referring to the quality manual.

Resolve technical issues with employer’s representatives, suppliers, General Contractors, and statutory authorities.

Coordinates with the company or project purchasing department to ensure that purchase orders adequately define the specified requirements.

Measures and valuates (in collaboration with the project quantity surveyor where appropriate).

Engaging with Project team, client, and external stakeholders as necessary to identify requirements and develop engineering solutions.

Assigned to delegate to the teams all related engineering scope of works to execute the project as per on the design construction schedule ahead of time.

Participate in the weekly coordination meetings with the Clients/proponents together with the Construction management to resolve the project issues such as: materials delivery issues, project submittals, related shop drawings and other QA/QC matters.

Preparing the Construction Methodology in every scope of work related to the construction sequence.

Monitoring and tracking the OSM materials delivery as per the submitted design quantity.

Direct controlling the construction issues and easily resolve some sort of materials delay.

Prepare valuation, subcontract payment etc. & initiating and obtaining approval for variations.

Provide a summary of observations with possible solutions regarding project status, project delays & other issues and potential problem areas requiring follow-up actions related to delayed materials.

Overseeing and directing construction projects from conception to completion

Reviewing the project in-depth to schedule deliverables and estimate costs.

Overseeing all onsite and offsite constructions to monitor compliance with building and safety regulations.

dmcv/file, Page 3 of 11

Period Covered

Company

Address

Position Held

Category

Project

Duties &

Responsibilities

Period Covered

Company

Address

Position Held

Category

Coordinate and direct construction workers and subcontractors & Ensuring the Project Safety requirements.

Design construction projects by studying project concepts, architectural drawings, and models.

Estimates quantities & cost of materials, equipment, or labor to determine project feasibility. May 01, 2019 – June 13, 2021

TEKKEN CORPORATION (JAPAN)

5-3, Kandamisaki – Cho 2, Chome, Chiyoda-Ku Tokyo 101-8366 Japan CHIEF TRACK ENGINEER (Railway Engineer)

General Contracting

Yangon – Mandalay Railway Improvement Project Phase I, Package CP102: Civil and Track Works and Signaling & Telecommunication works between Bago & Nyaung Le Bin Contract No. CP 102 /MR (ML)/ 2018

Engaging with project team, client, and external stakeholders as necessary to identify requirements and develop track engineering solutions.

Ensuring that the Track works operation is ahead on time i.e., ballast leveling, removal and insertion of timber ties / PC ties, ballasting works, surfacing works including earthworks and embankment restoration.

Developing permanent way engineering design solutions from concept design through to construction.

Coordinating with other rail and civil engineering disciplines and actively participating in interdisciplinary workshops and risk assessments.

Ensuring that all work is undertaken in accordance with the appropriate legislation, corporate requirements, and systems.

Prepares all the Method of Statement related to track work activity for the consultant’s approval.

Prepares Method of Statement for the Flash Butt Welding, Aluminothermic Welding, in compliance with the European Norms (EN 14587-1 & 2 /2018, EN 14730-1), combining with the JIS standard

Assign to attend to assist QC team during the Inspection of all Track Works Scopes i.e.: Rail Inspection, Rail alignment, Rail Turn outs, Rail welding including ultrasonic inspection., etc.

Executes and assisting all Railway Engineer on site during operation just to ensure the safety and quality of works and to assure the clients satisfaction.

Prepares all the company quality manual and quality procedures to ensure the quality standards and methodology.

Review and check the comments on all drawings and documents submitted by Design Consultant(s) and ensure the incorporation of all revisions and rectifications on all documents.

Advise client on design issues and remedial actions in case of deviations.

Ensure all technical issues reach the Department Manager in a timely manner.

Owns the development life cycle and is responsible for managing technical risks throughout the project, just to ensure the quality standard as per on ISO referring to the quality manual.

Conduct project review, planning and support implementation of project contracts.

Planning the efficiently organize the plant & site facilities to meet agreed deadlines & schedules or window time.

Identify and report non-conformance's, undesirable conditions, and action item requests.

Ensure that quantities and qualities of import materials/items during materials inspections are agreed with the Contractor/Consultants.

Tracking of quantity requirements and delivery of ballast and sleepers every scheduled and nominated section.

Checking and verifying the survey tracks data to ensure the setting of rail centerline, check the track construction gauge according to the design tolerance.

Assuring the track alignment from initial up to final track alignment and design rail CANT before executing the ballast tamping to assure the track stability condition. November 2017- March 20, 2019

Team Industrial Services Est. (TEAMISECO)

P.O. Box. 6863, Dammam 3937 K.S.A.

ENGINEERING MANAGER / CONSTRUCTION MANAGER

(General Contracting &Trading)

dmcv/file, Page 4 of 11

Project

Duties &

Responsibilities

Period Covered

Company

Address

Position Held

Category

Project

Duties &

Responsibilities

National Grid (SEC), Saudi Aramco, MOI. Saudi Railways Project, MOH Project

Executes and assisting all Railway Engineer on site during operation just to ensure the safety and quality of works and to assure the clients satisfaction.

Ensuring that the Trackwork’s operation is ahead on time, ballast stopper, lined ditch, removal, and insertion of timber ties / PC ties, ballasting works, surfacing works including earthworks or embankment restoration.

Creates and executes quality development plans and revises as appropriate to meet changing needs and requirements.

Review tender and quotation inquiries received from clients and evaluate them to maximize the overall opportunity for the company including highlighting any risk.

Produce detailed Bill of Quantities (BOQ) from tender documents, site surveys and drawings.

Obtain competitive quotations from subcontractors & suppliers to prepare detailed estimates.

Prepare and finalize tender reports for adjudication of completed tenders and quotations.

Ensure all technical issues reach the Department Manager in a timely manner.

Preparing the project quality plans (PQP) as per on the scope and the quality manual (QM).

Prepares all the company quality manual and quality procedures to ensure the quality standards and methodology.

Provides and promote the company quality method and ensure the quality assessment, and manpower performance evaluation.

Ensures technical teams are contributing to our code library and ensure all the required project materials are based on the required specifications to assure the quality standard.

Owns the development lifecycle and is responsible for managing technical risks throughout the project, just to ensure the quality standard as per on ISO referring to the quality manual.

Support the Project Team in evaluating bids, defining construction methodology & project scheduling, QA/QC required project documents.

Preparing the quantification and materials take-off from BOQ’s and checking the materials based on the required project specifications.

Checking and final review for the tender documents before submitting bid proposal to the prospective clients.

Assist for the preparation of tender Documents, take off for the quantities for all the materials necessary required for the bid documents.

Review and check the comments on all drawings and documents submitted by Design Consultant(s) and ensure the incorporation of all revisions and rectifications on all documents. Advise client on design issues and remedial actions in case of deviations.

Conduct project review, planning and support implementation of project contracts. November 01, 2016 – November 01, 2017

Energy Development Company Ltd. (Contracting. & Trading) P.O. Box.79098 Al-Khobar 31952 K.S.A.

ENGINEERING MANAGER

General Engineering Work & Royal Commission,

Saudi Aramco Projects / MOE, MOI, MOT & SEC Projects., Saudi Railway Company.

Planning the efficiently organize the plant & site facilities to meet agreed deadlines & schedules.

Executes and assisting all Railway Engineer on site during operation just to ensure the safety and quality of works and to assure the clients satisfaction.

Checking and monitoring Daily activity railway track operation to avoid any untoward delays, and to assure the train line clearance is smooth & operational.

Ensure the Ballasting works are as per on the time schedule to avoid any delays for the line clearance for the next train schedule.

Properly secure and making coordination with the Train station master for the schedule of incoming Trackwork’s, Operation’s, i, e, Ballasting works, repair and removal of concrete sleepers, re- alignment & verifying tangency of track lines, preparation, and restoration of Railway embankment.

Produce detailed Bill of Quantities (BOQ) from tender documents, site surveys and drawings.

Provide technical support to the client, coordination with the other disciplines, completing

&assisting the team with the site-based construction team. dmcv/file, Page 5 of 11

Period Covered

Company

Address

Position Held

Category

Project

Duties &

Responsibilities

Checking and final review for the tender documents before submitting bid proposal to the prospective clients.

Identify the support requirements to include in the railway construction plan which consists of developing the HSSE plans, QA/QC plan, risk evaluation and resource requirements.

Attending the meetings to the Consultant / Designer to tackle all pending issues regarding the delays of design/drawings, Technical Submittals, modifications, and rectifications of shop drawings.

Review material submittals & construction schedules to ensure construction quality & sustainability.

Ensure contractual HSE requirements are met or exceeded, act as a leader in safety.

Assist for the preparation of tender Documents, take off for the quantities for all the materials necessary required for the bid documents.

Identify the support requirements to include in the construction plan which consists of developing the HSSE plans, QA/QC plan, risk evaluation and resource requirements.

Review engineering designs and project work schedules for commercial buildings, school’s recreational facilities and residential housing produced by Design and Build Contractors to ensure all Civil engineering elements comply with relevant building codes and Fire regulations.

Overseeing Quality control, Health & Safety matters on site. November 30,2014 – July 27, 2016

Al-Mashariq Trading & Contg. Company. (Construction & Projects Division) P.O. Box 2540 Dammam 31461 K.S.A.

TECHNICAL MANAGER / DEPUTY PROJECT MANAGER

Group of Companies (General Contracting &Trading)

General Engineering Work (Oil & Gas Plant) & Royal Commission (EPC) Projects, KFUPM- Completion of Site Development at Hafar Al Batin Community College. Saudi Aramco Projects, (SEC) National Grid Projects, SAUDI RAILWAYS PROJECT.

Properly secure and making coordination with the Train station master for the schedule of incoming trackwork’s Operation’s, i, e, Ballasting works, repair and removal of concrete sleepers, re- alignment & verifying tangency of track lines, preparation, and restoration of railway embankment.

Attending the monthly division meeting and giving the final reports regarding technical issues, which cause project delays and giving some recommendations to resolve the issues.

Ensure quality construction standards and the use of proper construction techniques.

Validating milestones and/or quantities submitted by the contractor for payment.

Ensure on time mobilization of the resources (manpower, machinery, material, and tools & tackles) as per the scheduled target dates.

Manage on-site logistics to optimize resources, minimizing multiple handling of material and storage. Ensure material at site is properly stored, marked, and tracked.

Checking of Technical and materials Proposal from approved Vendors/Material suppliers including all RFQ’s.

Coordination with Technical Staff regarding site progress, arrangement of resources on procurement issues, Technical Submittals Manpower & materials as per the project requirements including the schedules of technical submittals.

Prepare Method Statements; material submittals, request for information (RFI’s), change orders and coordinate the design to minimize construction cost while satisfying the client and contract requirements.

Checking of materials comparison as per the approved standard specifications from Clients.

Technically In-charge for the approval of Materials Request, Purchase Orders in related to ERP/ Oracle system (Enterprise Resource Planning.)

Verifying and reviewing all drawings before issuing final submittal for final approval in related to the design package.

Maintain record of Design Consultant(s) submittals and control in a timely manner the submittals/correspondence received.

Review and check the comments on all drawings and documents submitted by Design Consultant(s) and ensure the incorporation of all revisions and rectifications on all documents. Advise client on design issues and remedial actions in case of deviations.

Identify and report non-conformances, undesirable conditions, and action item requests. dmcv/file, Page 6 of 11

Period Covered

Position Held

Company

Address

Category

Project

Duties &

Responsibilities

Period Covered

Company

Address

Position Held

Category

Conduct project review, planning and support implementation of project contracts.

Provide a summary of observations with possible solutions regarding project status, project delays & other issues and potential problem areas requiring follow-up actions related to delayed materials.

May 12, 2012 - July 30, 2014

Construction Manager

HAMAD H. AL-ZAMI’H Contracting Est. (Dammam K.S.A.) P.O Box 155 Ras Tanura (Rahima) 31941

General Contracting Est.

General Engineering work, (Oil & Gas Plant) Saudi Aramco Projects (Dhahran) EWO-11CO31(B.I.# 19-118**-****)

Eastern Region K.S.A, / Saudi Electric Company (National Grid Projects.), SAUDI RAILWAY Co.

Support the Project Team in evaluating bids, defining construction methodology, project scheduling& project tendering.

Properly secure and making coordination with the Train station master for the schedule of incoming Trackworks Operation’s, i, e, Ballasting works, repair and removal of concrete sleepers, re- alignment & verifying tangency of track lines, preparation and restoration of Railway embankment and washout areas.

Responsible for Project Management, Direct Project execution for all construction activities at site, ensuring that all construction activities are being carried out as per the approved shop drawing, Method of statement and complies with the project specifications.

Preparing Quantifications for all materials required for the project, rebar cutting list & all quantity for bid requirements including detailed estimates.

Ensure that quantities of completed work items are agreed with the Contractor/Consultants.

Attending the Pre- bid conference and preliminary site inspections to verify the bid submission, clarifications especially for the item not included on the tender packages.

Coordination with Project Staff regarding site progress, arrangement of resources like Manpower

& materials as per the project requirements.

Ensure that required resource (s) is (are) available to the Construction to allow progress to be maintained in line with program.

Responsible for all construction activities at site and ensuring that all construction activities are being carried out as per the approved shop drawings, method of statement and complies with the project specifications.

Identify problematic design issues and make recommendations that support engineering procedures as well as ensure the construction schedule is maintained.

Dealing with the project proponents, inspectors (consultants) resolving some technical issues site discrepancies, dealing with vendors, attending project coordination meetings, resolving some site problems including project obstructions and change orders.

Assist for preparing QA/QC works, QA checklist, punch listing and proper QA documentations including the construction methodology and project quality plan, schedule “Q”, construction methodology and SAES procedures.

Preparing to arrange all Project requirements including submittals, Inspection Checklist (ITP) and all necessary project documents, scheduling and attending the meeting with the project proponents for the finalization, with regards to other technical matters.

Review all QA/QC Procedures, Proper documentations, including checklist and QA/QC plans with reflect to the technical Specifications.

Coordinate with the client’s QS for reconciliation of quantities prior to preparation of reports.

Prepare program of works, prepare manpower & equipment schedules.

Monitoring quality and progress of work/technical clarifications, etc.

Prepare valuation, subcontract payment etc. & T Initiating and obtaining approval for variations. February 15, 2009 to February 15, 2012

REVERE Construction & Supply

Sto.Tomas Batangas (Philippines)

Sr. PROJECT ENGINEER / CIVIL ESTIMATOR

General Contractor (Triple “A”)

dmcv/file, Page 7 of 11

Project

Duties &

Responsibilities

Period Covered

Company

Address

Position Held

Category

Project

Duties &

Responsibilities

Period Covered

General Engineering work, Site and land Development, Buildings, Roads, Bridges, Water System including STP Project, Horizontal and Vertical Projects, School Buildings & Facilities (Government & Private projects) Geothermal Plant.

Preparing Bid documents, necessary project permits, Material take-offs for Bill of Quantities and arrange the project schedule from mobilization to demobilization.

Assigned to take off for all the civil works quantities in preparation for the tendering of all civil bid documents and checking all methods of statement in preparation for the bid documents submittal to meet the deadlines.

Attending the pre- bid conference to verify the bid submission, clarifications especially for the item not included on the tender packages.

Conducts pre-orientation for safety precautionary construction method.

Participates in the final Inspection of completed sub-projects with consultants, representatives, engineers, and other co-implementers.

Preparing QA/QC works for procedures, checklist & documentations.

Prepare program of works, prepare manpower & Equipment schedules.

Prepares monthly consolidated accomplishment reports QCDR’s.

Taking over the Quality and Quantity of hand-over projects.

Review with workers all applicable safety rules, standard work procedures and emergency procedures.

Review job descriptions and describe to workers their specific OH &Safety responsibilities.

Prepare valuation, subcontract payment etc. & initiating and obtaining approval for variations. May 2008 – February 2009

Bin Hendi Construction LLC. (Dubai, U.A.E.)

United Arab Emirates (Dubai)

Sr. PROJECT ENGINEER / Actg. CONSTRUCTION MANAGER

General Contractor (Group of Companies)

Construction of G+2 Luxury Villas, G+4 Staff & Labor Accommodation.

Preparing the detailed estimate & project layout starting from sub-structure works to super structure including the access roads.

Preparing QA/QC works, implementations, procedures, checklist, punch listing and proper QA documentations.

Responsible for quantifying volumes of Ready-mix concrete and preparing the schedule of concrete pouring base on the project schedule.

Responsible as a QA/QC Engineer to ensure the quality of works, materials & ensure quality assurance of the project.

Checking and monitoring the final design elevation of the buildings as per plans & approved drawings based on standard design/drawings.

Conducts Pre-orientation for safety precautionary construction method.

Responsible to implement and ensure the site and Safety measures.

Prepares monthly consolidated accomplishment reports including the sub-contractor works.

Taking over the Quality and Quantity of hand-over projects.

Preparing the Periodical Safety reports.

Explain to workers their penalties for violating regulatory requirements for the company safety policies and procedures.

Review job descriptions and describe to workers their specific OH&S responsibilities.

Inform workers of their rights to refuse to work under unsafe conditions. December 2005 – March 2008

Company TARGET BUILDING MAINTENANCE (Deira Dubai UAE) Address

Position Held

Project

United Arab Emirates (Dubai)

CIVIL ENGINEER / QA/QC ENGINEER

Buildings& General Facilities /Dubai Base Project

Category General Building Works (High rise & Medium rise Buildings) Duties &

Responsibilities

Responsible for Project Management, direct project execution for all construction activities at site including material take-off for BOQ.

dmcv/file, Page 8 of 11

Period Covered

Ensuring that all construction activities are being carried out as per the approved shop drawing, Method of statement and complies with the project specifications.

Dealing with the Project proponents /Project Site Inspectors and resolving some site technical matters as necessary.

Responsible as a QA/QC Engineer to ensure the quality of materials & ensure assurance of the project.

Prepare valuation, subcontract payment etc. & Obtaining approval for variations.

Preparing QA/QC works, implementations, procedures, checklist, punch listing and proper QA documentations.

Prepares monthly consolidated accomplishment reports QCDR’s.

Taking over the quality and quantity of hand-over projects.

Explain to workers the penalties for violating regulatory requirements and company safety policies.

Review with workers all applicable safety rules, standard work procedures and emergency procedures.

Review job descriptions and describe to workers their specific OH&S responsibilities. September 8, 2003 – October 29, 2004

Company

Address

Position Held

MVM RAIL PTY.LTD. / MVM Rail Philippines, Inc.

Legaspi Village Makati City (Philippines)

RAILWAY ENGINEER / SITE ENGINEER

Project Main Line South Revitalization Project Phase 2 Remaining and Additional Works (Special Foreign Funded Projects.) Manila –Bicol Section

Category (Australian) Multi-National Construction Firm Duties &

Responsibilities

Assist site survey conducted by planning engineers and submit recommendations on structural aspects of the projects.

Monitoring and supervising all civil and Trackworks including the sub-contractor works such as: Bridges work, Pile driving, grouted Riprap, cofferdam, slope protection, embankment protection, Structural Erection, Rebar installation and concrete pouring for beams and abutment.

Checking and quantifying survey works i.e., earthworks embankment, structural erections for bridges parts, as-stake and the as-built design and drawings including the sub-structure works.

Track works, ballast stopper, lined ditch, removal, and insertion of timber ties / PC ties, ballasting works, surfacing works including earthworks.

Responsible for preparation for quantity of materials, Quality Control Diary Report, request for inspection report and manage submission of DAR by subcontractors in preparation for the monthly progress claims/invoices for billings.

Tracking of quantity requirements and delivery of ballast and sleepers every scheduled and nominated section.

Supervised profile survey of undisturbed track prior to commences of rehabilitation work, gather the actual curve description such as horizontal Versine and CANT for alignment, keep records and ensure restoration of the original Track alignment and elevation.

Preparing QA/QC works, implementations, procedures, checklist, punch listing and proper QA documentations.

Ensure QA/QC statement of work procedures being followed for replacement of timber ties with PC sleepers and distribution and regulating of ballast ensuring railway track to be passable after the day works.

Period Covered April 30, 2001 to September 08, 2003 Company

Address

Position Held

BABEROCK Crushing Contractor.

Pagbilao Power Station (Philippines)

Sr. PROJECT ENGINEER / ESTIMATOR

Project Government Project (Provincial Engineer’s Office)/ Power Plants Category

Road, Bridges, Infrastructure, Buildings, Warehouses & Site Development Projects. General Engineering Contractor

Duties &

Responsibilities

Review the comment and approved revisions and additional drawings submitted by Sub- Contractor including implementations.

Supervise documentation and Site acceptances of DC rectifier, Civil and Electrical works and ensure commitment of contractor on compliance of deficiencies on a prescribed period. dmcv/file, Page 9 of 11

Assist site survey conducted by planning engineers and submit recommendations on structural aspects of the projects.

Coordination of technical meetings with the general manager and resolving various problems i.e., change orders, obstructions & variations including motor pool problems and Safety regulations.

Responsible as a Senior Quantity Engineer during project tendering for materials take-off.

Responsible for implementing site safety precautionary methods.

Coordinate with the client’s QS for reconciliation of quantities prior to preparation of reports.

Checking and monitoring the final design elevation of the buildings as per plans & approved



Contact this candidate