T.S.R. MAHESH KUMAR
M.Tech –Electrical
Contact: +91-837*******
E-mail: adzl9d@r.postjobfree.com/adzl9d@r.postjobfree.com
In quest of a senior management positions in maintenance management,reliability centered maintenance,maintenance planning,project management,in Power plant, process industries
Personal Details
Date of Birth : 8th July1969
Languages : English, Hindi, Telugu
Passport No : S 7635296 valid up to 24/10/2028
Notice period : 30 days
Cuttent CTC : 53 LPA+14 LPA (Variable)
Expected salary : 30 % hike
Proven Expertise
Operation and Maintenance with excellent budget controls.
Reliability centered maintenance an spare optiiztion
Reliability,Availability Maintainability analysis
Operatonal risk management and LOTO implementation
SAP best practice template implementation
Project Management, Erection commissioning of power plants equipments.
O&M planning
Client interaction.
Integrated management system implementation
6 Sigma, 5S, Kaizen, Poka Yoke, OEE& RCM.
RCFA,FMEA,Fish bone analysis, Cause and Effect Matrix, Why-Why analysis, Pareto charts.
MS Projects,MS office,MS power point
Excellent Presentation skills
Inventory ABC analysis,control and cost mitigation.
Excellent workshop conducting skills
Team Management through Mentor Mentee principles &Leadership.
Training and development.
KPI &Objective analytical ability
Credentials
M. Tech –Power systems
NIT- Warangal, India
B. Tech in Electrical & Electronics
VRSEC, Vijayawada,India
Note: consistently passed all exams with distinction.
Training
GeneralManagement programme - 30 days in XLRI-Jemshedpur-India
Finance for Non Finance
IOSH managing safely
HR for Non HR
Mentor Mentoring
Six -Sigma by Wipro
TPM training
5-S Conceptual training
Reliability centered Maintenance conceptual training by GE, Meridium
SAP End user trainings.
PLC and AC /DC drives by Siemens,ABB,schnider
DCS CS-3000
PMP Certificaton Training
IMS Internal auditor
Profile
Multi talented Electrical Power systems Master degree Professional,over 29 years of experience with wide international exposure in client interaction, onsite operational and technical coordination
Experience includes:
Capacity Selection of equipments,technocommercial comparisions,techno commercial discussion, procurements and contract dealings.
Errection,commissioning testing of all power plant electrical equipments including Generator,GT,ST,UAT,brushless and Brush type excitation systems,boiler, turbine,BOP auxillaries.
HVAC and related auxilarries
Installation,testing,commissioning of static protection relays of Generator/GT/UAT/ST/Busbar/Transmission lines
patrolling &maintenance EHV transmission lines and associated auxilarries
maintenance of EHV switch yard(including GIS) and associated equipments like CV/CVT/LA/Sf6 CB/off load breakers and protection systems
AC/DC,Regenerative /Non-regenerative Drives of Siemens/ABB,PLC’s of Siemens/ABB,
Excellent maintenance planing with proven SAP PM,WCM,MM,EHS/CMMS software skills
Implementation of Reliability centered maintenance and spares optimization
Experience in Reliablity Availability and Maintainability (RAM)analysis, FMEA, Asset reliability planning
Very good turnaround planning with latest turnaround techniques
Master in SAP plant maintenance,work clearance module implementation from client end.
Task risk assessment(HAZOP,HAZID,HAZRAS,HAZRC),condition monitoring, predictive maintenance concepts, 6 Sigma and 5S strategies
Preparation of quality,environmental, health safety policies, procedures, work instructions as per ISO standard
Fair experience in Implementing ISO QMS, EMS, OSHAS.
Significant Achievements
VEDANTA- BALCO 1740 MW POWER PLANT SINCE DEC 2022
Working as Head O&M – COAL HANDLING PLANT -1740 MW
Handling OPERATION AND MAINTENANCE OF COAL HANDLING PLANT which includes coal unloading through rake/road,yard management, coal feeding to bunkers,physical verification
Leading a team of 980 manpower
JINDAL INDIA THERMAL POWER LIMITED DEC2020-DEC2022
Worked as Head - Electrical in 2 x 600 MW JINDAL INDIA thermal power plant, Angul,Orissa, India
Handling the plant maintenance including BTG/BOP,AHP/CHP/400 KV SWITCHYARD /72 KM OF 400 KV TRANSMISSION LINE
Leading a team of 200 manpower
STEAG ENERGY SERVICES LIMITED May 2017-NOV2020
2 X 600 MW SINGARENI THERMAL POWER PLANT -JAIPUR,MANCHERIAL
ADDL.GENERAL MANAGER ELECTRICAL
Working as Head - Electrical in 2 x 600 MW Singareni thermal power plant, Mancherial,Telangana, India
Established Various worlds best maintenance practices after the date of COD
Reduced forced outages due to electrical from 19 to zero with in 1 year with excellent technical and target oriented leadership qualities
UNIT 1 RUNNING WITH OUT ANY ELECTRICAL FORCED OUTAGE from SINCE JULY 2018
UNIT 2 RUNNING WITH OUT ANYELECTRICAL FORCED OUTAGE SINCE NOVEMBER 2018
Established 99.98 % plant reliability with focussed reliability centered maintenance approach
Leading a team of 125 manpower
POWERMECH PROJECTS LIMITED JULY 2016-Feb2017
SITE HEAD
Worked as site head for 2 x 600 MW coal based power plant at cuddalore, Tamilnadu
Worked with MAS Powermech Arabia- Riyadh office on turn around project of power and desalination units in Saudi Arabia.
SABIC-JUBAIL -KSA AUG 2015- May 2016
Worked for SABIC on Process knowledge Assurance and Business process data quality project
Updation of Process documentation as per the current processes and training the end users
On SAP Plant maintenance
NOMAC:FIRST NATIONAL OPERATION AND MAINTENANCE COMPANY-JEDDAH-KSA
PROJECT MANAGER APRIL’2009– AUG’2015
Best handled Project manager role of power and desalination plant
Managed the Maintenance planning with proven SAP/CMMS software skills
Applied VED analysis to all O&M spares and Ensured the spares best availability through SAP MM functions
Created best MRP planning in SAP MM function and automized the total procurement cycle of critical spares
Created the service master for all routine and overhauling services and established standard service rates for all plants.
Implemented Reiability centered maintenance and spares optimization
Optimized the task lists and Maintenance plans as per FMEA data
Formulated Task Risk Analysis (TRA) forms,conducted workshops to identify O&M activity risks and Implemented LOTO system based on the TRA output through SAP-WCM(Work clearance Management) module
Lead the Implementation of SAP Plant Maintenance Module for effective maintenance processes
Established Hazard Identifiction Risk Assessment and Risk Control (HIRRC) and Aspect Impact Assessment to make the plant industrially higene and environmentally friendly.
Established latest condition monitoring techniques and carried out predictive maintenance to mitigate the potential failures
Established Centralized procurement and contract services through service master to ensure the maintainability
Preparation of quality,environmental, health safety policies, procedures, work instructions as per ISO standards
Implementation of ISO standards through renowned ERP system –SAP-ECC6.0 .
Fair experience in Implementing ISO QMS, EMS, OSHAS.
Team leader in 2 certification audits and 7 surveillance audits of ISO 9001,14001 and 18001 for power plants.
VEDANTA ALUMINIUM LIMITED: Sep’1999-Mar’2009
VEDANTA ALUMINIUM LIMITED- CPP
HEAD ELECTRICAL MAINTENANCE
Established Various worlds best maintenance practices in condition monitoring and maintenance of switchyard and generator
Best handled patrolling and maintenance of EHV Transmission Lines
Established Hot line maintenance on 220 KV transmission lines to reduce the plant shutdowns and increase plant Availability.
Implemented the composite grid islanding and load management system to avoid power black outs during grid disturbances.
Established grid islanding and load management settings after extensive studies through RTDS( real time dgital simulation) in Central power research Institute.
Accomplished industrially Hiegiene in all areas of power plant by implementing HIRARC
Reviewed and updated the maintenance procedures as per the reliabiliy scores and FMEA data.
Achieved plant scheduled availability of 99.98 % two years consecutively .
Preparation of quality,environmental, health safety policies, procedures, work instructions as per ISO standard
Fair experience in Implementing ISO QMS, EMS, OSHAS.
Implemeted process efficiency programs like kaizen,pokayoke
Recognized as “Star performer” by Vedanta group
BALCO CAPTIVE POWER PLANT
HEAD OPERATION & MAINTENANCE
Reduced the boiler tube leakages due to ash erosion from 60 to 20 per year.
Reduced Turbine – generator overhauling time to 9 days 2 hrs against previous record of 13 days by identification of potential time saving activities & adoption of SMED techniques and MS Project.
Reduced the overall store inventory by 8%.by VED and ABC analysis techniques.
Applied VED analysis to all O&M spares and Ensured the spares best availability through SAP MM functions
Headed the Electrcal maintenance department introduced the Hot line (live) maintenance on EHV switch yard and transmission lines and carried out tightening and replacement of clamps and insulators online
Carried out retrofitting and maintenance of Power transformers and rectiformers and onload tapchangers including Oil filteration
Introduced latest condition monitoring techniques on all power generation equipment and carried out predictive maintenance to reduce the potential failures
Carried out many Latest RLA tests on power generating electrical equipments and taken corrective measures to improve the life of the equipment
Organized OPGW cable laying on Tr. Lines and installed fast acting Tr. Line protection
Retrofitted all AVR’s to improve the generator availability during house load operation
Good experience in conducting OCC/SCC and Generator dynamic tests during capital overhaul of generators
Managed the Maintenance planning with proven SAP/CMMS software skills
Implemented 5S in three phases and reduced many occupional and safety hazards.
Implemented 6-Sigma in 2 phases and improved the generator and switchyard availability
Implemented GRID islanding & load management scheme to mitigate the power blackouts and improved the plant availability
Carried out HIRARC and Aspect impact studies and established indusrial hygine all over the plant.
Preparation of quality,environmental, health safety policies, procedures, work instructions as per ISO standard
Carried out O&M activity risk assessment and implemented the SAP PM-WCM module to ensure proper safety in all O&M activities
STERLITE INDUSTRIES LTD
HEAD MAINTENANCE-UTILITIES
Headed the Operaton and maintenance of Utilities of 250000 FKM plant
Best handled the HVAC system: Air handling units, Blue star ● Voltas make 500 TR centrifugal ● 125/250 TR reciprocating chillers ●, class100 / class 10,000 systems ● 240TR VAM chillers
Headed the maintenance department and implemented Reliability centered Maintenance across power plant
Recognized as “star” performer of Sterile group through ACT-UP group to work
in BALCO after Sterlite acquired shares and management control
Erected, commissioned and tested all utility equipments of 2.5 LFKM expansion plant including 132 KV substation, 4400 KVA UPS system and associated batteries,VAM chillers,cooling towers, Chlorine scrubbing plant, acid plant, softwater and DM water plants,fire alarm, fire fighting,
Mitigated the per unit generation cost by Key Energy conservation projects like power factor improvement projects, and utilization of waste heat from 6 MVA DG set by implementing the VAM Chillers & conversion of HSD based DG sets to Super LDO based sets.
Implemented many innovative projects like electrostatic filteration
system to achieve cl.10,000 system in the fibre manufacturing plant in place of traditional HVAC system
M.R.F. Ltd–TYRE MANUFACTURING INDUSTRY-SADASIVPET, HYDERABAD
Sr. Engineer (Electrical-Maintenance) 1993-August 1999
Responsible for maintenance of Experience in AC/DC,Regenerative /Non-regenerative Drives of Siemens/ABB,PLC’s of Siemens/ABB,HT/LT switchgear,LT/HT Motors, DG sets,Wartsila-ABB make multiple 6 MVA HFO based sets
Core Competencies
O& M Planning /Management
Effective Maintenance planning techniques with reliability centered maintenance concepts and latest condition monitoring techniques
Effective execution of maintenance processes like, corrective, preventive, breakdown, calibration, condition monitoring, condition based maintenance, reliability cantered, refurbishment maintenance, overhauling maintenance with optimum spares planning & execution of maintenance activities with proper spare planning
Applied VED analysis to all O&M spares and Ensured the spares best availability through SAP MM functions
Created best MRP planning in SAP MM function and automized the total procurement cycle of critical spares
Created the service master for all routine and overhauling services and established standard service rates for all plants.
Creation of router for production planning and creation of MRP to automize the procurement cycle for critical raw material
Effective maintenance history data up keeping through SAP ECC 6.0.
Total plant maintenance performance monitoring using advanced software like SAP ECC 6.0
Optimum Budgeting, & execution of Overhauls of power plants with advanced software like SAP project systems.
Ensuring the plant machine availability close to 100 % with proper preventive, condition monitoring & maintenance .
Preparation of maintenance budgets and budget tracking & executing cost saving, energy saving techniques/measures and modifications to achieve substantial reduction in O&M Expenditures and work within the budget
Expert in new generation maintenance and improvement techniques like six sigma, kaizen, fault analysis techniques; Over all equipment effectiveness, asset optimization concepts.
Project leader in implementation of SAP ECC 6.0 for all business processes of power plant.
Quality Assurance
Preparation of quality,environmental, health safety policies, procedures, work instructions as per ISO standards
Implementation of ISO standards through renowned ERP system –SAP-ECC6.0 .
Fair experience in Implementing ISO QMS, EMS, OSHAS.
Team leader in 2 certification audits and 7 surveillance audits of ISO 9001,14001 and 18001 for power plants.
Techno Commercial Operations
Evaluation of power plant,Bidding documents for cost effectiveness
Taking care of all the tender works from offer phase to till payment to vendor.
Tapping /identifying new projects, preparing/submitting the proposals for the smooth movement of operations.
Good knowledge in Scope of work preparation and cost benefit analysis of the projects identified and payback calculations after project implementation .
Team Management
Excellent team building strengths and completing the job by motivating the teams.
Good knowledge in Setting up skill set, scheduled skills evaluation, identifying training needs & organizing OJT.
Organising of mentor-mentee couples, to ensure optimum performance and increase the employee retention period.
Maintaining cordial relations with all legal authorities and also within the organisation through initiating settlement proceedings and enabling employees to voice their opinion on a common platform.
ERP(SAP-ECC-6.0) Software Implementation & Utilization
Successfully mapped and implemented SAP functional modules -Plant maintenance and work clearance management (PM-WCM), Quality management(QM),Environmental health safety (EHS)
Making use of 20 years of functionalexperience well defined the Enterprise Asset organization Structure, Functional locations, equipment, classification, Classes & Characteristics, work centers, BOM, measuring points, inspection routes, counters and object types
Well defined Notification & Work Order Processing for Corrective, Preventive,break down,condition monitoring condition based maintenance,calibration order,refurbishment modification, inspection of lifting tools and tackles and ressure vessels,modification processes, overhauling /unit outage planning with proper budget control in project systems. Implementation of Task Risk assessment and Risk based maintenance
Formulated the Task Risk Analysis forms and conducted workshops to analyse operational and maintenance risks involved.
Implemented the Lock Out Tag Out system through SAP-WCM (Work Clearance Management ) Module based on the Task Risk Analysis work shops
Carried out Centralized Maintenance planning for the different projects of an organization and optimized the maintenance Plans Through RCM
Effective resource utilization through SAP-ECC 6.0
RCM-Reliability Centered maintenance Implementation
Project leader in implementing the Reliability Centered maintenance and spares optimization concepts through SAP-ECC6.0 across all power plants of NOMAC.
Conducted the workshops for equipment and system analysis using end to end Reliability Centered Maintenance RCM analysis methodology
developed system and equipment criticalities and efficiently schedule Reliability Reviews using RCM methodology for the operation assets.
Defined and scheduled review teams for RCM analysis sustainable through live program
Conduct detailed analysis to determine Failure Modes Root Causes and formulate solutions with the strategic think team
Coordinated with Operations, Maintenance,Inspection, Engineering and defect elimination to determine resources and cost requirements to strategy enhancement solutions
Good knowledge of reliablity enginering methdologies and cocepts.
Through knowledge in Reliability availability maintainability (RAM) analysis
Maintenance Spares optimization as per the reliability matrix scores.
Excellent workhop conducting skills to formulate reliability matrix
Excellent workhop conducting skills to get Equpment Failure modes and mitigation plan data as per the reliability scores
Tracking of availability of the equipments as per the reliability scores
Good knowledge of failure analysis techniques like Rootcause falure analyis,cause ad effect matrix,fishbone analysis
Review &Optimization of maintenance strategies as per the reliability scores.
Tracking of maintainability of the individual equipmens as per the reliability score
Preparation of budget for the emergency spares and required modifications and controls as per the Reliability matrix.
Review and upgrading of of preventive, predictive and condition monitoring maintenance plans as per the reliability scores.
Analysis of MeanTime BetweenFailure(MTBF)and MeanTime To Repair(MTTR)reports and improving the condition monitoring.
Through knowledge and implementation of Industrial Hygiene (HIRARC) / Environmental Aspect impact /Occupational health and safety /waste management in SAP-EHS module for any Organization. Certified by Institution of Occupational safety and health-IOSH
ERM-Enerprise Risk Management:
Project leader in implementing risk management concepts
Preparation of risk register covering operational, maintenance task risks for all business functions of the organization.
Technical Expertise
Captive power plants ● PF fired Boiler ● Turbo generator,Brushless/brush type excitation systems, 220/11 KV Generator Transformer and offsite equipments ● Coal Handling Plant ● ESP’s & Ash handling ● DG sets ● cooling towers● HT/LT Motors,HT/LT switchgear,PCC’s & MCC’s.
Errection,commissioning testing of all power plant electrical equipments including Generator,GT,ST,UAT,brushless and Brush type excitation systems,boiler, turbine,BOP auxillaries.
HVAC and related auxilarries
Installation,testing,commissioning of static protection relays of Generator/GT/UAT/ST/Busbar/Transmission lines
patrolling &maintenance EHV transmission lines and associated auxilarries
maintenance of EHV switch yard(including GIS) and associated equipments like CV/CVT/LA/Sf6 CB/off load breakers and protection systems
AC/DC,Regenerative /Non-regenerative Drives of Siemens/ABB,PLC’s of Siemens/ABB,
Excellent maintenance planing with proven SAP PM,WCM,MM,EHS/CMMS software skills
220 KV,33,11 KV Switch yards and associated equipments ● transmission lines ● HSD based DG sets ● Super LDO based sets (11X400 KVA) UPS system (Invensys make) along with associated back up battery (2500 AH) system
Coal handling plant equipments like coal crushers, 1200 TPH coal conveyors, stacker reclaimer,wagon tippler, track hopper,dust collecton and dust extraction system,magnetic seperators, metal detectors, coal yard stacking and reclaiming, fire protection and fightinh systems.
HVAC system: Air handling units, Blue star ● Voltas make 500 TR centrifugal ● 125/250 TR reciprocating chillers ●, class100 / class 10,000 systems ● 240TR VAM chillers
Scrubber / DM water/soft water plants: Thermax culligan make ●gas scrubbing plant ● Ion Exchange make soft water plant
Fire alrm systems,Fire protection systems,PAsystems
Compressors/Air driers: Kirlosker ●GEC ● Khosla make compressors
Diesel generator sets of Cumins, Detroit,caterpillar, Wartsila
AVR systems Grid synchronization ● SCADA system and load shedding system
KRAs and KPIs across the career span
Establishement of plant reliability with a goal of zero forced outage and 100 % plant availability
Establishment of best world class maintenance practices across the plant
Establishment of best safety & environmental practices with goal of zero accidents and zero LTI
Erect Test, Commission, Operate and Hand over completed projects.
Manage end to end implementation of SAP PM-WCM,QM,EHS
Establish Reliability centre maintenance and spares optimization (RCMO)
Commission units of power plant electrical, i.e., commissioning of 220 KV switchyard, Boiler, Turbine generator, Generator Transformer and offsite equipments like, Coal Handling Plant,Ash handling, DG sets, cooling towers, PCC’s & MCC’s.
Review performance at the appropriate level and frequency to ensure effective control of project budgets.
Carry out energy conservation projects in the plant like power factor improvement, improvement of cooling tower efficiencies, installation of vapour absorption chillers, electrostatic filtration system.
Ensure Hazard identification, risk assessment and establish risk control measures.
Undertake initiatives like 6 sigma, OEE, Asset optimization & RCM, Kaizen, Poka Yoke, 5 S to sustain high availability
Conduct environmental aspect impact assessment implement and establish control measures to reduce the impact to comply with environmental acts.
Manage motivate and train project teams to deliver quality servces.
Quarterly review of the the performance of the employees
Oversee maintenance planning .
Drive implementation of Best operation & maintenance practices across the group power & water companies
Maintenance, repairs and overhauling Power plant units as per scheduled plan.
Proper preventive, condition monitoring, reliability centred maintenance practices implementation and establishement to increase the equipment availability and reduce the shutdowns.
Handling of Centralized contract services.
Material requirement Plan and monitor procurement process included RFI and RFQ packages.
Check, test the QC (quality control) and endorse the QA (quality assurance) report.
Preare and establish procedure to monitor and improve contractors erformance
Inspect the work of EPC contractors & subcontractors to ensure quality and that it was up to required standards.
Early Career
1991-’92 - Project Assistant - Western Regional Electricity Board-Mumbai- Study of SCADA System