Post Job Free

Resume

Sign in

Technical Support Instrumentation Supervisor

Location:
Jeddah, Mecca, Saudi Arabia
Posted:
September 09, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

adzkyo@r.postjobfree.com

****-629-***-****

****-**********

Name:

AKRAM SHAHIN

Designation:

Instrumentation Superintendent / Instrument Engineer (Construction)

Nationality:

Indian

Education:

Bachelor’s degree (BE) in Instrumentation & Electronics (Sept.-1999)

KBNCE, Gulbarga University, Karnataka, India

Prof. Affiliation:

Instrument Engineer, Sept.1999

Objectives & Goals:

To obtain a position as an Instrumentation Superintendent / Engineer where my skills and abilities will be utilized to enhance the productivity of the organization.

PROJECTS COVERED:

KUWAIT:

a. KOC - (New Gathering Centre, “GC-32” Project- JI-2035)

b. KOC - (Lower Fares Heavy Oil “LFHO” Project-JI-2029)

OMAN: ORPIC - SOHAR REFINERY IMPROVEMENT PROJECT-JI-2022- SOHAR

IRAQ: GAZPROM - BADRA OIL FIELD Project-JI-2013

TURKMENISTAN: TURKMEN GAS (TMG)- SOUTH YOLOTEN GAS Field Development Project-J199,

SAUDI ARABIA:

a. SAUDI ARAMCO- (Karan Utility and Cogeneration Project -KHURSANIYA)

b. SASREF AL JUBAIL - SASREF IMP Phase II Project

c. YAMBU SAMREF - LASADO (Low Sulphur Automotive Diesel Oil) / Wet Gas Compressor (WGC)

d. YAMBU - DCS Revamp / Upgrading Project with CRYSTAL CHEMICAL PLANT

KAZAKHSTAN: AGIP KCO - KASHAGAN Development Experimental Project (PMT)

SUDAN: PETRONAS - Sudanese Oil & Gas “White Nile Petroleum Operating Co.” (WNPOC)

IRAN: SHELL - N.P.C.C / NAFT SAZEH QESHM (NSQ Co.),

INDIA: B.P.C.L Refinery - Mumbai

CAREER SUMMARY:

22 years of Industrial work experience in Brown & Green Field in the field of Instrumentation (E&I) construction, pre-commissioning, commissioning, plant Start-Up, Initial Acceptance, warranty maintenance support and completion at Oil and Gas EPC Projects, Refinery, Petrochemicals, and Power Plants, Up gradation & Migration of old systems to the new systems at different work capacities as well as Leadership roles whereby leading teams in assigned projects which are deadlines driven environments.

Petrofac Total Experience: 13 years

Having proactive internal/external coordination on technical matters during Construction, pre-commissioning activities with vendors, contractors, and client.

Handled Instrumentation activities for utilities and common process facilities

Exposure of DCS, ESD, VMS and F&G control system like Yokogawa, Honey well, TRICONIX and BENTLY NEVADA.

Currently fully site-based construction & pre-commissioning /commissioning activities like all type of Instrument installation, Calibration, Installation of cabinet & console, Installation of all F&G DEVICES and Panel Tyco (Simplex 4010ES & 4100ES) in the Field and Building, the INERGEN SYSTEM as well as HVAC SYSTEM in the Buildings, Cable tray and cable pulling, Process and pneumatic tubing works, Loop check etc.

Managing multi-discipline, field engineering, construction teams for the execution and timely completion to achieve milestones like Mechanical Completion, System acceptance, and final handover

Ensuring total compliance during the construction and commissioning activities

Hands-on field experience during all stages of project life construction, pre-commissioning & start up.

Participating actively in the review and approval of field Engineering Design, philosophies, instrument installation details, Hook ups drawings.

Reviewing construction deliverables, P&ID, Hook up drawings, loop drawings, layouts, Loop Folders & Pre- startup & safety review (PSSR) documents.

Extensive exposure to ANSI/IEEE/IEC/standards and Aramco standards

Assuring technical integrity and functional verification of all field instruments and process control system (APCS/ESD)

SKILLS:

Microsoft office / 3D modeling

PETRO PCS (Project Completion System)

Conversant with Engineering Documents, GA Drawings, Overall Plot Plan, Overall Trenches & Tray Layout, Drum Schedule, Cable schedules, Wiring connection diagrams, Instrument Location Layout, Cable Block diagrams, Equipment List / Location Diagram, Cable Route Index, Instrument Index, Data network diagram, ILD, P&ID Drawings, Control Room Layout drawings, Logic Diagram, Hook up drawings, I/O lists, Cause & Effect, Instrument Data Sheet, Alarm set point, Interlocking drawings, Hazardous area classification drawings, vendor documents etc.

CAREER HISTORY:

May. 2019 -to- 31 Dec.23

Project : New Gathering Centre, GC-32 Project- JI-2035, Kuwait, $ 1.3 Billion

Designation : Instrumentation Superintendent (Construction)

Company : Petrofac International Limited.

EPC Contractor : Petrofac

Client : KOC

Key elements of the Projects

Control Building, Instrument Auxiliary Building (IAB-1&2), Main Sub-station, Process Sub-station, Compressor Sub-station, Tank area Sub-station, Maintenance Guard House Building, Gas Dehydration / Gas Conditioning Area (Train-1/2/3), LP/HP Compression (Train-1/2/3), LP/HP Separator Area etc.

Responsibility and achievements

Monitoring and surveillance of Field and Building Instrument erection activity in compliance with Drawing / Quality and safety aspects, carried out by Subcontractor.

Regular Tool box talk in different objects, maintain 100% PTW system, HSSE meetings, reduce unsafe behavior and make safe working culture within work force through frequent conversation, observations and good Housekeeping and weekly submission PAI /SOC.

Motivate the work force to aware contractors for the safe and professional work practice by avoid rework.

Active involvement for the Check- lists, ITR, Punches closure and attending final mechanical completion (MC) walk-downs with client for the delivery of the completed instrument systems to the commissioning.

Coordinate and follow up for the material with procurement Team for all the missing & damage item to make availability of material on time at site.

Plan and supervise all activities closely to avoid wastage or materials, re-work, idling of manpower and other resources.

Maintaining good relationship with sub-contractors, HSE department, Vendor representative, Client, and other discipline supervisors to speed up the progress without any time delay and with zero LTI.

Feb. 2017 -to- April 2019

Project : Lower Fares Heavy Oil (LFHO) Project- JI-2029, Kuwait, $ 4.4 Billion

Role : Instrumentation Superintendent (Construction)

Company : Petrofac International Limited.

EPC Contractor : Petrofac

Client : KOC

Key elements of the Projects

Central Processing Facility, Well Blocks and Infield Satellite Station (ISS), Package Sub-station, Admin-Building, EDG Building, Guard House, Main Sub-Station Building

Responsibility and achievements

Performed well assigned task with professional manner towards achieve the project completion in time with cost, quality and safety compliances and customer satisfaction.

Monitor the performance of the work to ensure that the Contractor assigns the appropriate resources to execute the work to the required quality, standard and within the agreed schedule.

Motivate the team members towards achieve completion by avoid rework.

Attending the Sub-System MC joint Walkthrough with Client and clear the all-punch list prior to handover the system to client

Directly involved with the sub-contractor to resolve the construction issues, technical query, and drawing related problem and installation work at site

Resolve all Technical queries from Client / PMC / sub-contractors and provided submissions.

Able to analyze every area to be survey and witness prior for RFI to be offered to the main client for inspection.

High level of HSE performance achieved in the work area by regularizing the Tool Box Talk, Simultaneous Operation Meeting (SIMOPS), identifying & correcting all unsafe act.

Dec. 2015 -to- Jan. 2017

Project : Sohar Refinery Improvement Project-J1-2022, Sohar, Oman, $ 3 Billion,

Role : Sr. Instrumentation Supervisor (Construction)

Company : Petrofac International Limited.

EPC Contractor : Petrofac - DAELIM JV.

Client : ORPIC.

Key elements of the Projects

Sulphur Recovery Unit, Boiler and Storage Tank Farms & Loading Facilities, Tail Gas Units, Bitumen Plant etc.

Responsibility and achievements

Reporting of Daily / Weekly progress and field / material / Manpower related constraints to the Construction Manager for getting the suitable corrective action.

Established daily follow up meeting and coordinate with Vendor and Subcontractor activities are carried out accordance with the approved standards and specification. And ensure that planned activities shall be completed within the project time frame.

Having weekly progress meeting with subcontractors, reviewing work fronts & highlighting lagging behinds.

Identifies deviations in Construction works from design scope and raise concerns and follow- up to the corrective actions.

Direct monitoring material take off (MTO) activities identifying irregularities and shortfalls, taking corrective action.

Prepared daily logs for contractor’s activities which reinforced the process of following productivity, as well as creating work plans for contractors to execute jobs based on priority systems and targets

Dec. 2013 -to- Nov. 2015

Project : Badra Oil Field Project-JI-2013, IRAQ, $ 330 Million

Role : Sr. Instrumentation Supervisor (Construction)

Company : Petrofac International Limited.

EPC Contractor : Petrofac

Client : Gazprom

Key elements of the Projects

Utilities, KOD, Process Trains 1/2/3 and Flare Area

Responsibility and achievements

Leading a team of Foreman and Technician, briefing them of their daily work and monitoring the progress at closer level, solving the constraints and liaison with the client to their satisfaction.

Ensuring that the tests and inspections are carried out by subcontractor according to the project specification & schedule.

Preparations of monthly look ahead schedule.

Identifies deviations in the design job scope, Construction works and raise deviations and follow up to the corrective actions.

Responsible for Reviewing and updating of latest drawing like P&IDs, ILDs, Hook-up, IFC drawing covering specification and Documentation prior to installation.

Attending Meetings related to the Project Quality Standards & requirements

To carry out walk downs of completed instrumentation systems for punch out and Red Lined as-built drawings of installations.

Interfacing and providing clarification, guidance and technical support to construction personnel and commissioning engineers, providing startup assistance as required.

Oct. 2012 -to- Oct. 2013

Project : South Yoloten Gas field Development Project-J199, Turkmenistan, $ 4.5 Bn

Role : Sr. Instrumentation Supervisor (Construction)

EPC Contractor/Company: Petrofac International Limited.

Client : Turkmen Gas (TMG)

Key elements of the Projects

Utilities, Train-1/2 Pipe Rack

Responsibility and achievements

Close coordination with Engineering to resolve the constraints in drawing and materials.

Maintaining the good workman ship with management, subordinates and technicians.

Worked closely with the auto completion system to resolve any constrains that were during the process of handing over to commissioning and followed up on the check-lists closure

Active involvement for the support of start-up and commissioning in ISBL, PKG-1.

Attending weekly management walkthrough to ensure that area is under control of safety concern

Feb. 2012 -to- Sep.2012

Project : Karan Utility and Cogeneration Project (LSTK3), Khursaniya, Jubail, $ 500 Million

Role : Sr. Instrumentation Supervisor (Construction)

EPC Contractor/Company: Petrofac International Limited.

Client : Saudi Aramco

Key elements of the Projects

Utilities, Cogeneration Plant

Responsibility and achievements

Responsible for proper execution of Job as per international industry standard, to coordinate and to properly guide the sub- contractors during construction phase to start-up and commissioning for the associated Instrumentation.

Successfully completed 40 Inches Sweet Gas Pipe Line from KHURSANIYA Gas Plant to Berri Gas Plant, Utility Comprising Boiler (MACCHI), Gas Turbine (Mitsubishi Japan, with a production capacity of 450 MW), Air Compressor (Cameroon), Reverse Osmosis.

To coordinate with various discipline personnel, vendors and clients for the up gradation of system (Yokogawa, TRICONIX PLC in the stipulated period without any system upset, Trips to avoid Production loss

April 2009 -to- Jan.2012

Project : Kashagan Development Experimental Project, Atyrau (Kazakhstan), $136 Bn,

Role : Sr. Instrumentation Supervisor (Construction)

Company : ( PMT ) Petrofac International Limited.

Client : AGIP KCO

Key elements of the Projects

Oil, Gas, Sulphur and Main Pipe Rack

Responsibility and achievements

Worked with Project Management Team and Supervise the EPC contractors and sub-contractors during the detailed engineering phase and construction activities, for all field instrument activities.

Provide supervision & technical support to the EPC contractors and sub-contractors during execution, Installation, Testing, pre-commissioning & Commissioning activities.

Conducted punch list errands to locate any required rectifications and/or re-work and followed up on the closure of the generated punch which eased the process of systems’ handing over and anticipated any construction problem ahead of time

Attending coordination meeting with all the discipline managers/Superintendent and Construction Manager (sub-contractor) and PMC/Client to discuss and resolve the hold points of E&I activity.

Conduct all work activities in a safe and environmentally responsible manner at all time by not taking on any task that is perceived as unsafe.

Oct. 2008 -to- April 2009

Project : Sudanese Oil & Gas “White Nile Petroleum Operating Co.” (WNPOC)

Role : Instrumentation Engineer

EPC Contractor/Company: Dietsmaan (Maintaining Energy)

Company : Petronas

Key elements of the Projects

Exploration and production plant

Responsibility and achievements

Responsible for assigning work to Team leader

Job distribution and manpower planning

Supervised the jobs for the field instrument overhauling and calibration of transmitters, control valves, controllers & switches

Responsible for the conduction of skilled troubleshooting activities (corrective & preventive maintenance) in the field and control room, on site or in workshop.

Familiar with carry out PM and CM on all types of field instrumentation.

Oct. 2003 -to- Aug. 2008

Projects:

1.SASREF IMP Phase II Project, (SASREF), Al-JUBAIL

2.YPT Ethylene Unit-10, with Saudi Yambu Petrochemical Co. (YANPET), YAMBU

3.Lasado (Low Sulpher Automotive Diesel Oil) & Wet Gas Compressor (WGC),(SAMREF),YAMBU

4.DCS Revamp / Upgrading Project with Crystal Chemical Plant, YAMBU

Role : Sr. Instrumentation Engineer (Construction)

EPC Contractor : Worley Parsons & Olayan Descon Industrial Co. Ltd

Client : Saudi Armco Shell Refinery Co

Key elements of the Projects

1.Utilities & Power Generation unit

2.DCS/ESD Control System Up gradation Project

3.Sulphur and Gas Compressor unit

4.Chemical Plant

Responsibility and achievements

Provide supervision for technical support on site during execution of the work.

Progress meeting and technical clarification with client.

Worked with Honeywell Turkey Arabia Co. Ltd. for Up gradation project of DCS 3000 in Ethylene unit like Pre-Commissioning, Commissioning of System (Loop Checking for PLC & DCS, ESD Logic Checking & Verification of Cause & Effect drawing.)

Successfully completed the task during T/A 2006 and achieved the target.

Leaded the team for the removal of the Bentley Nevada existing system 3300 with 3500 vibration monitoring system & Testing, Commissioning of the System

Installation of the micro net and Protech system.

For turbine & compressor all vibration & temperature alert & danger point checking with 3500 Bentley Nevada monitoring system & PLC HMI.

Supervising Yokogawa Middle East (YME) Bahrain for system Up Gradation Revamp Project

Feb.2002 – to - Sep 2003

Project : Soroosh and Nowrooz Field off Iran Project,

EPC Contractor : N.P.C.C / Naft Sazeh Qeshm (NSQ Co.), IRAN

Role : Sr. Instrument site Engineer

Client : Shell

Key elements of the Projects

Production Platforms (SLQ /NLG) and Wellhead platforms (SWP)

Responsibility and achievements

Supervision for Installation, Calibration, Testing & Commissioning of the Instruments.

Responsible for field Instrument installation including Fire & Gas system, Instrument calibration, cable pulling from field to Control Room, JB installation and Glanding & Termination

June 2000 -to- Jan. 2002

Company: Petrochemical Industries Co. (PIC) Kuwait

Role : Instrument site Engineer

Employer : UB Engineer Co.

Key elements of the Projects

Utilities and process area

Responsibility and achievements

Supervised the jobs for the field instrument overhauling and calibration of transmitters, control valves, controller & switches.

Co-ordination and monitored the task to meet and beat the dead line

Nov. 1999 -to- May. 2000

Company : B.P.C.L, Mumbai, India

Role : Instrument site Engineer

Employer : Elematics Engineer Co.

Key elements of the Projects

Utilities and Main Pipe Rack area

Responsibility and achievements

Site inspection for the instrument work

Experienced in construction & commissioning works according with following drawings: Inst. cable Trench, Tray, Conduit & Rooting Layout, Instrument & Equipment Location, Inst. air line piping layout, Instrument hook-up & Instrument Typical Drawings, Process & Instrument diagram (P&ID) etc.

Personal Details

Passport No : V6830300 (issued at Patna, India and valid up-to March’ 2032).

DOB : 25 .10.70

Contact details as follows.

Mobile Number (INDIA) : +91-629*******

Mobile Number (INDIA) : +91-993*******

e- Mail ID : adzkyo@r.postjobfree.com (Personal)



Contact this candidate