Key Of Resume Personal

Name : Robert Manurung

Age : 50 Years

Weight / Height : 67Kg / 170Cm

Passport No : E0744221

Nationality : Indonesian

Religion : Christian

Current Address : Jakarta-Indonesia

Mobile Phone : +62-812*******

Email address : adzkbj@r.postjobfree.com

Position : Supervisor Piping/Mechanical/Structural and QC Inspector

Education : Diploma of Mechanical Engineering

SUMMARY

Served more than 21(Twenty one}years of work experience as Constrution Supervisor Piping/Mechanical,

Structural and QC Inspector in the field of fabrication, erection and welding activities various construction projects in oil &gas,chemical process facilities,erection of piping,storage tanks,pipeline, pressure Have vessel and boiler.

Also performed static equipment erection and structural in Oil and Gas,Onshore/offshore,Shipbuilding, Hull Structure Construction and Piping System of FPSO Vessels, Platform, Refinery and other related industries covering constructions, fabrication and installation of piping systems and structures.Posses good technical knowledge in conducting Inspection such as: Welding, Material / Equipment verification and installation inspection. Familiar with most construction codes and standards such as:ANSI /ASME B31.1, ASME B31.3, ASME B16.5, ASME B16.34, ASME VIII, ASTM, API 510, API 650, API 1104. Having attended numerous numbers of Health, Safety and Environment ( HSE ) Induction and Awareness programs throughout the construction of Oil & Gas Projects. Understanding and knowledge as requirement in implementing the project Quality management System successfully and safely. Able to read and understand construction drawings, P&ID and other related requirements for the completion of the project. Work independently under pressure and adoptable with multinational personnel at all level

WORK EXPERIENCE SUMMARIZED AS FOLLOWS;

Working at Company: CSTS ( Chiyoda,Saipem,Tripatra, SAE ) JO

Name of the Project: TEP Project LNG Train 3,West Papua Inonesia

Name of the Client: British Petrolium / BP Berau Ltd and Skkmigas

Position: Construction Supervisor Piping and Structural Inclusive Date: From 12, August, 2019 up to 29, October,2021.

Responsibilities:

•To plan and Coordinate with Sub-Contractor Supervisor to determine manpower requirement

•Monitor daily / weekly activities ( fabrication,erection ) and coordinate with Sub-contractor as per pre established schedule.

•Ensure that all fabrication,welding,erection related records such as bill material,dimension, type of material and weld consumables

•Check and monitor the installed piping components as per P&ID and reviewing iso metric,support drawing and detail, type of Fitting / Valves, Flanges, Reducer, Elbow, TEEs,Bolt / Nut,Gasket,etc

•Conduct monitor and record pipe spools as per ISO metric during fabrication / after completed fabrication to be release for painting

•Responsible for the planning and executing Hydro test of the piping after closing the Punch list clearance from the Client Representative Bp Berau Ltd

•Conduct line checking together with Sub-Contractor prior to Hydro-testing and write any comment on the punch list form such as type of punch list A,B,C, etc if necessary

•Recognize employees strengths and weakness to ensure their success Proficiency pipe layout, Sub-Contractors scheduling, material procurement, safety policies implementation, and lockout tag out procedure

•Conduct inspection and make necessary recommendations according to process piping specification,assist qa/ qc for inspection of item prior to work standart and procedure

•Attend coordination meetings and discussions with client Representative Bp Berau Ltd

•Supervising subcontaractor over pipe fabricator, fabricating installing pipe and supports.

•Punch list /walk down systems with P&IDs and ISO's to verify and making punch list of unresolved items.

•Proficiently execute skills in installing Pipes,Flanges,control valves, pumps, and many other components

•Maintain a positive attitude and strong work ethic while solving problems under extreme pressure

•Review Job Safety Analysis to ensure completeness of resources, including information, tools, and material needed by staff to complete assigned tasks safely.

Working at Company; Air Energy / Airswift

Name of the Project; EPC-1 Banyu Urip Block Cepu East Java Indonesia

Name of the Client; Exxon Mobil Cepu Ltd ( EMCL)

Position; Construction Supervisor Piping / Mechanical

Inclusive Date; From 23,May,2015 up to 31,October,2016

Responsibilities:

•Main responsibility is to act as focal point for EPC piping system project which includes planing,coordination and monitoring of all discipline.Such as Fabrication of pipe spools, installation and Hydrotest,installations of rotating horizontal andverticalequipments like centrifugal pumps.pressure vessels, effluent and trimcoolers

•Inspect the condition of rotating parts namely shaft, sleeve, impeller, coupling andstationary parts such as casing, stuffing box, distance piece, and bearing housing.

•Monitoring construction progress of all work performed by EPC Contractor, tank, equipment and piping mainly,issuing daily/weekly Reports for the Company Management

•Review and comments of Method Statements, I.T.P, Test Package, inspection of items from documents requiring Client attendance

•Ensure that all fabrication,welding,erection related records such as bill material,dimension, type of material and weld consumables

•Verification of Contractor check-list from Test-Package and witnessing the pressure-tests of (above/underground) piping systems installed

•Responsible of site personnel for piping and supports installation during construction structural and pipe-racks).

•Area Supervisor for punch-lists items clearance from Test-Packages in the piping and mechanical completion/precommissioning stages

•Conduct line checking together with Sub-Contractor prior to Hydro- testing and write any comment on the punch list form such as type of punch list A,B,C, etc if necessary

•Close-out of final punch-lists issued by team QCI and Client Representative ExxonMobil Cepu Ltd

Working at Company: PT.Saipem Indonesia Karimun Branch

Name of the Project: Jangkrik Complex FPU Project Kalimantan

Name of the Client: ENI Saipem Joint Venture Chyoda &TripatraEng

Position: QC Piping Inspector

Inclusive Date: From 13,October,2014 up to 12,April,2015

Responsibilities:

• Conduct Fit-Up Inspection before welding and oversee piping fabrication, assembly and site installation

to ensure comply with project specifications

• Carry out Fit-Up inspection and check dimension as per drawing before welding

• Verify material to be use for fabrication and monitor welding parameters in accordance with the approved WPS.

• Perform inspection, assessment, analyze and coordinating with clients,contractor to carry out siteinstallation

• Cordinate and communicated with fabrication supervisor, fitter, welders Inspection personnel.

• Monitoring and flo up of quality document as per ISO standards.

• Monitoring of consumable storage,handling, packing,draying temperature as per project approved procedure

• Request / schedule NDE such as RT,UT, MPI & PT as per NDT requirement.

• Ensure that all fabrication,welding,erection related records such as bill material,dimension, type of material and welding consumables

• Witness / monitoring and review NDT including ensure Quality and safety procedure implemented

Working at Company: PT.Cladtek BI Metal Manufacturing Indonesia.

Name of the Project: Arabiyah & Hasbah Offsore and Onshore Facilities, MCDermott Dubai Inc

Name of the Client: Saudi Aramco & Saipem

Position: Supervisor Piping Fabrication shop

Inclusive Date: From 02,September,2013, up to 08,March, 2014

Responsibilities:

•Prepare material requisitions for tools and consumables.

•Monitor daily / weekly activities and coordinate with other sections as per pre established schedule.

•Ensure to maintain the quality of works and make daily reports for the progress of work

•Assist qa / qc for inspection of item prior to work standard and procedure

•Conduct daily/ weekly routine inspection and make necessary recommendations according to proces piping

•Attend coordination meetings and discussions with client Representative Aramco

•Supervising piping foremen over pipe fabricator, fabricating installing pipe and supports.

•Proficiently execute skills in installing pipes,control valves, pumps, and many other components

•Maintain a positive attitude and strong work ethic while solving problems under extreme pressure

•Review Job Safety Analysis to ensure completeness of resources, including information, tools,and material to complete assigned tasks safely.

•Ensure that all fabrication,welding,erection related records such as bill material,dimension,type of material and weld consumables

•Check and monitor the installed piping components as per P&ID and reviewing iso metric,support drawing and detail, type of Fitting / Valves, Flanges, Reducer, Elbow, TEEs,Bolt / Nut,Gasket,etc

•Conduct monitor and record pipe spools as per ISO metric during fabrication / after completed fabrication to be release for painting

Working at Company: WorleyParsons

Name of the Project: Sumatera Light North Operation Duri Riau Indonesia

Name of the Client: Chevron Pacific Indonesia

Position: Construction Supervisor Piping and Structural

Inclusive Date: From 10,May,2013 up to 09,August,2013

Responsibilities:

•To manage and coordinate with Foreman to determine manpower requirements

•Determine job priorities make plans and ensure to aintain the quality of works

•Make daily / weekly reports for the progress of work and reporting to the Superintendent

•Initiate safety precautionary measures to the workers and to the workplace as well

•Maintain a high standard of quality control at all times

•Attend coordination meetings and discussions with clients Representative

•Prepare reports and forecasts, job manpower forecasts and expenditures forecast.Supervising pipe foremen over pipe welder/pipe fabricator, fabricating / installing pipe and supports.

•Walk down systems with P&ID and to verify making punch list of unresolved items.

•Recognize employee's strengths and weakness to ensure their success Proficiency in Piping and Structural layout,subcontractors scheduling, material procurement, safety policies implementation, and lockout tag out procedure and demonstrate expertise in utilizing various hand tools along with power tools

Working at Company: PT. Prima Megah Jaya, Joint Venture PT.SMOE Indonesia Name of the Project: Naga and Pelikan,Well Head Platform deck /Jacket.

Name of the Client: Premier Oil Sea Natuna BV.

Position: Construction Supervisor Piping and Structural

Inclusive Date: From 03, Nov, 2012 up to 02,May,2013.

Responsibilities:

• To plan and Coordinate with Foreman to determine manpower requirements

•Determine job priorities and make plans

•Make daily/weekly reports for the progress of work

•Ensure to maintain the quality of works

•Initiate safety precautionary measures to the workers and to the workplace as well

•Maintain a high standard of quality control at all times

•Attend coordination meetings and discussions with clients

•Prepare reports and forecasts, job manpower forecasts and expenditures forecast.Supervising piping Foremen and Structure Foreman over pipe welder/pipe fabricator, fabricating / installing pipe and supports.

•Walk down systems with P&IDs and ISO's to verify and making punch list of unresolved items.

•Handle Job Safety Analysis to ensure completeness of resources, including information,tools,and material needed by staff to complete assigned tasks safely.

Working at Company: McConnell Dowell New Caledonia.

Name of Project: Mining Nickel New Caledonia. Name of the Client: Koniambo Sas / Tecnip

Position: Construction Supervisor Piping / Mechanical

Inclusive Date: From 10,November, 2011 up to 18,August,2012.

Responsibilities:

•To plan piping department production and liaise with project superintendent.

•Supervising pipe foremen over pipe welder/pipe fabricator / installing pipe support and assist the Foreman with any problem.

•Conduct request material base on project contract specification.

•Assist with logistic movement of material and store.

•Attend coordination meetings and discussions with client

•Demonstrate expertise in utilizing various hand tools along with power tools

•Handle Job Safety Analysis to ensure completeness of resources, including information, tools, and material needed by staff to complete assigned tasks safely

•Implemented hydrostatic tests on systems to ensure they will function under the designed pressures and temperatures

•Lead and supervise teamwork to carry out equipment installation, parts assembly and trouble shooting.

•Provide document site installation, troubleshooting to client and reporting site activity to project manager include give feedback to management to develop engineering for future project.

Working at Company: Wasco Energy Ltd. Indonesia.

Name of the Project: PNG-LNG PAPUA NEW GUINEA.

Name of the Client: Exxon Mobil, Chiyoda JGC Joint Venture

Position: QC Inspector Architectural and Structure

Inclusive Date: From 27,February,2011 up to 08,October,2011.

Responsibilities:

•Conduct inspection incoming material for damages,dimension,corrosions and ensure that material test certificate is available according to project Requirements.

•Ensure that the requirements for material, all weld, welders and welding activities are correctly and carried out in accordance with relevant codes, client specifications and contract standards.

•Identify the material I-Beam,Plate,Girder beam,Hollow steel,Pipe etc as per the material take of list and Structure drawing during fabrication.

•Perform fit up inspection and weld inspection carried out against latest AFC drawing revision.

•Prepare and issue document (Request for inspection to Client) and NDT request.

•Monitor welder’s performance qualification tests.

•Dimensional check before and after welding as per drawing and prepared MDR

•Follow up punch list from Client Representative

Working at Company: Al Mojil Group / MMG Ltd, Saudi Arabia ( Jubail )

Name of Project: SASREF( Saudi Aramco Shell Refinery)

Name of the Client: Saudi Aramco / CB&I

Position: Construction Supervisor Piping / Mechanical

Inclusive Date: From 10,April,2008 up to 02,October,2010.

Responsibilities:

• Prepare material requisitions for tools and consumables to be use for fabrication

•Monitor daily/ weekly activities and coordinate with other sections as per pre – established schedule.

•Determine job priorities and make plans for daily, weekly and long term activities.

•Make daily/weekly reports for the progress of work.

•Ensure to maintain the quality of works for my scope

•Assist QC/QA for inspection of item prior to work standard and procedure

•Investigations and recommends for Foreman approval required repairs or replacement of defective plant and equipment ensure conformity with approved standards and codes.

•Reviews construction/modification drawings

•Supervising pipe foremen over pipe welder/pipe, fabricating / installing pipe and supports.

•Walk down systems with P&ID, ISO, verify and making punch list of unresolved items.

•Maintain a positive attitude and strong work ethic while solving problems under extreme pressure

•Organize the safety and day to day operations to maximize efficiency

Working at Company: PT.Nippon Steel Batam

Name of the Project: Peciko 5 / Sisi Nubi Well Head Total Kalimantan

Name of the Client: Total E&P Indonesia

Position: QC Piping Inspector

Inclusive Date: From 24,July,2007 up to 23,December,2007

Responsibilities:

•Check/Verify Material to be use for fabrication and monitor welding parameters in accordance with the approved WPS.

•Carry out Fit-Up inspection and check dimension as per drawing before welding

•Witness/monitoring and review NDT including ensure Quality and safety procedure implemented

•Witness/monitoring and review Pipeline pre commissioning carried out as per project requirements

•Conduct line checking of test packages prior to hydrosatest test line, flow line, scrapper trap area and wellhead piping

•Preparetion test requirement of each test packages and facile close out any outstanding punchlist item.

•Conduct Post punchlist (Reinstatement) of line per system together with Client Representative Total E&P

Working at Company: PT.SMOE Indonesia / Sembawang Marine Offshore Engineering

Name of the Project: FPSO Bohai Penglai China Phase 2 & CPP Total Tunu Kalimantan

Name of the Client: ConocoPhilips & Total E&P Indonesia

Position: Construction Piping Supervisor

Inclusive Date: From 23,March,2006 up to 22,June,2007

Responsibilities:

• Manage and coordinate with Foreman to determine manpower requirements

• Determine job priorities and make plans

• Make daily/weekly reports for the progress of work

• Ensure to maintain the quality of works

• Initiate safety precautionary measures to the workers and to the workplace as well

• Maintain a high standard of quality control at all times

• Attend coordination meetings and discussions with clients

• Prepare reports and forecasts, job manpower forecasts and expenditures forecast.Supervising pipe

foremen over pipe welder/pipe fabricator, fabricating / installing pipe and supports.

• Walk down systems with P&IDs and ISO's to verify and making punch list of unresolved items.

• Review Job Safety Analysis to ensure completeness of resources, including information, tools, and

material needed by staff to complete assigned tasks safely

Working at Company: PT.Nippon Steel Batam Indonesia

Name of Project: Total Yadana and Premier Oil Anoa AGX Jacket/Deck

Name of Client: Total E&P Myanmar and Premier Oil BV Natuna Sea

Position; QC Inspector Piping / Mechanical

Inclusive Date: From 17,February,2000 up to 16,February,2006.

Responsibilities:

•Review Quality Control Inspection Plan (QCIP) and WPS their implementation at site.

•Conduct lay-out and cutting inspection with reference to approved drawings and Verify material to be use for fabricated.

•Conduct inspection of incoming Client Total E&P supplied material and fabrication.

•Conduct daily/ weekly routine inspection and make necessary recommendations according to process piping specification.

•Monitor/check welders Qualification Record (WQR) to ensure comformance to the approved WPS in process piping as ANSI /ASME B31,3.

•Conduct visual inspection on welds and request schedule for RT, UT, MT & PT.

•Monitoring/Inspection of completed fabricated compirmate to costumer’s specifications requirements.

•Positive material Identification inspection with NDE sub-contractor and update reports.

•Preparetion test requirement of each test packages and facile close out any outstanding punchlist item.

•Review and study the project specification requirement and engineering requirement.

•Review and verify the material test certificate and inspections of fabrication & erection.

•Witness inspection to all type of testing as instructed ensuring that the testing method, inspection

•Methods and acceptable criteria are in accordance with agreed procedure and standards.

•Reviewing the hydro test package and walk through for preparing pre-test punch list.

•Witnessing the flushing, leak testing (hydro, pneumatic and helium) and system lay-up addition to preparing required quality control documents.

•Gasket verification & final bolt Torquing /Tensioning inspections, verification as per project specification.

•Final inspection reinstatement and completion of test packages adding all inspection records and test reports.

•Performing receiving and installation inspections of static and rotary equipment.

•Internal inspection of pressure vessels and witnessing final closure with the client.

•Ensure that all equipment records/inspection programs are updated with inspection reports/certificate.

•Preservation of equipment as per specification, and ensure all inspection, test and final release.

•Conduct Post punchlist (Reinstatement) of line per system together with client Representative

COURSES AND TRAINING

•Welding Inspector CSWIP 3.0 & 3.1 by TWI Certification PT.Beyond Yogjakarta Ltd, Granta Park, Great Abington, Cambridge CB21 6AL, UK. 2000 & 2012

•Welding Inspector at IKBAL-M-YOS Batam – Indonesia.

•Familiarity with NDT Test (MT/PT, UT and RI).

•Familiar with welding symbol, welding design, P&ID, Instrument and technical drawing as well.

•Magnetic Test ASNT Level II at PT. Multi Spec Sinergindo Batam – Indonesia.

•Penetrant Test ASNT Level II at PT. Multi Spec Sinergindo Batam – Indonesia.

•Ultrasonic Test ASNT Level II at PT. Multi Spec Sinergindo Batam – Indonesia.

SKILL AND SOFTWARE ABILITY

•Familiar with QCS System.

•Familiar wiyh MS Office (Word, Excel, Access, and MS Office Project)

TRAINING/ SEMINAR ATTENDED:

•Confined Space Training by PT. McConnell Dowell ( New Caledonia & Australia )

•Working at Height Training by PT.SMOE Indonesia

•Quality and Environmental Audit by Saudi Aramco. ( Saudi Arabia ) Confined Space Training by PT. Tripatra Engineering / ExxonMobil Cepu Ltd ( EMCL )

•H2s Training, PWT Training, Confined Space Training and WAH Training By,

ExxonMobil Cepu Ltd ( EMCL ) East Java – Indonesia

•Training Platform Safety Induction Program ANOA Gas Export Project Premier Oil Natuna Sea Limited By HSE Representative Premier Oil Natuna Sea Limited { PONSL )

•Training Leadership Program Tangguh Expansion Project By CSTS (Chiyoda,Saipem,Tripatra,Sae) JO

•Training Gateway Program Tangguh Expansion Project by CSTS (Chiyoda,Saipem,Tripatra,Sae) JO

•PWT Training,Confined Space Training and WAH Training By CSTS (Chiyoda,Saipem,Tripatra,Sae) JO

•Training Leadership Program Tangguh Expansion Project By CSTS (Chiyoda,Saipem,Tripatra,Sae) JO

I hereby certify that all statements in this data are true and correct to the best of my knowledge and belief.

Robert Manurung