Resume:

Tarek Mohamed Melegy Elshiekh

***- ******* ***** **, *******, Cairo, Egypt

010********010********

adzk8h@r.postjobfree.com

Summary

Dear All,

I have over 15 years of experience as an electrical engineer, and I specialize in electrical construction and manufactures i hoping to expand its business to include new experience, and I believe that I am the suitable, candidate for this job and Some highlights of my career include:

● Consultant engineer, Project Manager, QC, QA Engineer, Site Engineer, maintenance Manager I hope to discuss how my experience would be a benefit to your company and projects in the coming years.

PROFESSIONAL EXPERIENCE.

Electrical Consultant Engineer from 4/2021 to Now.

Khatib & Alami

1-Project: ( LRT ) Project

2-Owner: National Authority for Tunnels (NAT).

3- Company: Khatib & Alami engineering consultants. 4- . Position: All Stations from Adly Mansour to New Capital,10th of Ramadan. 5- Summary of project Description: Electromechanical systems as Power Substation, Electrical Panels, power lighting.

Tasks and Experiences: -

Responsible for:

Support to Carry MV & LV Electrical Works and installations for the passengers’ stations.

Supports the supervisors/Subcontractors throughout the project phase

Provide and submit periodic reports on the sites as a progress report, daily report, weekly report and monthly report during the project life cycle.

Develop project schedules, deliverable plan and resources under the supervision of the direct manager & team leader.

Coordinates the work & progress with the Team Leaders.

Comprehend customer requirements and make appropriate recommendations during Site activities.

Follow up on receiving project materials, equipment, attending the FAT tests of materials and equipment according to spec of project according to company policies.Problems predict and work to solve them before occur.

Follow up the quality of the executed works through the implementing contractor and submit reports to the owner.

Overseeing electrical work, Supervising contracted electrical staff and Problem solving.

Inspect project sites to monitor progress and ensure conformance to electrical design specifications and safety.

Finally, approving the final observations after implementation, supervising their implementation, releasing the final guarantee to the contractor, and handing over the project to the authority that owner.

Quality Control Manager from 11/ 2020 to 4/2021.

CREEC- AVIC INTL Consortium ( CREEC-AVIC ) :

1-Project: ( LRT ) Project

2-Owner: National Authority for Tunnels (NAT).

3- Company: CREEC- AVIC INTL Consortium .

4- . Position: All Stations from Adly Mansour to New Capital,10th of Ramadan. 5- Summary of project Description: Electromechanical systems as Power Substation, Electrical Panels, power lighting.

Tasks and Experiences: -

Responsible for :

Review and study thoroughly project specifications, project drawings, and quality related contract requirements, prepare/ review inspection test plans.

Review and update product plans and make recommendations for material selection based on project requirements, coordinate for factory inspection with client and consultant.

Coordinate all internal and external inspection request[ IR ] with consultant and client to ensure its compliance with standards, internal and external inspection requests as NCR, MIR, SI, etc and Conduct training session meetings regarding quality system and document implementation on project.

Conduct weekly QA/QC meetings related to all QA/QC issues problems to discussed and resolved effectively and record of minutes of meeting [MOM].

PROJECT MANAGER from 9/ 2018 to 11/2020 .

SINA LIGHT FOR ELECTROMECHANICAL ( SLC ) :

1- Project: (Damietta Port Authority) Project in Damietta port. 2- Project: (Car service center) Project in fifth settlement. 3- Owner: - Egyptian Ministry of Transport, Private Sector 4- Company: - SINA LIGHT FOR ELECTROMECHANICAL.

5- Position: PROJECT Manager.

6- Summary of project Description:

- Administrative building - Power Substation – Infrastructure -landscape – Electrical Panels

– Pole light – High Mast

Tasks and Experiences: -

Responsible for :

Responsible for develops a cost-effective plan and schedule for completion of project and check project plans, all shop drawing and feasibility study for projects

Responsible for minimizes exposure and risk by implementing and audits safety standards.

Coordinates work of subcontractors working on various phases of project and coordinate between consultants, contractors, property owners and other utility services.

Supervises engineering and reviews their reports, checks on any problems and solve it.

Responsible for Tracks and controls project schedule and associated costs toachieve completion of project within time, monies, all reports to owner

Responsible for all electromechanical (MEP) works in site as LV, M, Transformers, Generators, low voltage electrical panels and all cables in infra-structure area.

Responsible for supervise office staff for all administrative works.

Electrical Manager and Technical Office in Site: from 10/ 2017 to 9/ 2018

Universal <ALAMIA> Construction Company:

1- Project: (ELMANSOURA 2) Mega Construction Project in New Capital 2- Owner: - Egyptian Intelligence Service (GIS ) . 3- Company: - Universal Construction Company.

4- Position: Electrical Manager and Technical Office Engineer 5- Summary of project Description:

- administration buildings (Hospital-Hotel -Restaurant– Mosque-Gymnasium - Administrative building- Dog building and Power Substation – Infrastructure -landscape ) Tasks and Experiences: -

Responsible for :

Responsible for all electrical installations in buildings, Compiling Installationscopes of work, installations, startup, operation substationsand project reports.

Responsible for receiving all works from subcontractors according to technical drawing

( SD) and inventory works for contractors, internal and external invoices .

Responsible for all inventory, flow up purchase, cost analysis, schedule time for project and follow up the work in site.

Responsible for review shop drawing (SD) according requirements from consultant and make asbilt for site.

Responsible for panel schedule, phase panel for all electrical panels, upstream for mainpanels and cable trays filling ratio in site.

Responsible for install and receiving works from subcontractors of light current as CCTV, Access control, Audio Visual, fire alarm, telephone and grounding systems.

Electrical Site manager and Site Engineer: from 9/ 2016 to 10/ 2017

EL Serafy Engineering ( GE ) :

1- Project: (ELMANSOURA 2) Mega Construction Project in New Capital 2- Owner: - Egyptian Intelligence Service (GIS ) . 3- Company: - ELSERAFY FOR ENGINEERING Company.

4- Position: Electrical Manager and Electrical Engineer. 5- Summary of project Description:

- Administration buildings (Hospital-Hotel -Restaurant-Administrative building- and Power Substation )

Tasks and Experiences: -

Responsible for :

Responsible for all electromechanical installations (MEB) buildings, testing of spectra series Bus way, AVR, transformers, generators, in substations, cable trays, ladders, design filling ratio for cable trays, MDB, DB’s and UPS, batteries,capacitor bank, MV cables, LV cables.

Responsible for receiving all works from contractors according to technical drawing(SD).

Participate in drafting the maintenance plane (PM) for WADI ALNILE hospital.

Responsible for install and receiving works from subcontractors of light current as CCTV, Access control, Audio Visual, fire alarm, telephone and grounding systems.

WADI GROUP: from 2006 to 2016

Installation and maintenance sector.

Installation and Maintenance Manager for Industrial Sector.

Wadi group: from 4/2016 to 10/2016

1- Project: (Industrial WADI GROUP) Mega Project in Nubaria,Sadat city 2- Owner: - Tony Frege- invested

3- Company:- WADI GROUP HOLDING .

4- Position:- Installation and Maintenance Manager. 5- Summary of project Description:

- (Administrative building- oil factories – feed factories-animal medicine factories-paper factories- phosphates factories-animal feed factories and Power Substation ) Tasks and Experiences: -

Responsible for :

Responsible for all new electrical and mechanical installations in the industrialsector.

Develop maintenance procedures and ensure implementation in all sites.

Carry out inspections of the facilities to identify and resolve issues.

Follow up the work of maintenance managers in the sites and monitor equipment inventory and flow up purchase

Ensure health and safety policies are complied

Report maintenance plans, implementation and send them to managers

Provide training for maintenance, operation personals on electromechanicalsystems and preparing electrical designs for large-scale industrial projects.

Senior Electrical Engineer and Assistant manager (General) : from 7/2015 to 3/2016

Wadi group soya plant :-

1- Project: (SOYA FACTORY) Mega Project in Sadat city 2- Owner: - Tony Frege- invested

3- Company:- WADI GROUP HOLDING .

4- Position:- Senior Electrical, Installation Engineer and Assistant manager. 5- Summary of project Description:

- (Administrative building- install and maintenance oil factories and Power Substation) Tasks and Experiences:

Responsible for :

Assist Maintenance Manager to develop maintenance and installations plans in site.

Follow up the work and installations of utilities as (generators, boilers, chillers, loader, Clarks, HVAC systems) in the sites.

Installation and Maintenance manager (General): from 6/2012 to 7/2015

Wadi group soya plant:

1- Project: (SOYA FACTORY) Mega Project in Sadat city 2- Owner: - Tony Frege- invested

3- Company:- WADI GROUP HOLDING .

4- Position:- Installation and maintenance manager. 5- Summary of project Description:

- (Administrative building- installation and maintenance mechanical, electrical oil factories and Power Substation)

Tasks and Experiences: -

Responsible for :

esponsible for save production costs by identifying strategic improvements toproduct life cycle during a New Product Development process.

Responsible for all new installation of electrical and mechanical installations in the factory

Played key role in ensuring team efforts met and exceeded all financial, performance, quality and reliability goals

Centralized purchasing, created a core component list and consolidated the supplierbase to reduce material costs

Successfully developed testing validation procedures leading to a increase in sensor reliability.

Conceived solution to improve high resolution analog measurements and increase production quality

Contributed to increased throughput by rapidly diagnosing and correcting issues that impacted baseline performance

Successfully leveraged sound signal integrity principles and noise reduction leadingto improved system reliability.

Installation and Maintenance manager (General): from 6/2012 to 7/2015

Wadi group soya plant:

1- Project: (SOYA FACTORY) Mega Project in Sadat city 2- Owner: - Tony Frege- invested

3- Company:- WADI GROUP HOLDING .

4- Position:- Installation and maintenance manager. 5- Summary of project Description:

- (Administrative building- installation and maintenance mechanical, electrical oil factories and Power Substation)

Senior Electrical Engineer : from 2/2010 to 6/2012

Wadi group soya plant :

1- Project: (SOYA FACTORY) Mega Project in Sadat city 2- Owner: - Tony Frege- invested

3- Company:- WADI GROUP HOLDING .

4- Position:- Senior Electrical Engineer.

5- Summary of project Description:

- (Administrative building- installation and maintenance electrical oil factories and Power Substation)

Tasks and Experiences: -

Responsible for :

Responsible for all new installation of electrical in the factory

Develop electrical maintenance procedures and ensure implementation

Carry out inspections of the electrical facilities to identify and resolve issues

Follow up the work of electrical maintenance engineers in the sites

Monitor electrical equipment inventory and flow up purchase

Manage electrical relationships with contractors and service providers

Ensure health and safety policies are complied with

Report electrical maintenance plans, implementation and send them to managers

Installation and Maintenance Department Chief: from 7/2008 to 4/2010

Wadi group (Hatchery site) :

1- Project: (Hatchery site ) Mega Project in Sadat city 2- Owner: - Tony Frege- invested

3- Company:- WADI GROUP HOLDING .

4- Position:- Installation and Maintenance Department Chief. 5- Summary of project Description:

- (Administrative building- installation and maintenance electrical hatchery site and PowerSubstation)

Tasks and Experiences: -

Responsible for :

All maintenance for hatchery machine.

generators (from 40KVA to 700KVA)

Follow-up operation and maintenance of the air compressor.

chiller maintenance (Petra and train)

Power Distributor System

Programing PLC ( DELTA, HETACHI )

Three Phase Induction Motors.

Variable Frequency Driver [ HITACHI – MITSUBISHI–Delta -ABB ]

Power Factor Correction Capacitors.

Transducers [(temperature sensors: PT100&RTD) – (Capacitive sensors) Photocell].

Steam Boiler maintenance.

Follow-up operation and maintenance all automatic doors for machines, storage and glasses doors.

Instrumentation and maintenance control & Engineer ConstructionEngineer : from 2/2006 to 7/2008

Wadi group Feed factory:

Project: (WADI FEED) Mega Project in Nubaria city 1-Owner: - Tony Frege- invested

2-Company:- WADI GROUP HOLDING .

3- Position:- maintenance engineer.

4- Summary of project Description:

- (Administrative building- installation and maintenance electrical engineer and Power Substation)

Tasks and Experiences: -

Construction Basics, Low and Medium Voltage Cables, Cable sizing, Cutting, Pulling and Termination.

Cable trays, Conduits and Ducts.

Testing and Loop check.

Industrial safety rules, Steam Boiler maintenance, Follow-up operation and maintenance of the air compressor

KEY SKILLS

Technical Skills,

Cable sizing, voltage drop, short circuit calculations, SLD, panel schedules.

Shop drawing by Auto CAD, MS office (word, excel, power point)

Management team work.

Project schedule time and ability to work under pressure

Electrical, Electronic Measurements and Instrumentation, Electronics, photocell, limit switches, capacitive, inductive sensors, electronic and Control Circuits

lean manufacturing

Ability to communicate clearly in the English language; both verbally, writing, reading.

Strong team player with good interpersonal and Strong interpersonal skill

PROFESSIONAL CERTIFICATES

Pump, boilers, compressors, PLC and pumps (Arab Academy for Science

, Technology& Maritime Transport)

Pneumatic control system (Arcane Technology, Sadat city)

Preventive Maintenance (Gulf Technical &Safety Training Center (L.L.C))

Specialist safety and occupational health (HSE) in the workers' cultural institution

EDUCATION

Bachelor's degree in Electrical and Electronic Engineering.

Year: 2005

Faculty of Electronic Engineering - Menoufia University



Contact this candidate